0% found this document useful (0 votes)
58 views1 page

Summary of Inspection Report

The document summarizes an inspection report for wellhead equipment issued to Camar Resource. It lists 6 items that were inspected, including casing head and Xmas tree assemblies. It provides recommendations to redress areas with pitting, replace outdated rubber seals, and apply grease to valves and chokes.

Uploaded by

PT. Eban
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
58 views1 page

Summary of Inspection Report

The document summarizes an inspection report for wellhead equipment issued to Camar Resource. It lists 6 items that were inspected, including casing head and Xmas tree assemblies. It provides recommendations to redress areas with pitting, replace outdated rubber seals, and apply grease to valves and chokes.

Uploaded by

PT. Eban
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

PT.

MITRA KATUP NUSANTARA


[Head Office] Komp. Taman Serua, Blok D No.5 Rt/Rw 003/008 Kel. Serua Kec. Bojongsari, Kota Depok, Jawa Barat 16517,
Phone: 021-7447739 Fax: 021-7447739
[Operation Office] Ruko Sawangan Green Park No.A1, Jalan Raya Curug, Bojongsari, Kota Depok, Jawa Barat 16517,
Phone: 0251-8606945 Fax: 0251-8606945
Email: [email protected]

Summary of Inspection Report

Date of Issued : 23 April 2020


Client : Camar Resource
Recent Address :
August 15, 2008
We hereby Summary of Inspection Report that the following item(s) have/has been fully inspected
accordance to stipulations of:
1. Latest API Specification –6A,
2. The Applicable PT. Mitra Katup Nusantara Procedures & Specification,

No. Qty Serial Number Description of Equipment

1. 1 Set n/a - Sec A Box #01 (Wellhead Casing Head Assembly)


1. 1 Set n/a - Sec A Box #02 (Wellhead Casing Head Assembly)
1. 1 Set n/a - Sec A Box #07 (Wellhead Casing Head Assembly)
3. 1 Set n/a - Sec C Box #01 (X’Mas Tree Assembly)
4. 1 Set n/a - Sec C Box #02 (X’Mas Tree Assembly)

All Equipment of Wellhead are ready to be prepare for 3 Well site, after onsite redress.
Our recommendation for all the Wellhead & X’Mass tree :
1. Redress Inside Diameter of Casing Head, sealing area had pitting condition
2. Redress Inside Diameter of Tubing Spool, sealing area had pitting condition
3. Have to replace all the Rubber Seal because already out of date
4. All gate valve need to be greasing, to make stem packing better movement
5. All Adjustable Choke need to be greasing, to make stem packing better movement

In completeness the aforementioned, we herein have attached the supporting document(s) as


received evidence for this release:
1. Data Inspection Report.

Authorized by Approved by
PT. Mitra Katup Nusantara Customer’s Representative / Company Man

Wisnu N Eban