EPC Contractor - M/s Gayatri Projects LTD

The document outlines details of backup generators used on a six lane expressway project in Haryana and Uttar Pradesh from km 114 to km 136. It lists 5 diesel generator sets ranging from 62.5 to 125 kVA located at various points along the expressway. The generators were used from May 2018 to November 2021 by the EPC contractor M/s Gayatri Projects Ltd.

Uploaded by

Deep Choudhary
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
138 views6 pages

EPC Contractor - M/s Gayatri Projects LTD

The document outlines details of backup generators used on a six lane expressway project in Haryana and Uttar Pradesh from km 114 to km 136. It lists 5 diesel generator sets ranging from 62.5 to 125 kVA located at various points along the expressway. The generators were used from May 2018 to November 2021 by the EPC contractor M/s Gayatri Projects Ltd.

Uploaded by

Deep Choudhary
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

Development of Six lane Eastern Peripheral expressway (NH NO.

NE -II)
in the states of Haryana and Uttar Pradesh Package-VI from Km 114.000
to KM 136.000 on EPC Mode.

BACKUP GENERATORS
DG SET-1 No
DG- 62.5 KVA
Location: Ramp-1
Period: 26th May 2018 to 30th November 2021

HSD SITE ISSUE REGISTER

EPC Contractor – M/s Gayatri Projects Ltd


Development of Six lane Eastern Peripheral expressway (NH NO. NE -II)
in the states of Haryana and Uttar Pradesh Package-VI from Km 114.000
to KM 136.000 on EPC Mode.

BACKUP GENERATORS
DG SET-3 No
DG- 125 KVA
Location: Entry main plaza to Agra canal
Period: 26th May 2018 to 30th November 2021

HSD SITE ISSUE REGISTER

EPC Contractor – M/s Gayatri Projects Ltd


Development of Six lane Eastern Peripheral expressway (NH NO. NE -II)
in the states of Haryana and Uttar Pradesh Package-VI from Km 114.000
to KM 136.000 on EPC Mode.

BACKUP GENERATORS
DG SET-1 No
DG- 125 KVA
Location: Exit Toll plaza at Admin Building
Period: 26th May 2018 to 30th November 2021

HSD SITE ISSUE REGISTER

EPC Contractor – M/s Gayatri Projects Ltd


Development of Six lane Eastern Peripheral expressway (NH NO. NE -II)
in the states of Haryana and Uttar Pradesh Package-VI from Km 114.000
to KM 136.000 on EPC Mode.

BACKUP GENERATORS
DG SET-2 No
DG- 125 KVA
Location: Exit Toll plaza at Admin Building
Period: 26th May 2018 to 30th November 2021

HSD SITE ISSUE REGISTER

EPC Contractor – M/s Gayatri Projects Ltd


Development of Six lane Eastern Peripheral expressway (NH NO. NE -II)
in the states of Haryana and Uttar Pradesh Package-VI from Km 114.000
to KM 136.000 on EPC Mode.

BACKUP GENERATORS
DG SET-4 No
DG- 125 KVA
Location: ROB to Interchange flyover
Period: 26th May 2018 to 30th November 2021

HSD SITE ISSUE REGISTER

EPC Contractor – M/s Gayatri Projects Ltd


Development of Six lane Eastern Peripheral expressway (NH NO. NE -II)
in the states of Haryana and Uttar Pradesh Package-VI from Km 114.000
to KM 136.000 on EPC Mode.

BACKUP GENERATORS
DG SET-5 No
DG- 125 KVA
Location: Interchange flyover to 136+000
Period: 26th May 2018 to 30th November 2021

HSD SITE ISSUE REGISTER

EPC Contractor – M/s Gayatri Projects Ltd