Title SPECIFICATION FOR PIPING STANDARD
Document No. ELT-01-EP-TS-0004
Revision No. 0
Page No. 1 of 4
SPECIFICATION FOR PIPING STANDARD
Project Title : Andres LNG Terminal Expansion Project
Location : Punta Caucedo, Boca Chica, Dominican Republic
Owner : ENERGÍA NATURAL DOMINICANA ENADOM, S. R. L.
Contractor : POSCO Engineering & Construction Co., Ltd.
Discipline : Piping
FOR FINAL
0 01 Jul 2021 Issue for Final M.H Yang Y.B Park H.S Yoo J.M Oh
B 09 Jun 2021 Issue for Review M.H Yang Y.B Park H.S Yoo J.M Oh
A 19 Mar 2021 Issue for Review M.H Yang Y.B Park H.S Yoo J.M Oh
Rev. No. Issue Date Revision Text Prepared Checked Reviewed Approved
The contents of this document are the sole property of POSCO E&C. Any rights not expressly granted
herein are reserved. Reproduction, transfer or distribution of part or all of the contents in any form without
the prior written permission of POSCO E&C is prohibited.
Title SPECIFICATION FOR PIPING STANDARD
Document No. ELT-01-EP-TS-0004
Revision No. 0
Page No. 2 of 4
TABLE OF CONTENTS
1. GENERAL ................................................................................................................................................................................ 3
2. RELATED SPECIFICATION AND DRAWING ............................................................................................................. 3
3. ABBREVIATION .................................................................................................................................................................... 3
4. STANDARD DRAWING LIST FOR PIPING-INSTRUMENT INSTALLATION ................................................. 3
Title SPECIFICATION FOR PIPING STANDARD
Document No. ELT-01-EP-TS-0004
Revision No. 0
Page No. 3 of 4
1. GENERAL
1.1. Scope
This documents covers the guidelines for construction, installation and the separation of scope
of works between piping and instrument for Andres LNG Terminal Expansion Project in Cabo
Caucedo, Dominican Republic.
1.2. Definition
Entities related to the project are as below.
PROJECT : Andres LNG Terminal Expansion Project
OWNER : ENERGÍA NATURAL DOMINICANA ENADOM, S. R. L.
EPC CONTRACTOR : POSCO E&C. Co. Ltd (PEC)
VENDOR : Supplier of each piece of equipment or package
2. RELATED SPECIFICATION AND DRAWING
The following specifications and drawings prescribe items of related work.
ELT-01-ER-DWG-0003 Piping and Instrument Diagram (P&ID)
ELT-01-EP-TS-0001 Design Criteria for Piping
ELT-01-EP-TS-0003 Specification for Piping Material
ELT-01-EI-DWG-0007 Instrument Impulse Piping Hook up Drawings
3. ABBREVIATION
ABB DESCRIPTION ABB DESCRIPTION
BLE Bevel Large End PMS Piping Materail Specification
BW Butted Weld POE Plain One End
CSO Car Seal Open PSE Plain Small End
FF Flat Face SW Socket Weld
NPT National Pipe Thread TE Threaded End
PBE Plain Both End TOE Thread One End
PE Plain End WN Welding Neck
4. STANDARD DRAWING LIST FOR PIPING-INSTRUMENT INSTALLATION
4.1. Installation of Pressure Tap
4.2. Installation of Thermowell
4.3. Installation of Level Transmitter
Title SPECIFICATION FOR PIPING STANDARD
Document No. ELT-01-EP-TS-0004
Revision No. 0
Page No. 4 of 4
4.4. Detail of PSV, TSV
4.5. Installation of Vent and Drain
4.6. Bolt Table
4.7. Application of Jack Screw Flange
0