0% found this document useful (0 votes)
641 views1 page

Jsa n2 Purging PDF Free

This Job Safety Analysis sheet provides safety precautions for nitrogen purging. The key steps are planning, purging, and windup/housekeeping. Planning includes isolating equipment, draining contents, obtaining permits, and ensuring proper nitrogen supply. During purging, precautions must be taken for pressurized lines, flammable/toxic atmospheres, and improper tools. After purging, the area must be barricaded and signs posted, purged fluid disposed of safely, and tools/hoses disconnected and stored properly. Personal protective equipment like hard hats and safety gear is required.

Uploaded by

SKH Culture
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
641 views1 page

Jsa n2 Purging PDF Free

This Job Safety Analysis sheet provides safety precautions for nitrogen purging. The key steps are planning, purging, and windup/housekeeping. Planning includes isolating equipment, draining contents, obtaining permits, and ensuring proper nitrogen supply. During purging, precautions must be taken for pressurized lines, flammable/toxic atmospheres, and improper tools. After purging, the area must be barricaded and signs posted, purged fluid disposed of safely, and tools/hoses disconnected and stored properly. Personal protective equipment like hard hats and safety gear is required.

Uploaded by

SKH Culture
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Job Safety Analysis Sheet

JOB DESCRIPTION: Nitrogen Purging JSA Ref. No. JSA / KOC / 34

Facility: Work Area / Equipment: Permit No.


Date:

PERSONAL PROTECTIVE EQUIPMENT: Hard Hat, Safety Shoes, Hand Gloves, Safety Harness, BA Set / Airline Unit, Safety Goggles, Multi –
gas Detector,

SEQUENCE OF Yes /
POTENTIAL HAZARDS PRECAUTIONS
BASIC JOB STEPS No
 Plan the work involving personnel responsible for
Lack of Communication preparation (such as isolation, depressurization, draining,
venting, flushing) of the equipment / system to be purged.

Non-compliance of KOC  Refer Chapter – 11 “Crude Oil Storage, Pipeline & Oil Spill”
-HSEMS Procedures, F & S of KOC F & S Regions, and HSEMS Procedure Doc. No.
Regulations SA.KOC.004 “Permit to Work”

 Ensure the equipment / system to be purged is positively


isolated from all sources of energy (hydraulic, pneumatic,
Energized Equipment electrical etc.)
 Use multilock & tag for isolation carried out.
Planning
 Ensure the equipment / system is depressurized & content is
Pressurized Fluid
drained safely.

 Arrange the adequate Nitrogen Cylinders / Unit considering


the volume to be purged.
Nitrogen Cylinders / Unit
 Ensure the deployment of Nitrogen unit inside the plant does
not create any hazard for the facility.

Flammable & / or Toxic  Ensure the confined space is flushed, purged and
Atmosphere thoroughly ventilated as required.

Unauthorized Work  Obtain the required permits from the permit issuer.

 Ensure the tools (such as N2 Unit, Pump, Hose, Coupling &


Improper / Defective Tools
Pressure Gauges etc) to be used are free from defect.

Rupture of Nitrogen Supply  Ensure the N2 supply hoses and couplings are rated for the
Hoses & Couplings required service and pressure.

 Stay away from the pressurized N 2 hose & coupling to avoid


Cold Burn cold burn in case of leak.
 Barricade the area & post warning notice.
Purging
 Calculate the amount of N 2 required for the volume to be
Excess or Less Nitrogen purged.
Supply
 Keep a close watch on the N2 supply flow meter.

 Ensure the disposal of purged volume to a safe location


Unsafe Disposal of Purged Fluid
such as flare or vent.

 Do not enter a vessel / tank / pipeline which is purged with


Lack of Oxygen
N2.
 Ensure proper wind up & housekeeping at worksite.
Windup &
Scattered Material  The accessories (tools, hoses, couplings) must be disconnected
Housekeeping
and stored properly.

Additional Hazards
(Other than indicated
above)

Name: Designation:
KOC / ID. No. Company:
JSA Done By
Controlling Team: Contract No.(If Applicable):
Signature: Date:

You might also like