4M Change Control tracking sheet
1. Any Product process Changes with respect to 4 M & abnormal situation, will be recorded controlled and informed to management and customer of EEIPL (if required) for approval. No Change will be implemented
Month without management approval or customer approval (if required).
1. Incase of any Change, kindly fill the Reason for Change, Part name & No, Change Implementation Date at the time of submission every month.
Note : Incase of no change, write : "NO" in the below column. 2. All records related to any change should be maintain by Supplier
Customer Approval Document to be Submitted to Customer
Change Identification Change Implementation Document Change Details
Change Item
(Yes / No)
Reason for Change Part Name & No
Date submission Date (Incase of Change) Remarks
Inspection
Reqd Not Reqd CP/PFD Report /material PPAP PFMEA
TC
Different spec / grade
Raw material size/thickness/weight
Material Different raw material approved supplier
Any Child-part change (Machine/Supplier/MethodMaterial)
Child-part change (Perm Deviation)
Process change Sequence or Addition of process
New Technology
Sub-process supplier change
Method
Packaging change ( Bin/Trolley Dispatches)
Traceability (Batch code) marking change
Inspection method/ Inspection Frequency changed
Die /Tooling change ( Modification)
Machine change
Machine Welding fixtures change
Removal / Addition of Pokayoke
M/c parameter change
Signature
Name Mahesh Khatal Mr.Awdhut Kulkarni
Designation QMS Engineer QA Head Plant Manager