Load Test Log Sheet

This document records measurements taken during the start-up of a reciprocating compressor. It measures things like oil pressure, bearing temperatures, cylinder pressures and temperatures, and valve temperatures at intervals during the start-up process. The measurements are recorded to monitor the compressor and ensure safe and proper operation during start-up.

Uploaded by

deepak rai
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
60 views9 pages

Load Test Log Sheet

This document records measurements taken during the start-up of a reciprocating compressor. It measures things like oil pressure, bearing temperatures, cylinder pressures and temperatures, and valve temperatures at intervals during the start-up process. The measurements are recorded to monitor the compressor and ensure safe and proper operation during start-up.

Uploaded by

deepak rai
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

DRESSER-RAND

Reciprocating Compressor Installation Record


Field Services Start-up records
End user : DR contract n° :
Recip type : DR Project n° :
Serial number : Services dates from \: to :
Original start up date : Hrs nb: DR field rep. :
Customer machine Tag#: DR office support :

Loaded test
Date : Cylinder

OIL CIRCUIT CHECK Unit 05 Min 10 Min 30 Min 1 Hours 2 Hours 4 Hours
Lube oil pump pressure Kg/cm2g
Lube oil pressure Kg/cm2g
P oil filter Psig
Oil temperature crankcase °C
Oil t°F inlet bearing °F
T°F inlet water cooler °F
T°F outlet water cooler °F

Bearing

BEARING CONTROL Unit 05 Min 10 Min 30 Min 1 Hours 2 Hours 4 Hours


Bearing # 10-TE-560A °C
Bearing # 10-TE-561A °C
Bearing # 10-TE-562A °C
Bearing # 10-TE-563A °C
Bearing # 10-TE-564A °C
Bearing # 10-TE-565A °C

PROCESS CONTROL Unit 05 Min 10 Min 30 Min 2 Hours 3 Hours 4 Hours


Cylinder # 1
Suction pressure Kg/cm2g
Suction temperature °C
Discharge pressure Kg/cm2g
Discharge temperature °C
T°F cylinder water inlet °F
T°F cylinder water outlet °F
Cylinder # 2
Suction pressure Kg/cm2g
Suction temperature °C
Discharge pressure Kg/cm2g
Discharge temperature °C
T°F cylinder water inlet °F
T°F cylinder water outlet °F
Cylinder # 3
Suction pressure Psig
Suction temperature °F
Discharge pressure Psig
Discharge temperature °F
T°F cylinder water inlet °F
T°F cylinder water outlet °F

DR service representative : Customer approval:


Name: Name:
Sign Sign
Page : 1
DRESSER-RAND Maintenance check sheets for Recip compressor

Field Services Start-up records


End user : DR contract n° :
Recip type : DR Project n° :
Serial number : Services dates from :\ to :
Original start up date : Hrs nb: DR field rep. :
Customer machine Tag#: DR office support :

PROCESS CONTROL Unit 10 Min 20 Min 1 Hours 2 Hours 3 Hours 4 Hours


Cylinder # 4
Suction pressure Psig
Suction temperature °F
Discharge pressure Psig
Discharge temperature °F
T°F cylinder water inlet °F
T°F cylinder water outlet °F
Cylinder # 5
Suction pressure Psig
Suction temperature °F
Discharge pressure Psig
Discharge temperature °F
T°F cylinder water inlet °F
T°F cylinder water outlet °F
Cylinder # 6
Suction pressure Psig
Suction temperature °F
Discharge pressure Psig
Discharge temperature °F
T°F cylinder water inlet °F
T°F cylinder water outlet °F

LUBRICATOR OIL FLOW Adjustement :


Unit Cylinder 1 Cylinder 2 Cylinder 3 Cylinder 4 Cylinder 5 Cylinder 6
Suction cylinder Drop/min
Top of cylinder (1) Drop/min
Top of cylinder (2) Drop/min
Bottom of cylinder Drop/min
Gas packing (1) Drop/min
Gas packing (2) Drop/min
Other: Drop/min

Remark:

DR service representative : Customer approval:


Name: Name:
Sign Sign
Page :
DRESSER-RAND Maintenance check sheets for Recip compressor

Field Services Start-up records


End user : DR contract n° :
Recip type : DR services n° :
Serial number : Services dates from :\ to :
Original start up date : Hrs nb: DR field rep. :
Customer machine item: DR office support :

Valves location: A: Pump side C: Motor side


1: Outer Head end 2: Frame end

VALVE CONTROL Unit 05 Min 10 Min 30 Min 2 Hours 3 Hours 4 Hours


Cylinder # 1
1.A. Suction valve t°C °c
1.B. Suction valve t°F °F
1.C. Suction valve t°C °c
2.A. Suction valve t°C °c
2.B. Suction valve t°C °F
2.C. Suction valve t°C °c
1.A. Discharge valve t°C °c
1.B. Discharge valve t°F °F
1.C. Discharge valve t°C °c
2.A. Discharge valve t°C °c
2.B. Discharge valve t°F °F
2.C. Discharge valve t°C °c
Cylinder # 2
1.A. Suction valve t°C °c
1.B. Suction valve t°F °F
1.F. Suction valve t°F °F
2.A. Suction valve t°C °c
2.B. Suction valve t°F °F
2.F. Suction valve t°F °F
1.A. Discharge valve t°C °c
1.B. Discharge valve t°F °F
1.F. Discharge valve t°F °F
2.A. Discharge valve t°C °c
2.B. Discharge valve t°F °F
2.F. Discharge valve t°F °F
Cylinder # 3
1.A. Suction valve t°F °F
1.B. Suction valve t°F °F
1.C. Suction valve t°F °F
2.A. Suction valve t°F °F
2.B. Suction valve t°F °F
2.C. Suction valve t°F °F
1.A. Discharge valve t°F °F
1.B. Discharge valve t°F °F
1.C. Discharge valve t°F °F
2.A. Discharge valve t°F °F
2.B. Discharge valve t°F °F
2.C. Discharge valve t°F °F

Remark :

DR service representative : Customer approval:


Name: Name:
Sign Sign
Page :