0% found this document useful (0 votes)
105 views4 pages

P R. G B.E (ME) +BOE: Radeep Upta CH

Pradeep Gupta is seeking assignments in maintenance and operation with a reputable organization. He has over 20 years of experience in power plant operation and maintenance, including his current role as Associate Manager of Power Plant at Adani Wilmar Limited. He is proficient in MS Office applications and SAP PM. Gupta holds a B.E. in Mechanical Engineering and has worked in management roles overseeing the operation and maintenance of various power plants and their equipment.

Uploaded by

mkoelreal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
105 views4 pages

P R. G B.E (ME) +BOE: Radeep Upta CH

Pradeep Gupta is seeking assignments in maintenance and operation with a reputable organization. He has over 20 years of experience in power plant operation and maintenance, including his current role as Associate Manager of Power Plant at Adani Wilmar Limited. He is proficient in MS Office applications and SAP PM. Gupta holds a B.E. in Mechanical Engineering and has worked in management roles overseeing the operation and maintenance of various power plants and their equipment.

Uploaded by

mkoelreal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 4

PRADEEP R.

GUPTA
B.E(MECH)+BOE
[email protected]

ADDRESS:
Block No-B-75/9,
Samudra Township
Old port Road,
MUNDRA-370421,
Dist-kutch (Gujarat)
Contact: +917018061091
+917069025916

Purpose Statement: In quest of assignments in Maintenance & Operation


with an organization of repute

More than 20 years of experience in operation and maintenance, spares


management and inventory control.

Currently working with Adani Wilmar Limited as Associate Manager –Power


Plant. Experienced in maintenance and operation to increase thereliability of the
equipments and plants. Implementing schedules for breakdowns and planned
maintenance and operation of Power Plant. A keen planner to execute projects
with the best utilization of the given resources of cost, manpower and time.

Personal Details:
Date of Birth : July 1, 1976
Height and Weight : 174 cm and 68 kg
Marital Status : Married
Languages known : English, Hindi, Gujarati
Nationality : Indian
Sex : Male

Academic Qualification:
B.E. (Mechanical) from Govt. Engg College, North Gujarat University, securing first
class with distinction (66 %) in July 1998
B.O.E certificate, passed from Andhra pradesh in year 2014.
Passed Energy Manager examination in year 2017.
Computer Proficiency:
MS-Office packages like MS-Word, Excel, Power point and internet.
Working Knowledge of SAP PM Module

Professional Experience: I am working with 5 MW Captive thermal Power


Plant at Adani Wilmar Ltd. as Associate Manager- Power Plant since December
2018.
JOB PROFILE : Working as Associate Manager-Power Plant, looking after
operation & Maintenance of all utilities which include
1) 1*35 TPH (Thermax), AFBC, DCS operated, Coal, Pet coke fired boiler
2) 1*35 TPH (CVL), AFBC, DCS Operated, Coal, Pet coke fired boiler
3) 1*24 TPH (Thermax), AFBC, DCS Operated, Pet coke, Coal fired boiler
4) 1*24 TPH (CVL), AFBC, DCS Operated, Pet coke, Coal fired boiler
5) 1*16 TPH (CVL), AFBC, DCS Operated, Pet coke, Coal fired boiler
6) 1*5 MW (Siemens) extraction cum condensing turbine.
Past Experience:

1) Worked with Vardhman Textiles Ltd,Baddi, DIST-Solan (Himachal Pradesh) as


Manager- Boiler from March 2016 to 13 December 2018.

JOB PROFILE: Worked as Manager-Boiler, looking after operation & Maintenance


of all utilities which include
1) 1*40 TPH (IJT), AFBC, DCS operated, coal, pet coke,rice husk & bio mass
fired boilers
2) 1*20 TPH (Thermax), AFBC, DCS Operated, Pet coke, coal, rice husk & bio
mass fired boiler
3) 2*12 TPH (Thermax), AFBC, DCS Operated, Pet coke, coal, rice husk & bio
mass fired boiler
4) 2 * 25 LKcal (Thermax), rice husk fired, fluidised bed thermic heater
5) 2*15 LKcal (Thermax), Oil fired, modulation controlled thermic heater
6) 2*50 m3/hr capcity DM plant make-Ion exchange
7) Successfully commissioning of 40 TPH AFBC boiler

2) Worked with 29 MW Co-generation thermal Power Plant at Nahar


industries ,Village-Lalru ( Dist.-Mohali) from August 2014 to March 2016

JOB PROFILE: Worked as Manager-Power Plant, looking after operation &


Maintenance of 29 MW co-generation thermal power plant.
 2*55 TPH (IJT & CVL), AFBC, DCS operated, coal, pet coke & bio mass fired
2
boilers with 87 Kg/Cm working pressure.
 1*40 TPH (Thermax), Pet coke, coal, rice husk & bio mass fired boiler with
2
45 Kg/ Cm working pressure.
 2 *12 MW (Siemens), condensing, extraction & bleed turbines.
 1*5 MW (Siemens) condensing, extraction & bleed turbine
 Successfully converted & operated the AFBC boiler on pet coke

3) Worked with 67.1 MW Captive Power Plant at Binani Cement Ltd., Sirohi
from October 2010 to August 2014
Job Profile: Worked as a Dy. Manager, looking after Operation and
Maintenance of 67.1 MW Captive Power Plant.

 2 X 92 TPH Lignite/Coal fired 90 ata pressure and 510C temperature


cathers vessel ltd make CFBC boiler controlled through ABB DCS.
 1 X 92 TPH Lignite/Coal fired 85 ata pressure and 480C temperature
make AFBC boiler controlled through ABB DCS.
 1 x 22.5 MW extraction cum condensing Steam Turbine supplied by ABG
with WOODWARD-505 governing.
 2 x 22.3 MW extraction cum condensing Steam Turbine supplied by TOYO
DENKI POWER SYSTEM with WOODWARD-505 governing.
 Auxiliaries like BFP, Cooling Water System, PRDS, Deaerator, HP Heater, Air
compressor etc. controlled through DCS.

4) Worked with 36.5 MW Co-Generation Power Plant at Indian Rayon: A


Unit of Aditya Birla Nuvo Ltd Limited, Veraval (Aditya Birla Group) from
December 2007 to September 2010.
JOB PROFILE :Worked as a Asst. Manager, looking after Operation and
Maintenance of 36.5 MW Co-generation thermal power plants.
 1 X 105 TPH Lignite/Coal fired 90 ata pressure and 510C temperature
Thermax make IR-CFBC boiler controlled through HONEYWELL EXPERION
PKS DCS.
 2 X 50 TPH Lignite/Coal fired 90 ata pressure and 510C temperature IJT
make CFBC boiler controlled through. HONEYWELL EXPERION PKS DCS.
 1 x 16.5 MW extraction cum condensing Steam Turbine supplied by SKODA
with WOODWARD-505 governing.
 1 x 20.0 MW extraction cum condensing Steam Turbine supplied by TOYO
DENKI POWER SYSTEM with WOODWARD-505 governing.
 Auxiliaries like BFP, Cooling Water System, PRDS, Deaerator, HP Heater, Air
compressor etc. controlled through DCS.
 Dense phase pneumatic ash conveying system controlled through GE –
Fanuc PLC

5) Before that I was engaged in Operation & Maintenance of 40 MW, Power


Plant Department in Nirma Ltd., Bhavangar from Jan 2000 to Dec 2007
JOB PROFILE:- Governed the maintenance and other operations successfullyfor
the profitability of the company

 Excellent maintenance of: 4X100 TPH CFBC Boiler and Auxiliaries,


2X16.34 MW (Shin Nippon–TOYO Denki make) condensing & Extruding
type and 1X6.5 MW (BHEL make) Back-pressure type Steam Turbine and
its auxiliaries, Boiler Feed Pump, Dearator, Turbocharger, Various types of
pumps like as reciprocating, centrifugal, Gear type etc.
PRADEEP GUPTA

You might also like