JOINING LETTER
To
The Principal,
Dr. O. P. Bawane,
R V College of Architecture,
Bangalore - 560062.
Dear Sir,
We are writing to confirm that Ms. Vaishnavi S (USN 1RW17AT103) from R V College of
Architecture has started to intern at our firm for practical training as intern from
21-02-2022.
Sincerely,
Tahaer Zoyab,
Co-Founder, Architect
CA/2009/46793
Triple O Studio
R V COLLEGE OF ARCHITECTURE, BANGALORE - 560062
Student's Name - __________________Vaishnavi
USN -S_________________________________________
_____1RW17AT103___________________________________________
Months Weeks Work log Headings Day1 Day2 Day3 Day4 Day5 Day6 Day7 Architect's Remark(s) Architect's Sign+Seal
Date 21.02.2022 22.02.2022 23.02.2022 24.02.2022 25.02.2022 26.02.2022 27.02.2022
Avadi Residence,
Name of PROJECT Venkatesh Venkatesh Venkatesh
Introduction Avadi Residence Avadi Residence Residence Residence Residence
Designing Designing interiors, Interior Design, Interior Design,
Role
Concept, Drafting interiors, Drafting Drafting Drafting Drafting
Week 1 Review with Ar. Meeting with HOLIDAY
Converting concept Zoyab, Updating Review with Ar. lighting consultant,
sketch to CAD changes in plan, Zoyab for furniture prepare minutes of
Particular/ Details of work
drawing, Creating the layout, Discussion the meeting,
done
Introduction to the understanding furniture layout with Ar. Sarojini on continuing with Understanding False
studio and various on anthropometric s in for the drafted the interiors, starting ground floor Ceilings, Designing
going projects feet and in¢hes plan off with the drawings interior drawings the False Ceiling
Date 28.02.2022 01.03.2022 02.03.2022 03.03.2022 04.03.2022 05.03.2022 06.03.2022
Name of PROJECT Venkatesh Venkatesh Venkatesh
Venkatesh Residence Residence Residence Venkatesh Residence Residence
Interior Design, Interior Design, Interior Design, Interior Design, Interior Design,
Role
Drafting Drafting Drafting Drafting Drafting
Week 2
HOLIDAY
Particular/ Details of work
Month 2- 21st done Discussion with Ar.
Sarojini, updating Start designing interior Discussion follow up Discussion follow up Royapettah Heritage
March- 20th changes in the false details for living and with Ar. Sarojini and Detailing the furnitures with Ar. Sarojini and walk with Madras
April changes kitchen Ar. Vignesh for the ground floor Ar. Vignesh Inherited
Date 07.03.2022 08.03.2022 09.03.2022 10.03.2022 11.03.2022 12.03.2022 13.03.2022
Bus Route Roads,
Name of PROJECT Bus Route Roads, Venkatesh Venkatesh
Bus Route Roads Bus Route Roads Bus Route Roads Venkatesh Residence Residence Residence
Urban Design Urban Design Urban Design
Role Urban Design Urban Design Documentation, Documentation, Documentation, Interior Design,
Week 3 Documentation Documentation preparing report Interior Design Interior Design Drafting HOLIDAY
Discussion with Ar. Site visit to Ashok Site visit to Preparing
Vignesh, site visit to nagar 11th Avenue Balasubramanian
Particular/ Details of work documentation
SBI colony 4th street to
and Duraiswami Salai to document
done report, making Making revisions to
document the current Salai to document the current status of
the bus routes, revisions to the the interior Compilations and
status of the bus the current state of interior drawings drawings drawing corrections
compiling and
Date routes,14.03.2022
compiling and the bus routes,
15.03.2022 16.03.2022
organising the data 17.03.2022 18.03.2022 19.03.2022 20.03.2022
organising the data compiling and
Name of PROJECT organising the data
Sathiya's Residence Venkatesh Sathiya's Residence Sathiya's Residence
Venkatesh Residence (Aya Academy) Residence (Aya Academy) (Aya Academy)
Interior Design, Construction Construction Construction
Role
Week 4 Drafting drawings Site visit Drawings Drawings
Introductory SIte HOLIDAY HOLIDAY
Discussion with Ar. Foundation details- Foundation details-
Tahaer, AR. Vignesh, discussion to the measurements for Grade brick work, Grade brick work,
Particular/ Details of work
project with Ar. interior changes
done Ar. Sarojini and Backfilling and PCC, Backfilling and PCC,
Varshini to release the Tahaer, with Architects discussion with Ar. discussion with Ar.
final set of drawings understnding the 3d and Electrical Vignesh Vignesh
stimulation of the COnsultant and
structure Contractor
Firm's Name:
Principal Architect's Name:
Student's Signature: Sign and Seal: