100% found this document useful (1 vote)
329 views3 pages

Coaching 622 Day 2 Part 3

This document provides information about a proposed three-story residential house project in Baguio City, Philippines. It describes the client's lot details including its technical description and boundaries. It notes the site has a natural 8% slope and according to local rules, a retaining wall is required along the road frontage. The architect decided on a rectangular footprint with parking and retaining walls. The ground floor level was set based on the front retaining wall height, requiring earthworks to cut the sloping grade to the rear of the site.

Uploaded by

Joven Gallardo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
329 views3 pages

Coaching 622 Day 2 Part 3

This document provides information about a proposed three-story residential house project in Baguio City, Philippines. It describes the client's lot details including its technical description and boundaries. It notes the site has a natural 8% slope and according to local rules, a retaining wall is required along the road frontage. The architect decided on a rectangular footprint with parking and retaining walls. The ground floor level was set based on the front retaining wall height, requiring earthworks to cut the sloping grade to the rear of the site.

Uploaded by

Joven Gallardo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

ARCHITECTURAL DESIGN AND SITE PLANNING

WARNING: If there are conflicts between a stated word and the number/amount/figure
described, the stated/spelled word shall prevail. Should there be conflicts between two (2.0)
stated quantities, the higher figure shall prevail.

IMPORTANT NOTE: For this examination in this subject, the Examinee shall be allowed to
make full use open books) ONLY of Printed Rule VII and Rule VIII of the 2004 Revised
Implementing Rules and Regulations (IRR) of the Presidential Decree (P.D.) No. 1096,
otherwise known as the 1977 National Building Code of the Philippines (NBCP). The printed
copy shall be subject to inspection during the examination. This will be confiscated in the event
that any markings are found thereon.

A. PROJECT NO. 3 TITLE and General Description


A Proposed Three-Storey Residential House in Baguio

B. STATEMENT OF THE ARCHITECTURAL PLANNING and DESIGN PROBLEM


The single-family client has a lot property with the following information:

TCT No. : 004 – 2019015167


Page No.: 2

TECHNICAL DESCRIPTION (continued from page 1)


LRC REC. NO. 1037) , SITUATED IN THE BGY. LOURDES, GAWARAN
DIST. , BAGUIO CITY, C.A.R. BOUNDED ON THE W. , ALONG LINE 1 TO 2
BY LOT 4; ON THE N., ALONG LINE 2 TO 3 BY ROAD LOT 7; ON THE N.,
ALONG LINE 3 TO 4 BY ROAD LOT 7; ON THE E. , ALONG LINE 4 TO 5 BY
LOT 6; ON THE E., ALONG LINE 5 TO 6 BY LOT 6; ON THE S., ALONG LINE 6
TO 1 BY LOT 2, ALL OF BLK 1-A , ALL OF THE CONS. SUBD. PLAN.
BEGINNING AT A POINT MARKED “1” ON PLAN, BEING N. 52 DEG. 6169.56
M. FROM BLLM NO. 1, TUBA, BENGUET, THENCE N. 16 DEG. 04’ E. , 37.61
M. TO POINT “2” ; THENCE S. 54 DEG. 50’ E. , 12.60 M. TO POINT “3” ;
THENCE S. 89 DEG. 35’ E. , 14.20 M. TO POINT “4” ; THENCE S. 39 DEG. 41’
W. , 14.95 M. TO POINT “5” ; THENCE S. 03 DEG. 41’ E. , 25.10 M. TO POINT
“6” ; THENCE N 73 DEG. 56’ W. , 28.10 M. TO POINT OF BEGINNING; …

According to village rules and LGU ordinance, slope-up lot with lines abutting a road (RROW:
7.0 meters) shall be provided with retaining wall at the beginning of house footprint facing the
same road. The existing site has a natural grade from the sidewalk line that slopes up to the back
at 8% as per ocular inspection using POINT “2” as reference, and with POINT “2” marked at
elevation +60.21m, POINT “4” at +60.80m, and POINT “6” at +63.95m. A firewall shall be
built on one side along the property line POINT “1” to POINT ”2”.

By client’s concurrence, the architect decided that 4 vehicles shall be allotted for parking
adjacent with the firewall, and with width of 6.0 meters solely for vehicle entry. Thus a
rectangle footprint was likewise decided, with a depth of 23.50 meters. The retaining wall at the
house footprint was also determined to have a height of 1.20 meters from POINT “2”, and
therefore established as the Finished Floor Level for the Ground Floor.

Using the Finished Floor as reference level, the sloping natural grade shall be cut all the way to
the rear side of the rectangular footprint, whose perimeter wall shall eventually be retained for
structural integrity. Thus the rear wall and some parts of the side walls of the Ground Floor are
partially “submerged”, and so extra care is noted on waterproofing.
166. What is the TLA?
a) 750 sqm d) 975 sqm
b) 825 sqm e) 1,050 sqm
c) 900 sqm

167. What is the zoning classification?


a. R-1 d. Basic R-3
b. Basic R-2 e. Maximum R-3
c. Maximum R-2

168. What is the lot type?


a. End Lot d. Irregular Lot
b. Inside Lot e. Through Lot
c. Interior Lot

169. What type of dwelling is proposed by this project?


a. Duplex d. Single-Attached
b. Low-Rise Multilevel e. Townhouse
c. Single-Detached

170. What is the maximum length of firewall that can be built?


a. 6.0 meters d. 24.0 meters
b. 12.0 meters e. 30.0 meters
c. 18.0 meters

171. What is the effective area of the retaining wall that formed part of the footprint facing the
road?
a. 15.0 sqm d. 24.0 sqm
b. 18.0 sqm e. 27.0 sqm
c. 21.0 sqm

172. What is the footprint area?


a. 360 sqm d. 410 sqm
b. 380 sqm e. 420 sqm
c. 400 sqm

173. What is the Allowable Maximum TGFA?


a. 3 X 50% d. 3 X 75%
b. 3 X 60% e. 3 X 80%
c. 3 X 70%

174. What is the actual PSO?


a. 40% d. 55%
b. 45% e. 60%
c. 50%

175. What is the allowed ISA?


a. 10% d. 30%
b. 15% e. 40%
c. 20%
176. Where is the highest point of the lot located?
a. Pt. 1 d. Pt. 5
b. Pt. 2 e. Pt. 6
c. Pt. 4

177. If the observed slope was to be followed, what is the volume of earth that shall be cut for
the established Ground Floor Level?
a. 325 cu.m. d. 385 cu.m.
b. 340 cu.m. e. 415 cu.m.
c. 370 cu.m.

178. If a gravity water tank is to be installed at the site, where is its most desirable location?
a. At the north d. In the middle part of lot
b. At the south e. Near Pt. 1 of the lot boundary
c. Area abutting the road

179. What is the Building Height Limit?


a. 9.0 m d. 12.0 m
b. 10.0 m e. 15.0 m
c. 11.0 m

180. Where shall the established grade elevation start?


a. At PT. “2”
b. At PT. “3”
c. At the front side of the footprint
d. At the rear side of the footprint
e. At the sidewalk level

You might also like