RAB Rumah Type 60

This document provides a bill of items for a construction project called Padasuka Pelangi Residence located in Padasuka Atas Cimenyan. It includes 10 sections that detail the various construction works. Section I outlines site preparation works. Section II covers earthworks including excavation, filling, and soil removal. Section III includes structural works for the first and second floors such as foundations, columns, beams, floors, and roofs. Sections IV-VIII cover wall construction, flooring, ceilings, roofing, doors and windows. Sections IX-X outline plumbing installations for waste water and clean water systems. The total cost of materials and labor for all items is summarized across each section.

Uploaded by

Andrian Pratama
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
163 views3 pages

RAB Rumah Type 60

This document provides a bill of items for a construction project called Padasuka Pelangi Residence located in Padasuka Atas Cimenyan. It includes 10 sections that detail the various construction works. Section I outlines site preparation works. Section II covers earthworks including excavation, filling, and soil removal. Section III includes structural works for the first and second floors such as foundations, columns, beams, floors, and roofs. Sections IV-VIII cover wall construction, flooring, ceilings, roofing, doors and windows. Sections IX-X outline plumbing installations for waste water and clean water systems. The total cost of materials and labor for all items is summarized across each section.

Uploaded by

Andrian Pratama
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

BILL OF ITEM

Proyek : Padasuka Pelangi Residence


Lokasi : Padasuka Atas Cimenyan

Type 60
NO. ITEM PEKERJAAN SAT. VOLUME HAR-SAT JUMLAH

I. PEKERJAAN PERSIAPAN
1 Pemasangan Bouwplank m1 32,00 62.970,00 2.015.040,00
Sub Total I. 2.015.040,00

II. PEKERJAAN TANAH


1 Galian Tanah Pondasi & sloof m3 21,33 65.170,00 1.390.010,93
2 Urugan Pasir t = 10 cm di bawah lantai m3 4,61 185.130,00 853.958,41
3 Pemadatan Tanah m3 4,61 85.600,00 394.851,40
4 Urugan tanah Kembali m3 5,33 40.000,00 213.290,00
5 Buang tanah keluar lokasi m3 16,00 62.500,00 999.796,88
Sub Total II. 3.851.907,61

III. PEKERJAAN STRUKTUR


A Lantai 1
1 Pondasi batukali m3 21,33 696.940,00 14.865.033,26
2 Sloof 15/30
- Besi Beton kg 464,63 12.827,00 5.959.776,99
- Bekisting m2 30,10 251.870,00 7.582.036,31
- Beton k-225 m3 2,18 999.530,00 2.180.349,75
3 Kolom 15/15
- Besi Beton kg 326,24 12.827,00 4.184.694,36
- Bekisting m2 48,53 251.870,00 12.223.846,77
- Beton k-225 m3 1,02 999.530,00 1.016.971,80
4 Kolom 15/40
- Besi Beton kg 75,69 12.827,00 970.842,57
- Bekisting m2 6,98 251.870,00 1.759.199,11
- Beton k-225 m3 0,39 999.530,00 387.417,83
5 Balok 15/30
- Besi Beton kg 268,44 12.827,00 3.443.316,23
- Bekisting m2 24,49 251.870,00 6.168.469,46
- Beton k-225 m3 1,42 999.530,00 1.419.082,72
6 Balok 15/25
- Besi Beton kg 118,82 12.827,00 1.524.147,10
- Bekisting m2 9,77 251.870,00 2.461.564,86
- Beton k-225 m3 0,56 999.530,00 556.613,27
7 Plat Lantai t = 12 mm
- Besi Beton kg 246,39 12.827,00 3.160.462,00
- Bekisting m2 27,62 251.870,00 6.957.744,53
- Beton k-225 m3 2,48 999.530,00 2.474.136,61
8 Plat Tangga
- Besi Beton kg 18,30 12.827,00 234.771,15
- Bekisting m2 18,30 251.870,00 4.609.948,46
- Beton k-225 m3 1,64 999.530,00 1.639.272,93
9 Topi Beton T=10 cm
- Besi Beton kg 86,27 12.827,00 1.106.559,64
- Bekisting m2 9,36 251.870,00 2.357.503,20
- Beton k-225 m3 0,78 999.530,00 779.633,40

B Lantai 2
1 Kolom 15/15
- Besi Beton kg 354,38 12.827,00 4.545.603,42
- Bekisting m2 52,72 251.870,00 13.278.092,73
- Beton k-225 m3 1,11 999.530,00 1.104.680,56
2 Ring Balok 15/15
- Besi Beton kg 151,31 12.827,00 1.940.880,96
- Bekisting m2 10,94 251.870,00 2.754.198,45
- Beton k-225 m3 0,54 999.530,00 539.746,20
3 Plat Lantai t = 12 mm (Dudukan Torn)
- Besi Beton kg 77,04 12.827,00 988.242,87
- Bekisting m2 8,64 251.870,00 2.175.612,76
- Beton k-225 m3 0,77 999.530,00 773.636,22

Sub Total III. 118.124.088,49


IV. PEKERJAAN DINDING
1 Pas. Dinding Hebel 10x20x60 cm m2 117,82 146.160,00 17.220.995,06
2 Pas. Batu Alam Andesit 15x30 m2 4,40 276.730,00 1.216.228,35
3 Pek. Plesteran m2 235,65 56.690,00 13.358.760,40
4 Pek. Acian m2 235,65 33.210,00 7.825.797,02
5 Pekerjaan Waterproofing Aquaproof m2 3,15 166.520,00 524.538,00
6 Pengecatan dinding m3 235,65 20.590,00 4.851.947,02

Sub Total IV. 44.998.265,86


V. PEKERJAAN LANTAI
1 Pas. Keramik lantai 40x40 cm m2 34,53 215.000,00 7.422.875,00
2 Pas. Keramik Kamar Mandi 20x20 cm m2 3,80 212.240,00 807.042,60
3 Pas. Keramik Teras 30x30 cm m2 7,80 209.790,00 1.636.362,00
4 Pas. Lantai Rabat Beton T = 10 cm (Carport) m3 1,35 842.178,00 1.136.940,30

Sub Total V. 11.003.219,90


VI. PEKERJAAN PLAFOND
1 Pas. Plafond Gypsum 9 mm + Rangka Hollow m2 50,50 105.310,00 5.318.418,28
2 Pengecatan Plafond m2 50,50 20.590,00 1.039.846,48

Sub Total VI. 6.358.264,75


VII. PEKERJAAN ATAP
1 Rangka Atap Baja Ringan m2 45,72 206.401,80 9.436.690,30
2 Penutup Atap Genteng Beton m2 45,72 114.780,00 5.247.741,60
3 Nok genteng & nok samping m1 21,24 134.390,00 2.854.443,60
4 Talang gantung m1 12,00 32.169,86 386.038,36
5 Lisplank m1 21,24 57.580,00 1.222.999,20
6 Flashing Z/A 0,4mm ampig m1 21,24 134.390,00 2.854.443,60

Sub Total VII 22.002.356,65


VIII. PEKERJAAN PINTU DAN JENDELA
1 Pekerjaan Kusen Alumunium Pintu dan Jendela m1 45,55 125.000,00 5.693.750,00
2 Pas. Daun Pintu Jendela PJ unit 1,00 3.000.000,00 3.000.000,00
3 Pas. Daun Pintu P + ass unit 3,00 2.000.000,00 6.000.000,00
4 Pas. Daun Pintu P KM PVC unit 1,00 800.000,00 800.000,00
5 Pas. Daun Jendela J1 + ass unit 1,00 1.800.000,00 1.800.000,00
6 Pas. Daun Jendela J2 + ass unit 1,00 1.500.000,00 1.500.000,00
7 Pas. Daun Jendela J3 + ass unit 1,00 1.000.000,00 1.000.000,00
8 Pas. Daun Jendela J4 + ass unit 1,00 800.000,00 800.000,00
9 Pas. Daun Jendela J5 + ass unit 1,00 600.000,00 600.000,00

Sub Total VIII 21.193.750,00


IX. PEKERJAAN INSTALASI AIR KOTOR
1 Pas. Closet Duduk unit 1 1.867.090,00 1.867.090,00
2 Pas. Wastafel unit 1 - -
3 Pas. Jet Spry unit 1 108.480,00 108.480,00
4 Pas. Floor Drain 3" unit 1 73.590,00 73.590,00
5 Pas. Saluran air kotor 3" m1 13,8 100.880,00 1.392.144,00
6 Pas. Saluran air kotor 4" m1 14,65 136.680,00 2.002.362,00
7 Pas. Pipa air hujan 4" m1 29,7 136.680,00 4.059.396,00
8 Pas. Septictack unit 1 3.000.000,00 3.000.000,00

Sub Total IX 12.503.062,00


X. PEKERJAAN INSTALASI AIR BERSIH
1 Pemasangan Mesin Semi Jet Pump + Bor ls 1 - -
2 Torn Air 500 liter bh 1 1.300.000,00 1.300.000,00
3 Instalasi Air Bersih m1 20 29.350,00 587.000,00
4 Pemasangan Kran Air bh 1 108.480,00 108.480,00
5 Pemasangan Kran Air Leher Angsa bh 1 212.980,00 212.980,00
6 Pemasangan Meja dapur + Kitchen sink unit 1 3.000.000,00 3.000.000,00

Sub Total X 5.208.460,00


XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Titik Lampu bh 9 139.530,00 1.255.770,00
2 Pas. Titik Stop Kontak bh 6 139.530,00 837.180,00
3 Pas. Titik Saklar bh 7 123.380,00 863.660,00
3 Pas. Box Panel MCB unit 1 162.850,00 162.850,00
4 Pas. Saklar Tunggal ex. Broco bh 5 48.670,00 243.350,00
5 Pas. Saklar Doubel ex. Broco bh 2 48.670,00 97.340,00
6 Pas. Stop Kontak ex. Broco bh 6 48.670,00 292.020,00
7 Pas. Fitting Lampu bh 9 50.000,00 450.000,00

Sub Total XI 4.202.170,00


TOTAL 251.460.585,27