Obinna
Edison Obinna
Cementing Supervisor
+966 56 313 3418
+966 53 830 7334
+234 706 749 0366
PROFILE
An experienced professional with expertise in flawless project execution with respect to offshore and onshore well
cementation and acid stimulation operations. Very dedicated in understanding what the customer wants and working
diligently to achieving best result while giving Quality, Health, Safety and Environmental preservatory best practice a high
priority. A Team Player, who believed that following processes and procedures is a way we should operate in other to
achieve the company’s vision and objectives. I align myself with company’s core values and Vision in achieving the desired
results, also in accordance with Company’s goal of exceeding her Client expectations, satisfaction and establish client
relationship. Repeatedly, I received commendation for exceptional operational roles based on demonstrated success in
taking calculated risks, executing Operations strategy, improving client confidence in the job execution.
EMPLOYMENT HISTORY
Cementing Specialist (Staff), BakerHughes Incorporated, Saudi Arabia
April 2021 – Present
▪ Ensure the Cementing Equipment and other auxiliary Cementing equipment are checked/ checklisted prior
to mobilization to client site.
▪ Ensure the Cementing Equipment and other auxiliary equipment are certified and on date prior to mobilization.
▪ Mixing and pumping of the cement job on the fly whether on auto or manual mode.
▪ Ensure all the crew members are fit to work and have their valid certificates.
▪ Attend meeting with our client rep on site.
▪ Checklist the Cementing Equipment and other auxiliary cementing equipment prior to cement job.
▪ Ensure all the required and proper Equipment and Chemicals are mobilized to the field
▪ Review the Cementing Calculation with the customer rep to ensure it is error free or repeat the calculation if
the well condition changed.
▪ Make sure the Cementing operation data is recorded.
▪ Give Site report o daily bases and communicate with the Base Coordinator
▪ Collect samples from the chemical stuck and send to base for lab testing prior to cementing operation.
Cementing Supervisor (Consultant), Multi-Chase Energy Limited, Port Harcourt
March 2021 – April 2021
▪ Ensure the Cementing Equipment and other auxiliary Cementing equipment are checked/ checklisted prior
to mobilization to client site.
▪ Ensure the Cementing Equipment and other auxiliary equipment are certified and on date prior to mobilization.
▪ Mixing and pumping of the cement job on the fly whether on auto or manual mode.
▪ Ensure all the crew members are fit to work and have their valid certificates.
▪ Attend meeting with our client rep on site.
▪ Checklist the Cementing Equipment and other auxiliary cementing equipment prior to cement job.
▪ Ensure all the required and proper Equipment and Chemicals are mobilized to the field
▪ Review the Cementing Calculation with the customer rep to ensure it is error free or repeat the calculation if
the well condition changed.
▪ Make sure the Cementing operation data is recorded.
▪ Give Site report o daily bases and communicate with the Base Coordinator
▪ Collect samples from the chemical stuck and send to base for lab testing prior to cementing operation.
Cementing Supervisor (Consultant), Geoplex Drillteq Limited
February 2021 – April 2021
▪ Ensure the Cementing Equipment and other auxiliary Cementing equipment are checked/ checklisted prior
to mobilization to client site.
▪ Ensure the Cementing Equipment and other auxiliary equipment are certified and on date prior to mobilization.
▪ Mixing and pumping of the cement job on the fly whether on auto or manual mode.
▪ Ensure all the crew members are fit to work and have their valid certificates.
▪ Attend meeting with our client rep on site.
▪ Checklist the Cementing Equipment and other auxiliary cementing equipment prior to cement job.
▪ Ensure all the required and proper Equipment and Chemicals are mobilized to the field
▪ Review the Cementing Calculation with the customer rep to ensure it is error free or repeat the calculation if
the well condition changed.
▪ Make sure the Cementing operation data is recorded.
1
▪ Give Site report o daily bases and communicate with the Base Coordinator
▪ Collect samples from the chemical stuck and send to base for lab testing prior to cementing operation.
2
Obinna
Cementing Supervisor, Quadcan Well Energy Limited, Port Harcourt
August 2020 – Present
▪ Ensure the Cementing Equipment and other auxiliary Cementing equipment are checked/ checklisted prior
to mobilization to client site.
▪ Ensure the Cementing Equipment and other auxiliary equipment are certified and on date prior to mobilization.
▪ Mixing and pumping of the cement job on the fly whether on auto or manual mode.
▪ Ensure all the crew members are fit to work and have their valid certificates.
▪ Attend meeting with our client rep on site.
▪ Checklist the Cementing Equipment and other auxiliary cementing equipment prior to cement job.
▪ Ensure all the required and proper Equipment and Chemicals are mobilized to the field
▪ Review the Cementing Calculation with the customer rep to ensure it is error free or repeat the calculation if
the well condition changed.
▪ Make sure the Cementing operation data is recorded.
▪ Give Site report o daily bases and communicate with the Base Coordinator
▪ Collect samples from the chemical stuck and send to base for lab testing prior to cementing operation.
Cementing Specialist (Staff), BakerHughes Incorporated, Port Harcourt
February 2020 – April 2020
▪ Ensure the Cementing Equipment and other auxiliary Cementing equipment are checked/ checklisted prior
to mobilization to client site.
▪ Ensure the Cementing Equipment and other auxiliary equipment are certified and on date prior to mobilization.
▪ Mixing and pumping of the cement job on the fly whether on auto or manual mode.
▪ Ensure all the crew members are fit to work and have their valid certificates.
▪ Attend meeting with our client rep on site.
▪ Checklist the Cementing Equipment and other auxiliary cementing equipment prior to cement job.
▪ Ensure all the required and proper Equipment and Chemicals are mobilized to the field
▪ Review the Cementing Calculation with the customer rep to ensure it is error free or repeat the calculation if
the well condition changed.
▪ Make sure the Cementing operation data is recorded.
▪ Give Site report o daily bases and communicate with the Base Coordinator
▪ Collect samples from the chemical stuck and send to base for lab testing prior to cementing operation.
Cementing Specialist (Contract), BakerHughes Incorporated, Port Harcourt
February 2014 – January 2019
▪ Ensure the Cementing Equipment and other auxiliary Cementing equipment are checked/ checklisted prior
to mobilization to client site.
▪ Ensure the Cementing Equipment and other auxiliary equipment are certified and on date prior to mobilization.
▪ Mixing and pumping of the cement job on the fly whether on auto or manual mode.
▪ Ensure all the crew members are fit to work and have their valid certificates.
▪ Attend meeting with our client rep on site.
▪ Checklist the Cementing Equipment and other auxiliary cementing equipment prior to cement job.
▪ Ensure all the required and proper Equipment and Chemicals are mobilized to the field
▪ Review the Cementing Calculation with the customer rep to ensure it is error free or repeat the calculation if
the well condition changed.
▪ Make sure the Cementing operation data is recorded.
▪ Give Site report o daily bases and communicate with the Base Coordinator
▪ Collect samples from the chemical stuck and send to base for lab testing prior to cementing operation.
Assistant Cementer, BakerHughes Incorporated, Port Harcourt
April 2013 – January 2014
▪ Work under the supervision of a Supervisor to ensure proper unit maintenance on the base or at the rig site.
▪ Perform equipment checklist before equipment is mobilized to location.
▪ Work with the Supervisor during the cement unit rig-up on location
▪ Participate during cementing mix water preparation.
▪ Bulking of cement from silo to the surge can during cementing operation.
▪ Operating and maintenance of the cementing operation auxiliary equipment such as C-Pump,
Compressor, Manifold etc.
▪ Re-kit of plug valve whenever the need arises.
▪ Maintenance and/or Packing of the high-pressure pump and centrifugal pump after each cement job.
▪ Cleaning of the cement unit and other auxiliary unit while on location and at the cement base.
▪ Operating the single skid pumps during well acid stimulation operation.
▪ Perform pressure testing of BOP, Choke Manifold and Standpipe using cementing unit.
▪ Servicing, Checklist and Using the cementing batch mixer to mix cement during cementing operation
3
Obinna
EDUCATION
▪ Mechanical Engineering, Federal University of Technology,
Owerri. Imo State, Nigeria.
February 2007 – October 2011.
Second Class Upper Division.
Bachelor’s degree.
Automotive Engineering Option.
▪ Mechanical Engineering, Institute of Management and Technology
Enugu. Enugu State, Nigeria.
July 2004 – September 2006.
Upper Credit.
National Diploma.
INSTRUCTOR LED TRAININGS
▪ Field Specialist Cementing Academy, BHGE Western Hemisphere Educational
Center Tomball, USA.
February 2020 – March 2020.
▪ Seahawk Operation Training, BHGE Western Hemisphere Educational Center Tomball, USA.
April 2019 – May 2019.
▪ BOSIET, Tolmann.
September 2017 – September 2021.
COMPUTER BASED TRAINING (PRE-ACADEMY TRAINING)
● Primary Cementing and Calculation
● Liner Cementing and Calculation
● Squeeze Cementing and Calculation
● Plug Back Cementing and Calculation
● Bulk Cement Storage and Handling
● Cementing Mixing and Pumping Equipment
● Cementing through Coil tubing and calculations
● Cementing Chemicals and SDS
● Oil Field Safety Courses
● Electronics Engineering Handbook
INTERNSHIPS
Industrial Training, Process and Pipeline Services, BJ Services. Port Harcourt.
River State, Nigeria.
March 2005 – November
2006. One-year Industrial
Training.
WORK EXECUTED
Field Supervisor - Quadcan Oil Well Limited – Port Harcourt, River State
▪ 7” Casing Cementing
Job Oben 51
(Truck Mounted Jereh Cement mixing unit)
Field Supervisor – Geoplex Drillteq Limited – Port Harcourt, River State
▪ Maintenance of Seahawk Equipment at the base
(Cementing Equipment – Seahawk)
4
Obinna
Field Supervisor - Quadcan Oil Well Limited – Port Harcourt, River State
▪ 7” Casing Cementing
Job AGU 4
(Truck Mounted Jereh Cement mixing unit)
▪ 7” Casing Cementing
Job EYIE 7
(Truck Mounted Jereh Cement mixing unit)
Field Specialist - BakerHughes, a GE Company – Port Harcourt, River State
▪ OES INTEGRITY/AGIP - 133/8” Casing job, 95/8” Casing job, 7” Liner job at Ogboinbiri,
Bayelsa State Swamp Nigeria.
(Cementing Equipment – Seahawk)
▪ COSL SEEKER\ADDAX - 20” Casing job, 133/8” Casing job at Cameroon offshore.
(Cementing Equipment – Seahawk)
▪ EXXONMOBIL\BORR DRILLING - 13 3/8” Casing Job, 9 5/8” Casing Job, 7” Liner Job at
Usari 27, Akwa-Ibom offshore, Nigeria.
(Cementing Equipment – Seahawk)
Assistant Cementer - BakerHughes, a GE Company – Port Harcourt, River State
▪ OES INTEGRITY/AGIP - 133/8” Casing job, 95/8” Casing job, 7” Liner job at Oleh Delta
State Nigeria.
(Cementing Equipment – RAM Unit)
▪ COSL SEEKER\ADDAX 20” Casing job, 133/8” Casing job at Cameroon offshore.
(Cementing Equipment – Seahawk)
▪ EXXONMOBIL\BORR DRILLING 7” Liner Job at Usari Field Akwa Ibom offshore, Nigeria.
(Cementing Equipment – Seahawk)
▪ SNEPCO\DS-10 - 20” Casing job, 133/8” Casing job, 95/8” Casing job, 7” Liner job
(Cementing Equipment – Dual Mixing System)
▪ Primary cementing job with STERLING GLOBAL (20” Casing job, 133/8” Casing job, 95/8”
Casing job, 7” Liner job) (Cementing Equipment – Tucano)
▪ Primary cementing job with Niger Delta Petroleum Recourses (20” Casing job, 133/8”
Casing job, 95/8” Casing job, 7” Liner job, Cementing through coiled tubing)
(Cementing Equipment – RAM Unit)
▪ Primary cementing job with CONOIL Nigeria (20” Casing job, 133/8” Casing job, 95/8”
Casing job, 7” Liner job) (Cementing Equipment – RAM Unit)
▪ Stimulation job with EXXON Mobile Nigeria at Unam C (Pumping of Acid)
▪ Primary Cementing job with EURAFIC (20” Casing job, 133/8” Casing job, 95/8” Casing job,
7” Liner job) (Cementing Equipment – RAM Unit)
▪ Primary cementing job with Orient Oil Nigeria
(Cementing Equipment – RAM Unit)
▪ Stimulation job with MIDWESTERN PETROLEUM
(Cementing Equipment – RAM Unit)
▪ ODENL/SNEPCO DS10 20” and 133/8” Casing job (Drill Ship)
(Cementing Equipment – Seahawk Dual Mixing System)
▪ Energia Stimulation Pumping job
PERSONAL DATA
Date of Birth: 16 April 1985.
Gender: Male
State of Origin: Enugu State
Country: Nigeria
Marital Status: Married
COMPUTER EXPERIENCE
▪ Engineering Handbook
▪ Job Master
▪ PumpQualityIndex
▪ Microsoft Excel, PowerPoint
INTERESTS AND ACTIVITIE
Researching on the net, Reading, Swimming, playing football, chess and traveling,
TIPS
Fast learner, dedicated and hardworking, easily acclimatizes to challenging work condition.