Project Execution Plan Template

This Project Execution Plan document outlines how a construction project will be delivered. It includes sections on the project description and scope of works. It also describes the project team roles and responsibilities for delivering commercial management, construction management, project controls, and quality management. An appendix lists additional relevant documents. The purpose is to communicate the delivery approach and management structure for executing the project according to statutory and client requirements.

Uploaded by

JRE Lettings
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
257 views5 pages

Project Execution Plan Template

This Project Execution Plan document outlines how a construction project will be delivered. It includes sections on the project description and scope of works. It also describes the project team roles and responsibilities for delivering commercial management, construction management, project controls, and quality management. An appendix lists additional relevant documents. The purpose is to communicate the delivery approach and management structure for executing the project according to statutory and client requirements.

Uploaded by

JRE Lettings
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

Revision Author Checked by Approved by Date Reason for

approved revision

Project Execution Plan


Contents
I. Introduction..................................................................................................2
Purpose............................................................................................................................ 2
The Works Summary.......................................................................................................2
Abbreviations and Definitions...........................................................................................2
II. The Works.....................................................................................................2
Project Description........................................................................................................... 2
Project Scope................................................................................................................... 2
III. Delivery.........................................................................................................3
Project Team.................................................................................................................... 3
Commercial Management................................................................................................3
Construction Management...............................................................................................3
Project Controls...............................................................................................................3
Quality Management........................................................................................................3

IV. Appendix.......................................................................................................4
Introduction
Purpose
Write about the purpose of the Project Execution Plan document and what it is going to deliver to the reader.

The Works Summary


Enter a brief description of the main works being carried out and what the completed scheme will provide.

Abbreviations and Definitions


Include here any abbreviations referred to in the document and their definitions - see example below.

Term Definition
PEP Project Execution Plan

The Works
Project Description
Describe the works and provide insight into the existing site and surrounding areas etc.

Project Scope
Define the scope of works and list out the key subcontract categories which are covered within the works (i.e.
piling, groundworks, steel frame etc.).

PROJECT EXECUTION PLAN - [SELECT DATE] 2


Delivery
In this section, write about the project team, processes, and structure on how the project is going to be delivered

Project Team
Provide a organogram of the project team and identify the key stakeholders and their roles and responsibilities.

Commercial Management
Describe the activities and responsibilities of commercial management and how this is structured for the project.
Include items like procurement, payment, change management (variations), performance management, and asset
management for purchased plant etc.

Construction Management
Describe the activities and responsibilities of construction management and how this is structured for this project.
Include items like health and safety, programme, logistics, information management, security, CDM, site set up,
and mobilization/demobilsation etc.

Project Controls
What controls are in place to help manage the project? For example, risk, planning, cost/estimating, change
management etc.

Quality Management
How will quality be managed on the project? Describe systems and process which will help control quality in
accordance with statutory and employer’s requirements. For example, auditing, benchmarking, mock-ups,
reporting etc.

PROJECT EXECUTION PLAN - [SELECT DATE] 3


Appendix
List and append relevant documents here i.e. logistics plan, programme, organogram, workflows, payment cycle,
tracker documents etc.

PROJECT EXECUTION PLAN - [SELECT DATE] 4