ACTIVITY : DATE :
INSPECTION LEVEL
METHOD OF
NO. ACTIVITY DESCRIPTION ACCEPTANCE CRITERIA VERIFYING DOCUMENT TIME INSPECTION/ FREQUENCY
INSPECTION Owner Contractor Consultant
B Implementation Work
1 Install pipe Visual Daily
MS-ME-MECH-003, CAI-DWG-ME-DD-FF
3 Install the accessories Visual QC-ME-INS-009 Daily M W SW
Visual, CAI-DWG-ME-DD-FF-P1-2001
4 Install pump Daily
Measurement
5 Cleaning material after working Visual Place should be clean from residual material - Daily SW SW SW
C TESTING
SW : Spot Witness Spot Witness, This activity may perform during perform during construction where interim measurements, and/or witness of activity normally take place, prior to final measurement or inspection being done
NAME : NAME :
SIGN : SIGN :
DATE: DATE:
FMR-QCL-09/R1
ECT SYMBOL
REMARK
0A
007-ITP-ME-2022
Inspection & Test Plan of Fire Sprinkler Installation CHECKED Sheet: Of:
Project No. : MD - 2408 DATE PREPARED APPROVED BY
QC
Project : Cainiao Smart Logistic Warehouse 5/25/2022 Site QC Project Manager
Manager
Responsbility*
No Item Description/Inspection Activity & Test Plan Method of Inspection Acceptance Criteria / Reference Verifying Document Time Inspection / Frequency Remarks
Murinda BNBV CN
Fire Sprinkler Installation
A Prepare Material
1 Alarm check valve c/w alarm gong and retard chamber Review, Visual CAI-DWG-ME-DD-FF-GE-7001, The Brand, Size,
2 Flow switch Review, Visual Dimension, kind of others material accordance to
3 Sprinkler Head Review, Visual material Approved
4 Foam and Sponge Rubber Visual CAI-TS-PL-01
QC-ME-GEN-002 Per as execution M W SW
5 Pipes Visual
6 Fittings & Flanges buttweld Visual CAI-DWG-ME-DD-FF-GE-7001, The Brand, Size,
Dimension, kind of others material accordance to
7 Fitting threaded Visual material Approved
8 Mechanical Groove Joint Visual
B Implementation Work
1 Install pipe Visual Daily
MS-ME-MECH-003, CAI-DWG-ME-DD-FF
3 Install the accessories Visual QC-ME-INS-009 Daily M W SW
4 Install pump Visual, Measurement CAI-DWG-ME-DD-FF-P1-2001 Daily
5 Cleaning material after working Visual Place should be clean from residual material - Daily SW SW SW
C TESTING
Review, Visual, Pressure test on Fire Hydrant pipe is 1.5 x 11.5 bar =
1 Pressure Test QC-ME-TST-002 Per as execution SW W W
Measurement 17,25 bar = 18 bar
* Legend :
Subject : Fire Sprinkler Installation (Using BS, GI Pipe) Project No. MD2408
Location :
Reference Drawing :
RESULT
No. ITEM TO CHECKED REMARKS
YES NO
A Installation
1 Head Sprinkler type pendant
2 Head Sprinkler type up right
3 Head Sprinkler type Wall Mounted
4 MCV
5 BCV
6 PRV
7 Inspection Valve
8 Draining system
9 Support/ Hanger
10 Piping and connection
11 Piping Accessories & Labeling
12 Placement & Reach of each sprinkler according to design
13 The color of the bulb on the sprinkler is according to specifications
Notes :
NAME
SIGNATURE
DATE
Attached : Date:
QC-ME-TST-002
CAINIAO SMART LOGISTIC WAREHOUSE
PROJECT Doc.No. : Page: 00 of 00
Location :
Ref. Drawing :
Start Finish
Installation : Installation :
Location : Location :
Date : Date :
Duration : Duration :
Time : WIB Time : WIB
Pressure : Bars Pressure : Bars
Weather : Weather :
Media test : Media test :
Note: Note:
Comments Conclusions:
Approved
Approved w/ comments
Not approved
Commented & Resubmitted