SECURITY CHECK GATE 3
TOILET
OPEN AREA WAITING LOUNGE
172.7
20.1 CONCESSIONS
SECOND FLOOR
375.6
187.6 187.6
14.7 35.8 3.5 2.0 60.0 15.0
16.7 16.7 33.6
11.0 TOILET 6.4 8.5 MEDICAL 2.0 AIRLINE OFFICES 10.0
8.2 TOILET CLINIC
CHECK IN COUNTERS
CONCESSIONS
BAGGAGE ADMINISTRATION/
5.0 99.7
53.1 74.8 CLAIM AREA 1.5 1.55.0 OPERATION 84.7
OFFICES 49.8
57.8 60.0
FOREIGN 23.3
10.0 EXCHANGE 33.4
10.0 SERVICE CONCIERGE 14.9 14.9 SECURITY CHECK GATE 1
60.0
50.0 30.0 38.6 1.0
15.0 2.5
10.0 3.0 2.0
5.0 5.0
65.2 7.3
GROUND FLOOR
A LINEAR TERMINAL GROUND AND SECOND FLOOR PLAN
1 SCALE 1:100 MTS
PROJECT TITLE : SUBMITTED BY: SUBMITTED TO: SHEET CONTENT: SHEET NO.
TECHNOLOGICAL INSTITUTE NIEMO, JOHN KEAN G. ENGR. JENNIFER CAMINO
OF THE PHILIPPINES DESIGN OF A CLASS 1 LINEAR TERMINAL
QUEZON CITY
PRINCIPAL AIRPORT IN
PAR, CHARMAINE ANNE D.
PASCUAL, MARICAR B. COURSE CODE & SECTION
FIRST A
AND SECOND FLOOR
938 AURORA BLVD.
CUBAO, QUEZON CITY CORON, PALAWAN SABANDO, KENNETHCHARL L. CE020 - CE42S5 PLAN 1
SAPAD, JOSEPH CARLOS D. CE DESIGN PROJECTS 2