Inspection & Test Plan For Storage Tanks Work: ITP NO.:-9560/SITE/QAC/022/ITP-13
Inspection & Test Plan For Storage Tanks Work: ITP NO.:-9560/SITE/QAC/022/ITP-13
Carbon Steel WC W --
4 WPS/PQR WC
b) Testing WC
Sheet 1 of 6
INSPECTION & TEST PLAN FOR STORAGE TANKS WORK
ITP NO. :- 9560/SITE/QAC/022/ITP-13
Inspection by Inspection by NBEL
Sl no. Activity Formats No. Remarks
Subcontractor CAT A CAT B
b) Certification & approval of welders WC HP HP 9560/NBEL/FORM/MECH/04,REV.0/ 9560/NBEL/FORM/MECH/05
SHELL
Sheet 2 of 6
INSPECTION & TEST PLAN FOR STORAGE TANKS WORK
ITP NO. :- 9560/SITE/QAC/022/ITP-13
Inspection by Inspection by NBEL
Sl no. Activity Formats No. Remarks
Subcontractor CAT A CAT B
Shell course alignments and fit-up of vertical and
1 WC W S 9560/NBEL/FORM/MECH/54,REV.0
circumferential joints before welding
a) Check Shell diameter, circularity,perpendicularity,
2 WC W S 9560/NBEL/FORM/MECH/67,REV.0
straight edge before welding.
Sheet 3 of 6
INSPECTION & TEST PLAN FOR STORAGE TANKS WORK
ITP NO. :- 9560/SITE/QAC/022/ITP-13
Inspection by Inspection by NBEL
Sl no. Activity Formats No. Remarks
Subcontractor CAT A CAT B
FIXED ROOF
Blast cleaning and painting Roof Structure,underside
WC W S 9560/NBEL/FORM/MECH/07,REV.0
1 of Roof plates
2 Location and Welding of Roof supports WC S -- 9560/NBEL/FORM/MECH/59,REV.0
FLOATING ROOF
Sheet 4 of 6
INSPECTION & TEST PLAN FOR STORAGE TANKS WORK
ITP NO. :- 9560/SITE/QAC/022/ITP-13
Inspection by Inspection by NBEL
Sl no. Activity Formats No. Remarks
Subcontractor CAT A CAT B
6 Location of sleeve supports WC S -- As per Approved drawing
9 Initial – lift WC S --
15 Seal fixing WC HP --
C TESTING
Correctness of testing arrangements especially size of
WC S -- 9560/NBEL/SITE/QAC/025, REV.0
1 blind flanges/vents/drains/ temporary piping
5 Hammer test WC W W
Sheet 5 of 6
INSPECTION & TEST PLAN FOR STORAGE TANKS WORK
ITP NO. :- 9560/SITE/QAC/022/ITP-13
Inspection by Inspection by NBEL
Sl no. Activity Formats No. Remarks
Subcontractor CAT A CAT B
D NSPECTION & TEST DOCUMENTS
Legends: WC-100% Examination by Subcontractor, RW-Review of Subcontractor's Documents, W-Witness - Activity shall be Wtnessed 100% and accepted by NBEL,HP-
Hold Point, S-Surveillance Inspection by NBEL,
CAT A- All Site fabricated steel storage tanks for process fluid /Hydrocarbon, floating roof, tanks having capacity 600 cum or 10 m dia and 8 m height.
CAT B- Site fabricated steel storage tanks for Raw water, Fire water, waste water, DM water, etc. and all tanks not covered under “CAT A”
SIGNATURE
NAME