Air N2 Receiver Size Estimation
Air N2 Receiver Size Estimation
List
Item No Service
ID [ft]
TL-TL [ft]
Vol. [ft3]L/D [-] ID [ft]
TL-TL [ft]
Vol. [ft3]L/D [-]
[A] 41-MBL-105 Utility Air Receiver 10.0 24.0 2147 2.4 10.0 24.0 2147 2.4
[B] 41-MBL-107A Instrument Air Receiver 10.0 24.0 2147 2.4 10.0 24.0 2147 2.4
[C] 41-MBL-107B Instrument Air Receiver 9.0 24.0 1718 2.7 10.0 24.0 2147 2.4
[D] 41-MBL-111 Nitrogen Receiver 9.0 24.0 1718 2.7 9.0 24.0 1718 2.7
NG OK
UA N2
IA normal normal normal
demand demand demand
Case [B]&[C] [A] [D]
[Nm3/min] 23.3 7.9 0.9 4.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Qv
[scfm] 870 295 32.9 178
[MPag] 0.77 0.62 0.83 0.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
P1
[psig] 111 90 120 95.7
[MPag] 0.62 0.45 0.69 0.45 0.00 0.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
P2
[psig] 90 65 100 65 10
t [min] 3.2 11.2 81 18.4
[degC] 46.1 46.1 46.1 46.1 -17.8 -17.8 -17.8 -17.8 -17.8 -17.8 -17.8 -17.8 -17.8 -17.8 -17.8 -17.8
T
[degF] 115 115 115 115
[m3] 60.8 60.8 60.8 48.7 ### 0.0 ### ### ### ### ### ### ### ### ### ###
Vv
[ft3] 2147 2147 2147 1720 ### 0 ### ### ### ### ### ### ### ### ### ###
L/D [-] 2.4 2.4 2.4 2.67
ID [ft] 10.0 10.0 10.0 9.0 ### 0.0 ### ### ### ### ### ### ### ### ### ###
TL-TL [ft] 24.0 24.0 24.0 24.0 ### 0.0 ### ### ### ### ### ### ### ### ### ###
Fuel Gas
Title : Utility Air, Instrument Air, and Nitrogen Demand Calculation
Objectives : To determine utility air, instrument air, and nitrogen demand in Alur Siwah CPP
Consumption Summary
Nitrogen Consumption
Condensate Tank 8.8 271.3 Consider maximum pump-out
during loading to truck
based on highest
condensate tank.
Produced Water Tank 34.8 44.4 Consider maximum pump-out
during initial production
case
SRU 60.0 0.0
Amine Pure Tank 0.0 105.8
Amine Make Up Tank 0.0 211.7
EG Surge Drum 12.5 0.0
605351029.xls
2
EG Make Up Tank 0.0 39.6
Amine Sump Tank 0.0 39.6
EG Sump Tank 0.0 12.5
Nitrogen for Refrigerant Make-up/Presurization 0.0 10.0
Analyzers Purging 0.0 10.0
Allowance for Seal Gas for future Compressors 40.0 0.0
Total Nitrogen Demand 156.0 744.8
605351029.xls
3
Air Compressor, Air Drier and N2 Generation Capacity Calculation
Design Demand
Instrument Air 783 scfm 1259 Nm3/hr
Utility Air 65 scfm 105 Nm3/hr
Nitrogen 420 scfm 676 Nm3/hr
Ratio of dry air inlet to N2 produc 3
Required Air Suply for Nitrogen Gen 1261 scfm 2027 Nm3/hr
Total Air Required 2109 scfm
Air Dryer Regeneration 20%
Total Air Required including Regene 2530 scfm 4068 Nm3/hr
Compressor Design:
No. of Air Compressor 2 online, 1 spare
Selected Normal Capacity each C 1265 scfm, dry basis 2034 Nm3/hr
Drier Design :
No. of Air Drier 1 online, 1 spare
Normal Net Product Capacity eac 2109 scfm, dry basis 3390 Nm3/hr
N2 Generation Package Design :
No. of N2 Generation 2 online, with 50% capacities
Selected Normal Capacity each N 210 scfm 338 Nm3/hr
Normal Consumption
605351029.xls
4
psig kgf/cm2g
140 9.8
135 9.5
130 9.1
125 8.8
120 8.4
115 8.1
110 7.7
105 7.4
100 7.0
95 6.7
90 6.3
85 6.0
80 5.6
75 5.3
70 4.9
65 4.6
60 4.2
55 3.9
50 3.5
45 3.2
40 2.8
35 2.5