Page 1 of 1
Customer – SHELF DRILLING Equipment
Maintenance Check List Sr. No. -
Rig Name -TRIDENT XI
SCREW CONVEYOR (SHAKER
Location -MUMBAI OFFSHORE Date - 30/07/2017
AUGER)
Action PASS FAIL Comments
Screw is under gauge.-Need to change
Check condition of screw, trough, covers, and guards. Ensure
1
all bolts and nuts are installed and secure Ok
Clean the Screw Conveyor externally , open all covers, wash
2
and scrape the unit to remove unwanted solids build-up Ok
Check overall condition of trough, check for weld cracks and
3
structural defects Ok
4 Check all hanger retaining bolts are tight and secure
Ok
5 visually check the hanger is properly aligned and it's not
Ok
bent or twisted
6 Visually check there is no sign of damage or overheating of
Ok
the bearing retainer
7 Check bearing cover bolts are tight and secure
Ok
Replaced with new one ( varitor
8 Check for leaks at the varitor and gearbox / reducer Ok and gearbox assembly ) Part no-
00A32C010.117
Check the variator and gearbox / reducer oil levels, refill if Ok
9
necessary (Follow procedure)
10 Check the condition and tension of belts
N/A
Clean, inspect, and function test all micro-switches and
11
contacts (if applicable) Ok
12 Inspect drive coupling for loose fit and alignment
Ok
Check bolt torque of motor mounting to plate and skid, and
13
connecting trough flanges and guards Ok
Ensure Screw Conveyor tags are in place. Clean and protect
14
them with thin coat of grease N/A
Ensure electrical component tags on motors and control
15 panel(s) are in place. Clean and protect them with thin coat
Ok
of grease
Check electrical grounding is complete on skid and skid to
16
rig structure Ok
17 Check external condition of all electrical boxes for damage
Ok
18 Inspect and clean the air inlet of the electrical motor fans
Ok
Ensure grease fittings are clean and undamaged and grease
19 Drive Bearing (drive element): Add 2 shots of grease (use
Ok
ERG GREASE EP2 or equivalent)
If work is completed with this STEM, securely install/close all
20 covers, panels, boxes, and guards with all appropriate
fasteners. Otherwise, continue with next STEM Ok
NOTE- The equipment needs to carry out a trail run at least twice in a month. This will minimize the
stuck up of pumps and auger.
__________________ ________________________ ___________
Sanguine Oilfield Representative Shelf Drilling OIM / Supervisor Date
Rev.06-2017