0% found this document useful (0 votes)
17 views1 page

Assessment 04

The document contains questions about project management priorities, building and managing a team, applying the scientific method to problem solving, and deciding on a project management methodology early in the project.

Uploaded by

Joel Manacmul
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
17 views1 page

Assessment 04

The document contains questions about project management priorities, building and managing a team, applying the scientific method to problem solving, and deciding on a project management methodology early in the project.

Uploaded by

Joel Manacmul
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

ASSESSMENT 04

Q&A + Research Activity


Answer what is asked in the following items. Each answer should be in a narrative form with at
least 3 sentences and with normal formatting details.
1. If you are the project manager, which side of the triple constraint should be given the
highest priority? Explain what makes it seem impossible or difficult to balance the project
management triple constraint perfectly.
2. In what ways can a project manager build his/her team members and help them practice
effective time management?
3. Why should engineers follow the scientific method in problem-solving conducting
studies? Why can‘t they apply hypothesis testing in designing engineering projects?
4. Explain why it is crucial for a project manager to decide as early as the start of the
project period on what methodology should be applied in managing the activities in each
process group of project management.