1ST SLAB SIZE 9"X21" 9"X24" COLUMN SPLICE DETAIL SIDE FACE REINFORCEMENT 12 # @ 200 C/C ON BOTH FACES.
16- LAP LENGTH FOR COLUMN -40 XD for M25 FE 500
LAP LENGTH FOR BEAMS/SLAB -50 XD for M25 FE 500
TO STEEL 8 NOS TOR 16 10 NOS TOR 16 17- DESIGN OF CENTRING, SHUTTERING, AND
Ld= DEVELOPMENT LENGTH CONCRETE MIX IS CONTRACTOR RESPONSIBLITY
2ND SLAB 18- SBC OF SOIL IS CONSIDERED 30T/SQMT
TIES 8TOR@8"C/C 8TOR@8"C/C BAR DIA TENSION COMPRESSION 19. DUE CARE SHALL BE TAKEN TO ASCERTAIN THAT REQUISITE
5'-0"
3- SAFETY OF ANY ARCHITECTURAL PROJECTION
L d+10 d b PROVIDED WHICH IS NOT GIVEN IN THIS DRAWING
15"
10TOR@6"C/C 15" SHUTTERING AND CENTERING WORK
15"
Ld= DEVELOPMENT LENGTH Ld= DEVELOPMENT LENGTH CRACKS IN WALLS
IN TENSION CRACKS DUE TO SHRINKAGE OF CONCRETE
IN TENSION
d b= BAR DIAMETER
d b= BAR DIAMETER
10TOR @ 6"C/C
ANCHORAGE OF BEAM BARS
LAP, SPLICE IN BEAM IN AN EXTERNAL JOINT PCC 1:4:8 4"THK
ARCHITECT / ENGINEER
MR.VIJAY KALYANSHETTY
LIFT FOUNDATION DETAILS PROJECT: PROPOSED CONSTRUCTION OF RESI. APPT.BUILDING
FOR MR. ANGADI @
DRAWING TITLE
FOUNDATION DETAILS
DRN. : VARSHA CHD. : VINAY
8TOR@8"C/C
DRG. NO. : 21171/2R0 DATE : 11-05- 2021
8TOR@8"C/C 8TOR@8"C/C 8TOR@8"C/C
8TOR@8"C/C 8TOR@8"C/C
REVISION SIGN
COLUMN TIES FOR 8 BARS COLUMN TIES FOR 10 BARS COLUMN TIES FOR 12 BARS SR.NO. VINAY BEHERE M.E.
DESCRIPTION DATE