ETAP
Project: Load Flow 1 Page: 1
12.6.0H
Location: Laboratorium SDK Date: 13-10-2022
Contract: 03041181924018 SN:
Engineer: Muhammad At-Thoriq Annaj Revision: Base
Study Case: LF
Filename: Load Flow 1 Config.: Normal
Electrical Transient Analyzer Program
Load Flow Analysis
Loading Category (1): Design
Generation Category (1): Design
Load Diversity Factor: None
Swing V-Control Load Total
Number of Buses: 1 0 3 4
XFMR2 XFMR3 Reactor Line/Cable Impedance Tie PD Total
Number of Branches: 2 0 0 1 0 0 3
Method of Solution: Adaptive Newton-Raphson Method
Maximum No. of Iteration: 99
Precision of Solution: 0.0001000
System Frequency: 50.00 Hz
Unit System: Metric
Project Filename: Load Flow 1
Output Filename: C:\ETAP 1260\Load Flow 1\Load Flow 1.lfr
ETAP
Project: Load Flow 1 Page: 2
12.6.0H
Location: Laboratorium SDK Date: 13-10-2022
Contract: 03041181924018 SN:
Engineer: Muhammad At-Thoriq Annaj Revision: Base
Study Case: LF
Filename: Load Flow 1 Config.: Normal
Adjustments
Apply Individual
Tolerance Adjustments /Global Percent
Transformer Impedance: Yes Individual
Reactor Impedance: Yes Individual
Overload Heater Resistance: No
Transmission Line Length: No
Cable Length: No
Apply Individual
Temperature Correction Adjustments /Global Degree C
Transmission Line Resistance: Yes Individual
Cable Resistance: Yes Individual
ETAP
Project: Load Flow 1 Page: 3
12.6.0H
Location: Laboratorium SDK Date: 13-10-2022
Contract: 03041181924018 SN:
Engineer: Muhammad At-Thoriq Annaj Revision: Base
Study Case: LF
Filename: Load Flow 1 Config.: Normal
Bus Input Data
Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic
ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar
Bus3 30.000 1 100.0 0.0
Bus4 80.000 1 100.0 0.0
Bus6 80.000 1 100.0 0.0
Bus7 30.000 1 100.0 0.0 39.225 15.013
Total Number of Buses: 4 0.000 0.000 39.225 15.013 0.000 0.000 0.000 0.000
Generation Bus Voltage Generation Mvar Limits
ID kV Type Sub-sys % Mag. Angle MW Mvar % PF Max Min
Bus3 30.000 Swing 1 100.0 0.0
0.000 0.000
ETAP
Project: Load Flow 1 Page: 4
12.6.0H
Location: Laboratorium SDK Date: 13-10-2022
Contract: 03041181924018 SN:
Engineer: Muhammad At-Thoriq Annaj Revision: Base
Study Case: LF
Filename: Load Flow 1 Config.: Normal
Line/Cable Input Data
Ohms or Siemens/1000 m per Conductor (Cable) or per Phase (Line)
Line/Cable Length
ID Library Size Adj. (m) % Tol. #/Phase T (°C) R X Y
Line1 20000.0 0.0 1 75 0.100000 0.200000
Line / Cable resistances are listed at the specified temperatures.
ETAP
Project: Load Flow 1 Page: 5
12.6.0H
Location: Laboratorium SDK Date: 13-10-2022
Contract: 03041181924018 SN:
Engineer: Muhammad At-Thoriq Annaj Revision: Base
Study Case: LF
Filename: Load Flow 1 Config.: Normal
2-Winding Transformer Input Data
Transformer Rating Z Variation % Tap Setting Adjusted Phase Shift
ID Phase MVA Prim. kV Sec. kV % Z1 X1/R1 + 5% - 5% % Tol. Prim. Sec. %Z Type Angle
T1 3-Phase 85.000 30.000 80.000 4.00 1.50 0 0 0 0 0 4.0000 YNd 0.000
T2 3-Phase 85.000 80.000 30.000 4.00 1.50 0 0 0 0 2.500 4.0000 Dyn 0.000
ETAP
Project: Load Flow 1 Page: 6
12.6.0H
Location: Laboratorium SDK Date: 13-10-2022
Contract: 03041181924018 SN:
Engineer: Muhammad At-Thoriq Annaj Revision: Base
Study Case: LF
Filename: Load Flow 1 Config.: Normal
Branch Connections
CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base
ID Type From Bus To Bus R X Z Y
T1 2W XFMR Bus3 Bus4 2.61 3.92 4.71
T2 2W XFMR Bus6 Bus7 2.68 4.01 4.82
Line1 Line Bus4 Bus6 3.13 6.25 6.99
ETAP
Project: Load Flow 1 Page: 7
12.6.0H
Location: Laboratorium SDK Date: 13-10-2022
Contract: 03041181924018 SN:
Engineer: Muhammad At-Thoriq Annaj Revision: Base
Study Case: LF
Filename: Load Flow 1 Config.: Normal
LOAD FLOW REPORT
Bus Voltage Generation Load Load Flow XFMR
ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap
* Bus3 30.000 100.000 0.0 38.300 16.555 0 0 Bus4 38.300 16.555 803.0 91.8
Bus4 80.000 98.358 -0.6 0 0 0 0 Bus6 37.846 15.873 301.1 92.2
Bus3 -37.846 -15.873 301.1 92.2
Bus6 80.000 96.166 -1.8 0 0 0 0 Bus4 -37.302 -14.785 301.1 93.0
Bus7 37.302 14.785 301.1 93.0
Bus7 30.000 96.922 -2.4 0 0 36.847 14.103 Bus6 -36.847 -14.103 783.4 93.4 2.500
* Indicates a voltage regulated bus (voltage controlled or swing type machine connected to it)
# Indicates a bus with a load mismatch of more than 0.1 MVA
ETAP
Project: Load Flow 1 Page: 8
12.6.0H
Location: Laboratorium SDK Date: 13-10-2022
Contract: 03041181924018 SN:
Engineer: Muhammad At-Thoriq Annaj Revision: Base
Study Case: LF
Filename: Load Flow 1 Config.: Normal
Bus Loading Summary Report
Directly Connected Load Total Bus Load
Bus Constant kVA Constant Z Constant I Generic
Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading
Bus3 30.000 0 0 0 0 0 0 0 0 41.725 91.8 803.0
Bus4 80.000 0 0 0 0 0 0 0 0 41.040 92.2 301.1
Bus6 80.000 0 0 0 0 0 0 0 0 40.125 93.0 301.1
Bus7 30.000 0 0 36.847 14.103 0 0 0 0 39.454 93.4 783.4
* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).
# Indicates operating load of a bus exceeds the bus marginal limit ( 95.0% of the Continuous Ampere rating).
ETAP
Project: Load Flow 1 Page: 9
12.6.0H
Location: Laboratorium SDK Date: 13-10-2022
Contract: 03041181924018 SN:
Engineer: Muhammad At-Thoriq Annaj Revision: Base
Study Case: LF
Filename: Load Flow 1 Config.: Normal
Branch Loading Summary Report
Transformer
CKT / Branch Cable & Reactor
Ampacity Loading Capability Loading (input) Loading (output)
ID Type (Amp) Amp % (MVA) MVA % MVA %
T1 Transformer 100.000 41.725 41.7 41.040 41.0
T2 Transformer 85.000 40.125 47.2 39.454 46.4
* Indicates a branch with operating load exceeding the branch capability.
ETAP
Project: Load Flow 1 Page: 10
12.6.0H
Location: Laboratorium SDK Date: 13-10-2022
Contract: 03041181924018 SN:
Engineer: Muhammad At-Thoriq Annaj Revision: Base
Study Case: LF
Filename: Load Flow 1 Config.: Normal
Branch Losses Summary Report
Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag
T1 38.300 16.555 -37.846 -15.873 454.5 681.7 100.0 98.4 1.64
Line1 37.846 15.873 -37.302 -14.785 544.0 1088.1 98.4 96.2 2.19
T2 37.302 14.785 -36.847 -14.103 454.5 681.7 96.2 96.9 0.76
1452.9 2451.4
ETAP
Project: Load Flow 1 Page: 11
12.6.0H
Location: Laboratorium SDK Date: 13-10-2022
Contract: 03041181924018 SN:
Engineer: Muhammad At-Thoriq Annaj Revision: Base
Study Case: LF
Filename: Load Flow 1 Config.: Normal
Alert Summary Report
% Alert Settings
Critical Marginal
Loading
Bus 100.0 95.0
Cable 100.0 95.0
Reactor 100.0 95.0
Line 100.0 95.0
Transformer 100.0 95.0
Panel 100.0 95.0
Protective Device 100.0 95.0
Generator 100.0 95.0
Inverter/Charger 100.0 95.0
Bus Voltage
OverVoltage 105.0 102.0
UnderVoltage 95.0 98.0
Generator Excitation
OverExcited (Q Max.) 100.0 95.0
UnderExcited (Q Min.) 100.0
Marginal Report
Device ID Type Condition Rating/Limit Unit Operating % Operating Phase Type
Bus6 Bus Under Voltage 80,00 kV 76,93 96.2 3-Phase
Bus7 Bus Under Voltage 30,00 kV 29,08 96.9 3-Phase
ETAP
Project: Load Flow 1 Page: 12
12.6.0H
Location: Laboratorium SDK Date: 13-10-2022
Contract: 03041181924018 SN:
Engineer: Muhammad At-Thoriq Annaj Revision: Base
Study Case: LF
Filename: Load Flow 1 Config.: Normal
SUMMARY OF TOTAL GENERATION , LOADING & DEMAND
MW Mvar MVA % PF
Source (Swing Buses): 38.300 16.555 41.725 91.79 Lagging
Source (Non-Swing Buses): 0.000 0.000 0.000
Total Demand: 38.300 16.555 41.725 91.79 Lagging
Total Motor Load: 0.000 0.000 0.000
Total Static Load: 36.847 14.103 39.454 93.39 Lagging
Total Constant I Load: 0.000 0.000 0.000
Total Generic Load: 0.000 0.000 0.000
Apparent Losses: 1.453 2.451
System Mismatch: 0.000 0.000
Number of Iterations: 2