0% found this document useful (0 votes)
147 views5 pages

Ahmad Kamal's Resume: Data & Cybersecurity

This biodata provides information about Ahmad Kamal bin Hassan including his qualifications, experience, and projects. He has a Master's degree in Process Plant Management from Universiti Teknologi Malaysia and a Bachelor's degree in Chemical Engineering from Universiti Malaysia Pahang. He has 12 years of experience in data analysis, system engineering, and process automation roles. His experience includes projects for PETRONAS, Honeywell Engineering, and various oil and gas refineries.

Uploaded by

Apexs Group
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
147 views5 pages

Ahmad Kamal's Resume: Data & Cybersecurity

This biodata provides information about Ahmad Kamal bin Hassan including his qualifications, experience, and projects. He has a Master's degree in Process Plant Management from Universiti Teknologi Malaysia and a Bachelor's degree in Chemical Engineering from Universiti Malaysia Pahang. He has 12 years of experience in data analysis, system engineering, and process automation roles. His experience includes projects for PETRONAS, Honeywell Engineering, and various oil and gas refineries.

Uploaded by

Apexs Group
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Biodata

Name AHMAD KAMAL BIN HASSAN


Designation Senior Data / System Engineer

Qualification
UNIVERSITI TEKNOLOGI MALAYSIA
Course MASTER OF SCIENCE: PROCESS PLANT MANAGEMENT
Result PASS
Status COMPLETED 2014

UNIVERSITI MALAYSIA PAHANG


Course BACHELOR OF ENGINEERING: CHEMICAL ENGINEERING
Result PASS
Status COMPLETED 2009

Experience

12 years of total working experience

August 2021 – Present SIGMA INFO ANALYTICS DATA SDN BHD | PETRONAS UPSTREAM
Position Level Data Analyst – PETRONAS UDQ
Work Status Contract - Manpower Supply to PETRONAS Digital Team

Job Description:
Involved in engineering and configuration of Upstream Data Quality (UDQ) dashboard for Petronas
Upstream. This project analysed data quality of Petronas Upstream Assets (Malaysia and
International) using six data quality dimensions (completeness, validity, consistency, uniqueness,
timeliness, and accuracy), and being visualized into UDQ dashboard using MS Power BI.

• Involved in proof-of-concept (POC) activity in assessing flow and assurance of data from
various sources using SQL queries.
• Analysed performance of previous ETL (Extract, Transform, Load) process, and
designed improvement on the ETL architecture by introducing MS Power BI dataflow.
• Led a back-end team which routinely performed maintenance and sustainability check on
the MS Power BI Service, Desktop and Mobile Apps.
• Standardised and migrated 3000+ MS Power BI DAX measures for the UDQ dashboard
across 7 Corporate Datastore (CDS).
• Integrated dashboard development from various focal disciplines in the project such as
business rules (BR) implementation, back-end development, and front-end development.
• Performed User Acceptance Test (UAT) with client on published dashboard and
amended the punchlist.
• Involved in data remediation (DR) processes, which main objective is to improve the

RESUME AHMAD KAMAL BIN HASSAN Page 1 of 5


quality score of the UDQ Dashboard. Facilitated DR process with various stakeholders in
a workshop.
• Created an automate action item system using Power Automate to track and send
reminder email to stakeholders of the agreed data remediation action items.
• Involved in discussions and pilot test of integration of UDQ Dashboard with Petronas’
SEMPURNA.
• Trained newly joined staff, worked well with other colleagues, and mainly involved in
client liaison.

Skillsets: MS Power BI, MS Excel VBA, Power Automate, MS SQL

Projects: PETRONAS Upstream Data Quality / UDQ Dashboard

Mar 2021 – May 2021 HONEYWELL ENGINEERING SDN BHD


Position Level Senior Network Engineer
Work Status Full time

Job Description:
Involved in Real Time Operational Technology (RTOT) Project as part of Petronas Cyber Security
Strategy Deployment Program (CSSDP) for Malaysian Refining Company Sdn Bhd (MRCSB).

• Managed and integrated 142 Operational Technology (OT) end nodes (physical servers
and Virtual Machines (VMs)) from Malaysian Refining Company Sdn Bhd (MRCSB) to
Bangi Data Center (BDC) RDMZ.
• Validated and configured McAfee ePO Anti-Virus (AV) exclusions for all OT end nodes
based on functionality and applications installed.
• Configured Windows Event Forwarding (WEF) for all OT end nodes to Syslog Server
(Windows Event Collector (WEC)).
• Managed Windows Server Update Services (WSUS) for all OT end nodes to WSUS
Server based on application type and version.
• On board all OT end nodes to Security Information and Event Management (SIEM)
environment.

Skillsets: McAfee ePO Anti-Virus (AV), MS Windows Event Forwarding (WEF), Windows Server
Update Services (WSUS), Experion Backup and Restore (EBR)

Projects: MRCSB - Real-Time-OT (RTOT) Cyber Security Project

Oct 2015 – Mar 2021 HONEYWELL ENGINEERING SDN BHD


Position Level Senior Application Engineer
Work Status Full time

Job Description:
Implemented Uniformance Process History Database (PHD) suite (R340 and R400), Uniformance
Insight (UI), Honeywell Blending and Movement Automation (BMA) suite (R410 and R430) and
LIMS Viewer and for Oil & Gas refineries

• Involved in data acquisition, validation, and verification.


• Connect data from 4000+ equipment (tanks, blenders, pumps, valves, meters etc) and
50000+ historian tags.
• Maintained MS SQL databases for the data acquired from the equipment.
• Maintained SQL Queries for Data and Reporting request.
• Consulted with clients to determine user needs and design solutions.
• Data Integration: Interfaced the system to external systems via OPC (PHD system to PI
system, BMA system to LIMS).
• Oversaw software system installation and collaborated on implementation of new
updates or features, monitor software performances, troubleshot errors, recommended

RESUME AHMAD KAMAL BIN HASSAN Page 2 of 5


changes, and implemented software fixes to improve applications functionality.
• Familiarized with Honeywell BMA suite - (Inventory Monitor (IM), Movement Automation
(MA), Experion Ratio Controller (ERC), Open Blend Property Control (OpenBPC)), LIMS
Viewer), Honeywell Uniformance PHD and Honeywell UI.
• Involved in scope identification, technical clarifications, engineering, Factory Acceptance
Test (FAT), Site Acceptance Test (SAT) and commissioning activities.
• Involved in BMA packages (IM-MA-ERC-Open BPC) system implementations and
maintenance training to site Operators and Engineers.
• Produced site-specific application software Operation and Maintenance Manual and As
Built documentations.
• Maintained scope, schedules and met objectives for simultaneous projects which valued
approximately RM500k per year.

Skillsets: Honeywell Uniformance Suite, Honeywell Blending and Movement Automation (BMA)
suite, MS SQL

Projects:
PHD
• WR Grace - DCS & PHD Hardware and Software Refresh
• MRCSB - PSR-2 DCS Upgrade & HPU-2 Technical Refresh Project
BMA
• MRCSB - BMM Post Delima ULSD Jumper Line Project
• MRCSB - BMM P73213AB Segregation Jumper Line
• MRCSB - BMM Bitumen Jumper Line Project
• Petron Malaysia Refining & Marketing Bhd – PETRON Marine Import Facilities 2
• MRCSB - BMM Diesel Jumper Line to Fuel Oil Tanks (MFO Productions) Project
• MRCSB - BMM Diesel Jumper Line Project
• MRCSB - BMM Naphtha Jumper Line to NHT-1 Project
• MRCSB - BMM T77201 Jumper Line Alternate Sourcing During T77201 Shutdown
Project
• MRCSB - BMM T7554 Strip Out Project
• MRCSB - BMM Slop Task Modifications for T7305
• MRCSB – Engineering, Procurement, Construction and Commissioning (EPCC) for
Diesel Euro 5 (DELIMA) Project
• MRCSB – BMM MPP Sparing Pump Installation Project
• MRCSB – BMM ULG95 Jumper Line to TTLR
• MRCSB – Engineering, Procurement, Construction and Commissioning (EPCC) for
Malaysian Crude Oil (MCO) Project
• MRCSB – BMM Diesel Euro 5 Jumper Line Project
• Bihn Son Refining & Petrochemical Cp., Ltd – BMA Migration Project
• Petron Malaysia Refining & Marketing Bhd – PETRON DCS & BMA Life Cycle
Management Program
• MRCSB – Integrated B2S and OMS DCS Rejuvenation Project

Apr 2012 – Sep 2015 FOXBORO (M) SDN BHD


Position Level Project Engineer (DCS)
Work Status Full time

Job Description:
Acted as a key person in developing a greenfield Distributed Control System (DCS) database for
Laila Field (LADR-A), owned by Sarawak Shell Berhad (SSB).

• Configured database for DCS from I/O list documents using Foxboro I/A Series DCS
hardware and software.
• Involved in data review and data validation - Process Functional Design Specification
(PFDS) document.
• Review and validate DCS graphics from Piping and Instrumentation (P&ID) Diagram.

RESUME AHMAD KAMAL BIN HASSAN Page 3 of 5


• Review and validate functional logic from Control Narrative and Cause and Effect Matrix
(CEM) documents.
• Tested and troubleshot DCS functional between Foxboro I/A Series, Foxboro Control
Software (FCS), FoxView and FoxDraw software.
• Involved in communication test between DCS and various PLCs using serial link, TCP/IP
through Modbus protocol.
• Involved in SSB Alarm Management workshop and implementation into DCS.
• Involved and supported Factory Acceptance Test (FAT), Site Acceptance Test (SAT),
field hook-up activities, control panel installation, wiring supervision, loop checking and
network troubleshooting.
• Involved in client/consultants/vendors liaison.
• Involved in giving internal and external DCS training.
• Involved in Laila greenfield platform commissioning activity, which achieved its
commercial first gas in December 2014.

Skillsets: Foxboro DCS System (I/A Series)

Projects:
• Sarawak Shell Berhad (SSB) – Distributed Control System (DCS) at Laila Field and Tie-
in at Betty and Baronia
• Petronas Carigali Sdn Bhd (PCSB), Distributed Control System (DCS) at Marlin MLNG
• Talisman Malaysia Limited (TML), Distributed Control System (DCS) at KNDP-A

Nov 2011 – Apr 2012 SCIENTIGE SDN BHD


Position Level Project Engineer (Safety)
Work Status Full time

Job Description:
Developed Safety Operating Limit, Critical Operating Parameter, Never Exceed Limit
(SOLCOPNEL) database for all PETRONAS platforms in Sarawak Operation (SKO) region as part
of Process Safety Information (PSI) of Process Safety Management (PSM) programme.

• Involved in data acquisition, validation, and verification.


• Maintained SQL Queries for Data and Reporting request.
• Involved in Piping & Instrumentation Diagram (P&ID) and General Arrangement (GA)
data review, and alarms value gathering.
• Linked the alarms with interlock system using Cause and Effect Matrix (CEM).

Skillsets: Database management, P&ID, CEM, Alarm Management

Projects:
• Petronas Carigali Sdn Bhd (PCSB), Sarawak Operation (SKO) – Process Safety
Management (PSM) Project

Dec 2009 – Oct 2011 SCIENSIM SDN BHD


Position Level Project Engineer (Process)
Work Status Full time

Job Description:
Developed and maintain OTS data for MTBE Malaysia Sdn. Bhd., covering 3 plants namely MTBE,
PDH and PP plant.

• Involved in data acquisition, validation, and verification.


• Reviewed Heat & Material Balance data and developed steady state basis and
constructed dynamic model using SIMPACK software.
• Involved in the scoping and Functional Design Specification (FDS) document
development.

RESUME AHMAD KAMAL BIN HASSAN Page 4 of 5


• Prepared flowsheets based on Process Flow Diagram (PFD) and marked-up Piping &
Instrumentation Diagram (P&ID).
• Familiarized with Boiler Management System (BMS) logic. Developed logic for valve
sequence (ladder logic), and other equipment (auto start pumps, expanders,
compressors, fans, blowers, and heaters) using MS Developer Studio.
• Prepared and mapped model database during graphics integration activity into
ProSimulator software.
• Troubleshot communications between model software (SIMPACK), integrator software
(ProSimulator) and graphic software (GLG Toolkit Graphics Builder).
• Tested and reviewed the models with clients for Factory Acceptance Test (FAT).
• Developed malfunctions program for the models which include valve, instrument and
equipment failures.
• Reviewed start up and shut down procedures of plant units and produced a Program
Manual document for OTS purposes.

Skillsets: SIMPACK, MS Developer Studio, ProSimulator

Projects:
• MTBE Malaysia Sdn Bhd (MMSB) – Operator Training Simulator (OTS) Project.

RESUME AHMAD KAMAL BIN HASSAN Page 5 of 5

You might also like