Shop Drawing Check List (WATER SUPPLY)

This document is a checklist for reviewing plumbing drawings. It contains 18 items to check, including verifying that the latest architectural, structural, and mechanical drawings are used; layout and piping details are shown correctly; equipment schedules match what is shown; isolation valves and flow directions are indicated properly; and references and revisions are clear. The checklist is to be filled out by the drafter, engineer, and quality control engineer to ensure plumbing drawings are accurate and coordinated with other building systems.

Uploaded by

Satya N.G
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2K views1 page

Shop Drawing Check List (WATER SUPPLY)

This document is a checklist for reviewing plumbing drawings. It contains 18 items to check, including verifying that the latest architectural, structural, and mechanical drawings are used; layout and piping details are shown correctly; equipment schedules match what is shown; isolation valves and flow directions are indicated properly; and references and revisions are clear. The checklist is to be filled out by the drafter, engineer, and quality control engineer to ensure plumbing drawings are accurate and coordinated with other building systems.

Uploaded by

Satya N.G
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

CHECKERS BRIEF

SHOP DRG CHECK LIST - PLUMBING


Project Title : Department: Date:

Checker’s Name : Drawing: Revision:

S.NO DESCRIPTION REV YES NO NA DRG NO/REMARK


1 BASE DRG / DOCUMENT USED
1.1 Latest Issued For Construction(IFC) layout

1.2 Latest Artictectural used.

1.3 Latest Structural used.

1.4 Latest ID drg used

1.5 Latest RCP drg used

1.6 Latest Plumbing schematic used

1.7 Coordinated with latest kitchen drawings

1.8 Coordinated with latest swimming pool drawings

2 LAYOUT/DETAILS
Plumbing equipments shown on layout are mentioned in equipment
2.1 schedule with proper type,size and capacity as per MS/DS
Check whether all piping are placed out side electrical rooms, telephone
2.2
rooms and LV rooms
2.3 Isolating valves are accessable for operation

2.4 Hand Faucet connection shown right side in EWC facing away

2.5 Hot water connect left side washbasin , sink , shower and bidet
Pipe level marked on the drg .Note to be added to clear the reference
2.6 point(From FFl or SSL)

2.7 Individual kitchen & toilet - isolation valves

2.8 Flow direction line arrow

2.9 Enlarged details provided for the Toilets if required

2.10 Layout co-ordinated with other MEP services

2.11 Suitable sections are provided to clear the services

2.12 Schedule for all the components in the drg

2.13 Hot water heater provided with suitable access for maintenance.

2.14 Legend provided for items used in the drg.

2.15 Written text clearly readable & not written over lines

2.16 Reference drgs are mentioned in the drg.


If the sections are shown in other sheet, reference drg no shown in the section
2.17 mark

2.18 If drg is revised, revisions are clouded with Rev No.

Additional Items

Draughtsman Engineer QAQC Engineer