0% found this document useful (0 votes)
21 views

Form Hiradc

This document summarizes the results of an occupational health and safety (OHS) risk assessment. It identifies potential hazards, risks, and existing controls for various activities at a worksite. Three activities are listed - jaw crusher operation, blasting, and land opening. Key hazards identified include noise, dust exposure, heat stress, equipment rollovers, and injuries from moving parts. Controls currently in place aim to reduce risks through practices like using protective equipment, maintaining safe distances, enforcing work-rest cycles, and ensuring equipment is in good condition. Some risks remain at a medium level. Additional controls are recommended to further lower certain risks.

Uploaded by

Sweetapem
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
21 views

Form Hiradc

This document summarizes the results of an occupational health and safety (OHS) risk assessment. It identifies potential hazards, risks, and existing controls for various activities at a worksite. Three activities are listed - jaw crusher operation, blasting, and land opening. Key hazards identified include noise, dust exposure, heat stress, equipment rollovers, and injuries from moving parts. Controls currently in place aim to reduce risks through practices like using protective equipment, maintaining safe distances, enforcing work-rest cycles, and ensuring equipment is in good condition. Some risks remain at a medium level. Additional controls are recommended to further lower certain risks.

Uploaded by

Sweetapem
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

OHS Risk Assessment

T: Total Score Low [1 - 3] Medium [4 - 6] High [8 - 12] Extreme [15 - 25] RA Date: RA Ver. No.:
Evaluation Criteria: 1: Condition Assessed : 2: Control / Influence Status 3: Legal Status
[ LP: Likelihood - Probability / SV: Severity ] [ PC: Past Condition / NR: Normal / AB: Abnormal / EM: Emergency / NP: New Planned Activity ] [C/I] [ N: No; Y: Regulated ]

Inherent Risk [Before Control] Current Controls and/or Current Risk [After Control] Additional Controls and/or
No Activity Hazards Risk 1 2 4 Applicable Regulation
LP SV T Recommended Practice LP SV T Recommended Practice

1.0 Aktifitas Utama


1 Jaw Crusher Kebisingan yang Gangguan Pendengaran 3 3 9 Menggunakan Ear Plug 2 2 4 Y
dihasilkan oleh mesin
Tangan Terjepit Cacat pada tangan 2 4 8 Tidak Kontak Langsung Dengan 1 2 2
Material

Tertimpa Material Luka Berat Hingga fatality 1 5 5 Menjaga Jarak Dengan Tumpukan 1 2 2
Material
2 Blasting Kebisingan yang Gangguan Pendengaran 3 3 9 Menggunakan Ear Plug 2 2 4
ditimbulkan oleh mesin

Debu proses blasting Gangguan Saluran 3 3 9 Sosialisasi pentingnya penggunaan 2 2 4


terpapar ke pekerja Pernafasan, sesak nafas, respirator
iritasi mata
Panas yang dihasilkan Pekerja mengalami dehidrasi 3 3 9 Penyediaan Minuman dan 2 2 4
oleh mesin hingga Heat Stress Pengaturan jam kerja sesuai NAB

3 Land Opening bulldozer terguling operator luka ringan hingga 3 4 12 Operator memiliki SIO dan 3 3 9
fatality memastikan mesin yang akan
digunakan dalam kondisi baik

Debu proses pembukaan Gangguan Saluran 3 3 9 Sosialisasi pentingnya penggunaan 2 2 4


lahan terpapar ke pekerja Pernafasan, sesak nafas, respirator
iritasi mata

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
Pe 0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
Rev. 0 Page 1 of 2
Issue Date 01/11/16
OHS Risk Assessment
T: Total Score Low [1 - 3] Medium [4 - 6] High [8 - 12] Extreme [15 - 25] RA Date: RA Ver. No.:
Evaluation Criteria: 1: Condition Assessed : 2: Control / Influence Status 3: Legal Status
[ LP: Likelihood - Probability / SV: Severity ] [ PC: Past Condition / NR: Normal / AB: Abnormal / EM: Emergency / NP: New Planned Activity ] [C/I] [ N: No; Y: Regulated ]

Inherent Risk [Before Control] Current Controls and/or Current Risk [After Control] Additional Controls and/or
No Activity Hazards Risk 1 2 4 Applicable Regulation
LP SV T Recommended Practice LP SV T Recommended Practice

0 0
0 0
0 0

Rev. 0 Page 2 of 2
Issue Date 01/11/16