DataBase Project Proposal

The document describes a student project to develop a Hotel Management System. The objectives are to create a basic, user-friendly system tailored for hotels in Pakistan that addresses issues like inefficient manual record keeping. It will automate major hotel operations like room management. The system will be developed using XAMPP, PHP, HTML and MySQL. It will have eight user interfaces and simplify daily processes. The project timeline includes requirements gathering, analysis, designing, implementation, testing and documentation from May to June.

Uploaded by

AliRaza
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
389 views4 pages

DataBase Project Proposal

The document describes a student project to develop a Hotel Management System. The objectives are to create a basic, user-friendly system tailored for hotels in Pakistan that addresses issues like inefficient manual record keeping. It will automate major hotel operations like room management. The system will be developed using XAMPP, PHP, HTML and MySQL. It will have eight user interfaces and simplify daily processes. The project timeline includes requirements gathering, analysis, designing, implementation, testing and documentation from May to June.

Uploaded by

AliRaza
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

Capital University of Science & Technology,

Islamabad
Department of Computer Science

Ali Raza (BSE-163147)


Maryam Ijaz (BBI-161999)
Sundas Rashid (BSE171026)

Submitted To:

Dr. Abdul Basit


Title: HOTEL MANAGEMENT SYSTEM

Introduction

We decided to base our project on a Hotel Management System mainly because even though we
have come from some of the ‘best’ hotel in Pakistan, their organization and management still
lags far behind when compared to similar Hotel abroad. In this era of technology, not having a
computerized system not only wastes time but also burden the staff of these organizations
unnecessarily.

When we analyze the situation we realized that the aversion to buying some of the brilliant
software’s providing hotel management system being sold online by foreign companies was not
because of the staff training issue but was largely due to cost, difference of hotel system and the
risk factor associated with the implementation and running of such software.

Objectives

We want to produces a very simple, basic, user-friendly and closet to the standard Pakistan
hoteling system kind of a model. For Example, the rooms in all the Hotels do not have a
computer-based record system for handling Guests, this is not only makes finding rooms for
guests a hassle but also takes long time.

Once we have completed our project we should want to present this system to our Hotels, so they
can benefits from the numerous advantages of technology (time-saving, efficient, faster
processing, less chance of loss etc.) and also improve their overall management and image.

Purpose

 To create environmental friendly system.


 To increase the financial benefits.
List of Deliverables

At the end of the report the team will be able:

 To apply this system into the market.


 To maintain the scope of this system into the market.

Tools & Technologies

 XAMPP Server
 Language used
 Front End(User Interface) HTML
 Server Language PHP
 Back End MYSQL

Scope

Hotel Management System is going to implemented and will automate the major operations of
the Hotel. The Room Management System is for manage all room types room services.
Administration department will monitor all. There is eight user End Interface for HMS.
The automated Management System is to simplify the day to day processes of the Hotel. The
system will able to handle many services to take care of all customers in a quick manner. As a
solution to the large amount of file handling happening at hotel, this software will be used to
overcome those drawbacks. The system should be user appropriate, easy to use, provide easy
recovery of errors and have and overall end user high subjective satisfaction.

Flow of the Project


The designing and implementation of the Hotel Management System with gathering of
requirements and examine the background of the Hotel. Although the current system is manual
and file based one, we realize that the system we are going to build must give the solution for
wastages of time and space which affects the efficiency of the daily activities performed at the
hotel. We have decided to have prototyping model to develop a Hotel Management System. A
prototype is built with basic and critical attributes. The designers build the database, user
interface and developers build working functions. After the user evaluates the prototype he or
she suggests improvements. This loop continues until the user is satisfied.

Project Timeline

Requirement Requirement
Designing
Gathering Analysis
(May 26)
(Today) (May 20)

Documentati
Implementati
Testing on
on
(June 10) (June 13)
(June 01)

Definitions, Acronyms and Abbreviation


 Hotel Management System (H.M.S)
 Software Requirements Specifications (SRS)
 The people who will actually using the system (END USER)
 Structural Query Language (SQL)