0% found this document useful (1 vote)
116 views5 pages

Fr065 Fai Form

This document is a first article inspection report for a part. It consists of 4 pages documenting information such as the part number, name, revision level, drawings, materials used, special processes, functional tests, characteristics verified, inspection results and signatures approving the inspection. The inspection verifies that the part meets all specifications and requirements before production.

Uploaded by

Seda Ersoy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (1 vote)
116 views5 pages

Fr065 Fai Form

This document is a first article inspection report for a part. It consists of 4 pages documenting information such as the part number, name, revision level, drawings, materials used, special processes, functional tests, characteristics verified, inspection results and signatures approving the inspection. The inspection verifies that the part meets all specifications and requirements before production.

Uploaded by

Seda Ersoy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 5

AS/EN/SJAC 9102 Rev B First Article Inspection

Sheet 1 of 4
FORM 1 - PART NUMBER ACCOUNTABILITY
1. Part Number: 2. Part Name: 3. Serial Number: 4. FAIR Number:

5. Part Revision Level: 6. Drawing Number: 7. Drawing Revision Level: 8. Additional Changes:

9. Manufacturing Process
10. Organization Name: 11. Supplier Code: 12. P.O. Number:
Reference:

Orsan OPS 7598

14. Full FAI _X_ Baseline Part Number (Including revision level): N/A
13. Detail Part: _X_
Partial FAI ___
Assembly FAI: ___ Reason for Partial FAI :

a)     if above part number is a detail part only, go to Field 19.


b)     if above part number is an assembly, go to the “INDEX” section below.
INDEX of part numbers or sub-assembly numbers required to make the assembly noted above.
15. Part Number: 16. Part Name: 17. Part Serial Number: 18. FAIR Number:

_x_ FAI Complete ___ FAI not Complete


20. Date:
19. Signature:

21. Reviewed By: 22. Date:

23. Customer Approval: 24. Date:

FR065/10.10.2017/R01
AS/EN/SJAC9102 Rev B First Article Inspection
FORM 2 - PRODUCT ACCOUNTABILITY – MATERIALS, Sheet 2 of 4
SPECIAL PROCESSES, AND FUNCTIONAL TESTING
1. Part Number: 2. Part Name: 3. Serial Number: 4. FAIR Number:

5. Material or Process Name: 6. Specification Number: 7. Code: 8.Supplier: 9. Customer


Approval 10. Certificate of
Verification: Conformance Number:
MATERIAL

PROCESS

11. Functional Test Procedure 12. Acceptance Report Number:


Number:

13. Comments

FR065/10.10.2017/R01
14. Signature: 15. Date

FR065/10.10.2017/R01
AS/EN/SJAC9102 Rev B First Article Inspection
FORM 3 - CHARACTERISTIC ACCOUNTABILITY, VERIFICATION, Sheet 3 of 4
AND COMPATIBILITY EVALUATION
1. Part Number 2. Part Name 3. Serial Number 4. FAIR Number

Characteristic Accountability Inspection / Test Results


5. Char. 6. Reference Location 7. Characteristic 8. Requirement 9. Results 10. Designed / 11. Nonconformance 14. Additional Data / Comments
No. Designator Qualified Tooling Number

1
2
3
4
5
6
7
8
9
10
11
12
13

14

15
16
17
18
19
20
21
22
23
24
25
26

12. Signature: 13. Date

FR065/10.10.2017/R01
AS/EN/SJAC9102 Rev B First Article Inspection
FORM 3 - CHARACTERISTIC ACCOUNTABILITY, VERIFICATION, Sheet 4 of 4
AND COMPATIBILITY EVALUATION
1. Part Number 2. Part Name 3. Serial Number 4. FAIR Number

Characteristic Accountability Inspection / Test Results


5. Char. 6. Reference Location 7. Characteristic 8. Requirement 9. Results 10. Designed / 11. Nonconformance 14. Additional Data / Comments
No. Designator Qualified Tooling Number

27

28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53

12. Signature: 13. Date

You might also like