0% found this document useful (0 votes)
52 views15 pages

Ers25 PM400

The document is a preventative maintenance work order for a reach stacker. It lists over 50 inspection tasks to check equipment like lights, sensors, wiring, and components in the cab, boom, spreader, transmission, engine and electrical systems. Technicians must indicate if each task is OK or not OK, and provide any necessary observations or comments.

Uploaded by

jimmy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
52 views15 pages

Ers25 PM400

The document is a preventative maintenance work order for a reach stacker. It lists over 50 inspection tasks to check equipment like lights, sensors, wiring, and components in the cab, boom, spreader, transmission, engine and electrical systems. Technicians must indicate if each task is OK or not OK, and provide any necessary observations or comments.

Uploaded by

jimmy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 15

OT N670605

Mantenimiento Preventivo - Orden de Trabajo (MP-OT)

PM 400 HORAS ELECTRICO / REACH STACKER (EMPTY) DRF100 52 S6 DPWL

1. Información del Trabajo

Grupo de activos: ECHN


Activo: RS1013N (ERS25)
Ubicación: 02.ECHN

Grupo supervisor :
Especialidad:ELEC
SUP_EQUI
Descripción: REACH STACKER EMPTY 1013 DPWL
Fecha de inicio previsto: 2022-11-21

Supervisor de turno:

El check indica la condición final del ítem sujeto a inspección.

OK significa: Tarea realizada, (a) si se encontró una observación en la tarea y fue resuelto en el momento se debe colocar un comentario y el
número de OT de tipo MCP que se generó para resolver dicha tarea y debe quedar en estado completado. El comentario y número de OT es de
carácter obligatorio, (b) si el estado final de la tarea es igual al estado inicial no se debe colocar comentario.
NO OK significa:

(a) REP, no se completó la tarea por falta de repuesto. El comentario y número de OT es de carácter obligatorio, se generará una OT tipo
MCP que quedará como backlog en estado APROB o EMAT. La OT tipo MCP generada a partir del NO OK por REP deberá tener reservado el repuesto
en la OT.

(b) PEN, no se completó la tarea por falta de: (1) Non Stock y/o Servicio, el comentario y número de OT es de carácter obligatorio, se
genera una OT tipo MCP que quedará como backlog en estado APROB o ESERV (el Supervisor de mantenimiento creará el requerimiento de non
stock y/o servicio en el sistema). (2) Por falta de especialidad empleada o por disponibilidad de equipo por parte de operaciones, se
reprogramará la tarea lo más antes posible a fin de culminar con todo el PM ó se creará una OT en estado APROB y deberá ejecutarse
según su programación y/o prioridad (es posible que el supervisor considere necesario que la tarea se ejecutará en el siguiente PM a programarse)

1° Vez que paró equipo para el PM

Fecha de Inicio: Fecha de Fin:

Hora de Inicio: Hora de Fin:

Nombre del ejecutor Tiempo Nombre del ejecutor Tiempo Nombre del ejecutor Tiempo

2° Vez que paró equipo para el PM

Fecha de Inicio: Fecha de Fin:

Hora de Inicio: Hora de Fin:

Nombre del ejecutor Tiempo Nombre del ejecutor Tiempo Nombre del ejecutor Tiempo

Pagina 1 de 5
Mantenimiento preventivo - Orden de trabajo (MP-OT)

PM 400 HORAS ELECTRICO / REACH STACKER (EMPTY) DRF100 52 S6 DPWL

USAR LOS EPP's QUE LA TAREA REQUIERE


AISLAR FUENTES DE ENERGIA, TAG & LOOK OUT

2. Clasificación del Trabajo y Status del Equipo

No OK Ejecutor
Tareas OK Observaciones / Comentarios
REP PEN ID

BOOM / ILUMINACION / VERIFICAR EL BUEN FUNCIONAMIENTO DE LOS


10 FAROS DE BOOM DERECHO E IZQUIERDO, EL CABLEADO NO DEBE
CONTENER EMPALMES

CABINA / ALTAVOZ / REVISAR BUEN ESTADO DE CONEXIONES


20 ELECTRICAS, CABLES DAÑADOS, REEMPLAZAR DE SER NECESARIO

CABINA / ILUMINACION / VERIFICAR EL BUEN FUNCIONAMIENTO DE


30 LOS FAROS DE CABINA DERECHO E IZQUIERDO, EL CABLEADO NO
DEBE CONTENER EMPALMES

40 CABINA / INSPECCION DEL SISTEMA DE AIRE ACONDICIONADO

CABINA / RADIO / REVISAR BUEN ESTADO DE CONEXIONES


50 ELECTRICAS, CABLES DAÑADOS, REEMPLAZAR DE SER NECESARIO

CABINA / REVISAR EL BUEN FUNCIONAMIENTO DEL MOTOR, BRAZO Y


60 PLUMILLA DEL LIMPIAPARABRISAS FRONTAL

CABINA / REVISAR EL BUEN FUNCIONAMIENTO DEL MOTOR, BRAZO Y


70 PLUMILLA DEL LIMPIAPARABRISAS POSTERIOR

CABINA / REVISAR EL BUEN FUNCIONAMIENTO DEL MOTOR, BRAZO Y


80 PLUMILLA DEL LIMPIAPARABRISAS SUPERIOR

CABINA / REVISAR EL FUNCIONAMIENTO DE INTERRUPTOR DE FRENO


90 DE PARQUEO

CABINA / REVISAR EL INTERRUPTOR DE ENCENDIDO O ARRANQUE DEL


100 EQUIPO

CABINA / REVISAR EN DISPLAY DE LA CABINA LA LECTURA DE LOS


110 SENSORES DEL HIDRAULICO Y FRENO.

CABINA / REVISAR EN DISPLAY DE LA CABINA LA LECTURA DE LOS


120 SENSORES DEL MOTOR, TRANSMISION

CABINA / REVISAR FUNCIONAMIENTO DE INDICADORES DE CABINA


130 ( FRENOS E HIDRAULICOS )

CABINA / REVISAR FUNCIONAMIENTO DE INDICADORES DE CABINA


140 ( MOTOR, TRANSMISION )

CABINA / REVISAR LAS LUCES DE ILUMINACION INTERNA DE LA


150 CABINA

CABINA / SEGURIDAD / REVISION DE ESTADO Y FUNCIONAMIENTO DE


160 CLAXON

CABINA / SEGURIDAD / VERIFICAR BUEN ESTADO DEL CINTURON DE


170 SEGURIDAD,NO DEBE TENER DAÑOS, ABOLLADURAS

CABINA / VERIFICAR EL BUEN ESTADO DE LA RADIO / MICRO Y EL


180 SOPORTE METALICO DEL MISMO

CABINA / VERIFICAR EL BUEN ESTADO DEL ALTAVOZ / MICRO Y EL


190 SOPORTE METALICO DEL MISMO

Pagina 2 de 5
Mantenimiento preventivo - Orden de trabajo (MP-OT)

PM 400 HORAS ELECTRICO / REACH STACKER (EMPTY) DRF100 52 S6 DPWL

USAR LOS EPP's QUE LA TAREA REQUIERE


AISLAR FUENTES DE ENERGIA, TAG & LOOK OUT

2. Clasificación del Trabajo y Status del Equipo

No OK Ejecutor
Tareas OK Observaciones / Comentarios
REP PEN ID

CABINA / VERIFICAR EL BUEN ESTADO Y FUNCIONAMIENTO DEL


200 TOUCH PANEL, EL SOPORTE METALICO DEBE ESTAR EN BUEN ESTADO

CABINA / VERIFICAR ESTADO Y FUNCIONAMIENTO DE LA PALANCA DE


210 MARCHAS

CABINA / VERIFICAR FUNCIONAMIENTO DEL SISTEMA DE


220 ILUMINACION DE LOS SWITCH DE LA CONSOLA

CABINA / VERIFICAR LA OPERATIVIDAD DEL VMT Y EL SPORTE


230 METALICO DEL MISMO

240 CABINA / VERIFICAR LA OPERATIVIDAD DE LAS CAMARAS

CAJA DE TRANSMISION: REVISION DE ELECTROVALVULAS Y BOBINAS


250 DE CAJA DE TRANSMISION

ESTRUCTURA / ILUMINACION / GUARDAFANGOS / VERIFICAR EL BUEN


260 FUNCIONAMIENTO DE LOS FAROS DE CAMINO DERECHO E IZQUIERDO,
EL CABLEADO NO DEBE CONTENER EMPALMES

ESTRUCTURA / ILUMINACION / CONTRAPESO / VERIFICAR EL BUEN


270 FUNCIONAMIENTO DE LOS FAROS DE RETROCESO DERECHO E
IZQUIERDO, EL CABLEADO NO DEBE CONTENER EMPALMES

ESTRUCTURA / SEGURIDAD / VERIFICAR BUEN ESTADO DE EXTINTOR E


280 INDICAR FECHA DE CADUCIDAD

ESTRUCTURA / SEGURIDAD / ACTUALIZAR LA HOJA DE INSPECCION DE


290 EXTINTOR

300 ESTRUCTURA / SEGURIDAD / REVISAR FUNCIONAMIENTO DE P?RTIGA

SISTEMA DE FRENO / ILUMINACION / VERIFICAR EL BUEN


310 FUNCIONAMIENTO DE LOS FAROS DE FRENO DERECHO E IZQUIERDO,
EL CABLEADO NO DEBE CONTENER EMPALMES

SISTEMA ELECTRICO / LIMPIAR Y VERIFICAR CONEXIONES DE TODOS


320 LOS MODULOS ELCECTRICOS DEL EQUIPO

SISTEMA ELECTRICO / LIMPIEZA GENERAL DEL COMPARTIMENTO DE


330 LA CAJA ELECTRICA

SISTEMA ELECTRICO / MEDICION DE VOLTAJE DE


340 BATERIA:__________VOLTIOS (RECARGAR SI ESTA POR DE BAJO DE LOS
12.5V)

350 SISTEMA ELECTRICO / REVISAR ARNES (CABLEADO) DEL BOOM

360 SISTEMA ELECTRICO / REVISAR ARNES (CABLEADO) DEL SPREADER

SISTEMA ELECTRICO / REVISAR ARNES (CABLEADO) Y SENSORES DE LA


370 CAJA DE TRANSMISIÓN

SISTEMA ELECTRICO / REVISAR ARNES (CABLEADO) Y SENSORES DEL


380 MOTOR

Pagina 3 de 5
Mantenimiento preventivo - Orden de trabajo (MP-OT)

PM 400 HORAS ELECTRICO / REACH STACKER (EMPTY) DRF100 52 S6 DPWL

USAR LOS EPP's QUE LA TAREA REQUIERE


AISLAR FUENTES DE ENERGIA, TAG & LOOK OUT

2. Clasificación del Trabajo y Status del Equipo

No OK Ejecutor
Tareas OK Observaciones / Comentarios
REP PEN ID

SISTEMA ELECTRICO / REVISAR EL CIERRE INDICADOR DE SEÑAL DE


390 LUZ DEL TWISTLOCK

SISTEMA ELECTRICO / REVISAR LA ACTIVACION DEL FRENO DE


400 PARQUEO ADELANTE Y REVERSA

SISTEMA ELECTRICO / REVISAR LA ACTIVACION DEL INTERRUPTOR


410 BYPASS

SISTEMA ELECTRICO / REVISAR TODOS LOS TERMINALES DE LA CAJA


420 ELECTRICA

SISTEMA ELECTRICO / REVISION Y LIMPIEZA DE TERMINALES DE LA


430 BATERIA (USAR CEPILLO DE ALAMBRE)

SISTEMA ELECTRICO / SEGURIDAD / INSPECCIONAR BUEN


440 FUNCIONAMIENTO DE ALARMA DE RETROCESO

SISTEMA ELECTRICO / SEGURIDAD / INSPECCIONAR BUEN


450 FUNCIONAMIENTO DE LA CIRCULINA (DEBE ENCIENDE AL ENCENDER
EL EQUIPO) Y TENER LA MICA LIMPIA

SISTEMA ELECTRICO / VERIFICAR FUNCIONAMIENTO DEL SISTEMA DE


460 SOBRE CARGA (ANTIVUELCO)

SPREADER / ILUMINACION / VERIFICAR EL BUEN FUNCIONAMIENTO DE


470 LOS FAROS DE SPREADER DERECHO E IZQUIERDO, EL CABLEADO NO
DEBE CONTENER EMPALMES

480 SPREADER / REVISAR APERTURA DE BRAZOS 20 FT X 40 FT

490 SPREADER / REVISAR ENCROCHE MANUAL DE TWIST LOCK

SPREADER / REVISION DE ESTADO DE FUNCIONAMIENTO DE SENSORES


500 DE PROXIMIDAD DE SPREADER

510 SPREADER / VERIFICAR EL BUEN ESTADO DE LA CADENA PORTACABLE

SPREADER / VERIFICAR ESTADO Y FUNCIONAMIENTO LUCES DEL


520 SEMAFORO

3. Comentarios

4. Lecturas

Pagina 4 de 5
5. Correctivos ejecutados durante este mantenimiento preventivo

Nombre del ejecutor Número de OT (CM) Descripción Hora de inicio Hora de fin

Supervisor de mantenimiento:

Pagina 5 de 5
OT N670658

Mantenimiento Preventivo - Orden de Trabajo (MP-OT)

PM 400 HORAS MECANICO / REACH STACKER (EMPTY) DRF100 52 S6 DPWL

1. Información del Trabajo

Grupo de activos: ECHN


Activo: RS1013N (ERS25)
Ubicación: 02.ECHN

Grupo supervisor :
Especialidad:MEC
SUP_EQUI
Descripción: REACH STACKER EMPTY 1013 DPWL
Fecha de inicio previsto: 2022-11-21

Supervisor de turno:

El check indica la condición final del ítem sujeto a inspección.

OK significa: Tarea realizada, (a) si se encontró una observación en la tarea y fue resuelto en el momento se debe colocar un comentario y el
número de OT de tipo MCP que se generó para resolver dicha tarea y debe quedar en estado completado. El comentario y número de OT es de
carácter obligatorio, (b) si el estado final de la tarea es igual al estado inicial no se debe colocar comentario.
NO OK significa:

(a) REP, no se completó la tarea por falta de repuesto. El comentario y número de OT es de carácter obligatorio, se generará una OT tipo
MCP que quedará como backlog en estado APROB o EMAT. La OT tipo MCP generada a partir del NO OK por REP deberá tener reservado el repuesto
en la OT.

(b) PEN, no se completó la tarea por falta de: (1) Non Stock y/o Servicio, el comentario y número de OT es de carácter obligatorio, se
genera una OT tipo MCP que quedará como backlog en estado APROB o ESERV (el Supervisor de mantenimiento creará el requerimiento de non
stock y/o servicio en el sistema). (2) Por falta de especialidad empleada o por disponibilidad de equipo por parte de operaciones, se
reprogramará la tarea lo más antes posible a fin de culminar con todo el PM ó se creará una OT en estado APROB y deberá ejecutarse
según su programación y/o prioridad (es posible que el supervisor considere necesario que la tarea se ejecutará en el siguiente PM a programarse)

1° Vez que paró equipo para el PM

Fecha de Inicio: Fecha de Fin:

Hora de Inicio: Hora de Fin:

Nombre del ejecutor Tiempo Nombre del ejecutor Tiempo Nombre del ejecutor Tiempo

2° Vez que paró equipo para el PM

Fecha de Inicio: Fecha de Fin:

Hora de Inicio: Hora de Fin:

Nombre del ejecutor Tiempo Nombre del ejecutor Tiempo Nombre del ejecutor Tiempo

Pagina 1 de 9
Mantenimiento preventivo - Orden de trabajo (MP-OT)

PM 400 HORAS MECANICO / REACH STACKER (EMPTY) DRF100 52 S6 DPWL

USAR LOS EPP's QUE LA TAREA REQUIERE


AISLAR FUENTES DE ENERGIA, TAG & LOOK OUT

2. Clasificación del Trabajo y Status del Equipo

No OK Ejecutor
Tareas OK Observaciones / Comentarios
REP PEN ID

BOOM / ESTRUCTURA / REVISAR POSIBLES GRIETAS EN LA


10 ESTRUCTURA

BOOM / LUBRICAR PATIN DE DESLIZAMIENTO DEL LADO TELESCOPICO


20 DE MOVIMIENTO DEL BOOM.

30 BOOM / LUBRICAR PIN PIVOTE DEL BOOM

BOOM / LUBRICAR PIN PIVOTE DEL CILINDRO DE ELEVACION


40 INFERIOR Y SUPERIOR

BOOM / REVISAR EL PIN PIVOTE DEL BOOM POR DESGASTE LADO


50 DERECHO

BOOM / REVISAR EL PIN PIVOTE DEL BOOM POR DESGASTE LADO


60 IZQUIERDO

BOOM / REVISAR POSIBLES FUGAS EN EL BLOQUE DE VALVULAS DEL


70 BOOM

BOOM /REVISAR ESTADO DE PRENSADO, FISURAS, FUGAS EN


80 MANGUERAS HIDRAULICAS

90 CABINA / VERIFICAR EL BUEN ESTADO DE LA PUERTA, CERROJO

CABINA / VERIFICAR EL BUEN ESTADO DE LAS LUNAS FRONTAL,


100 POSTERIOR Y LATERALES

110 CABINA / VERIFICAR EL BUEN ESTADO DE LOS PEDALES

CABINA / VERIFICAR EL BUEN ESTADO DEL ASIENTO (NIVELABLE) Y


120 APOYABRAZO

CABINA / VERIFICAR EL BUEN ESTADO DEL TAPIZADO (NO DEBE


130 PRESENTAR DAÑOS)

CABINA / VERIFICAR EL BUEN ESTADO Y FUNCIONAMIENTO DE LA


140 REGULACION DEL TIMON (ADELANTE ATRAS)

CAJA DE TRANSMISION / REVISAR EL BUEN ESTADO Y/O POSIBLE


150 FUGAS DE LA BOMBA DE TRANSFERENCIA

CAJA DE TRANSMISION / REVISAR EL BUEN ESTADO Y/O POSIBLE


160 FUGAS DEL BLOQUE HIDRAULICO DE LA CAJA

CAJA DE TRANSMISION /REVISAR ESTADO DE PRENSADO, FISURAS,


170 FUGAS EN MANGUERAS HIDRAULICAS

180 CAJA TRANSMISION / REVISAR EL NIVEL DEL FLUIDO DE TRANSMISION

190 CAJA TRANSMISION / AJUSTAR PERNOS DEL SOPORTE DEL EJE

Pagina 2 de 9
Mantenimiento preventivo - Orden de trabajo (MP-OT)

PM 400 HORAS MECANICO / REACH STACKER (EMPTY) DRF100 52 S6 DPWL

USAR LOS EPP's QUE LA TAREA REQUIERE


AISLAR FUENTES DE ENERGIA, TAG & LOOK OUT

2. Clasificación del Trabajo y Status del Equipo

No OK Ejecutor
Tareas OK Observaciones / Comentarios
REP PEN ID

CAJA TRANSMISION / EJE DE TRANSMISION / INSPECCIONAR EL


200 ESTADO, JUEGO O SONIDO EXTRAÑO EN RODAMIENTO DE CRUCETA

CAJA TRANSMISION / EJE DE TRANSMISION / REVISAR SU BUEN


210 ESTADO, CARDAN Y CRUCETAS (DESGASTE, PERNOS O SOLDADURA)

CAJA TRANSMISION / EXTRAER MUESTRA DE ACEITE DE CAJA, E


220 INDICAR LAS HORAS DE USO DEL ACEITE: _____________ HRS

CAJA TRANSMISION / REVISAR ALGUNAS FUGAS DE ACEITE DE LA


230 TRANSMISION

ESTRUCTURA / CHASIS / REVISAR POSIBLES GRIETAS O


240 DEFORMACIONES EN LA ESTRUCTURA

ESTRUCTURA / GUARDAFANGOS / REVISAR POSIBLES GRIETAS O


250 DEFORMACIONES

ESTRUCTURA / LAVADO DE TODO EL EQUIPO (INCLUYE LIMPIEZA DE


260 CABINA)

ESTRUCTURA / REVISAR CINTILLOS REFLECTIVOS. TODO ETIQUETADO


270 Y SENALIZACION QUE SE ENCUENTRE LEGIBLE

ESTRUCTURA / REVISAR POSIBLES GRIETAS O DEFORMACIONES EN


280 BARANDAS, ESCALERAS O PISOS

MOTOR DIESEL / EXTRAER UNA MUESTRA DE ACEITE DE MOTOR E


290 INDICAR HORAS DE USO DEL ACEITE : ___________________HRS

MOTOR DIESEL / EXTRAER UNA MUESTRA DE REFRIGERANTE E


300 INDICAR HORAS DE USO DEL REFRIGERANTE : ___________________HRS

MOTOR DIESEL / INSPECCIONAR LA VARILLA DE ACEITE DEL MOTOR


310 DIESEL

MOTOR DIESEL / INSPECCIONAR REFRIGERANTE, COMPLETAR O


320 REEMPLAZAR SI ES NECESARIO, CARGAR EL MATERIAL A ESTA OT DE
PM

MOTOR DIESEL / LIMPIAR ELEMENTO DE FILTRO DE AIRE PRIMARIO, SI


330 APLICA

MOTOR DIESEL / LIMPIAR ELEMENTO DE FILTRO DE AIRE SECUNDARIO,


340 SI APLICA

MOTOR DIESEL / REEMPLAZAR EL ACEITE 15W40 DE MOTOR DIESEL (6


350 GLN)

360 MOTOR DIESEL / REEMPLAZAR FILTRO DE ACEITE LF-3970

MOTOR DIESEL / REEMPLAZAR FILTRO DE AIRE PRIMARIO /


370 K AF-25756 / CUMMINS

MOTOR DIESEL / REEMPLAZAR FILTRO SEPARADOR DE AGUA-


380 COMBUSTIBLE FS-19732 (1 UND)

Pagina 3 de 9
Mantenimiento preventivo - Orden de trabajo (MP-OT)

PM 400 HORAS MECANICO / REACH STACKER (EMPTY) DRF100 52 S6 DPWL

USAR LOS EPP's QUE LA TAREA REQUIERE


AISLAR FUENTES DE ENERGIA, TAG & LOOK OUT

2. Clasificación del Trabajo y Status del Equipo

No OK Ejecutor
Tareas OK Observaciones / Comentarios
REP PEN ID

MOTOR DIESEL / REEMPLAZAR FILTRO PETROLEO 2992241 /


390 FLEETGUARD FF5485 / DONALDSON P550881 (1 UND)

MOTOR DIESEL / REVISAR EL ACELERADOR PARA UNA CORRECTA


400 OPERACION

410 MOTOR DIESEL / REVISAR EL VENTILADOR Y LA TENSION DE LA FAJA.

MOTOR DIESEL / REVISAR LA CONDICION DE LA MANGUERA DE


420 ENTRADA DE AIRE DEL SISTEMA DE ADMISION

MOTOR DIESEL / REVISAR LAS LINEAS DE COMBUSTIBLE POR


430 SEGURIDAD Y DANOS

MOTOR DIESEL / REVISAR TODAS LAS MANGUERAS DE


440 REFRIGERACION Y CONEXIONES POR FUGAS O DESGASTES

NEUMATICOS / AJUSTAR TODOS LOS ESPARRAGOS ( REEMPLAZAR SI ES


450 NECESARIO)

NEUMATICOS / REVISAR EL ARO DE LA LLANTA POR ALGUNOS


460 DEFECTOS O DANOS

NEUMATICOS / REVISAR LA LLANTA POSICION 01 POR ALGUNOS


470 DEFECTOS O DANOS

NEUMATICOS / REVISAR LA LLANTA POSICION 02 POR ALGUNOS


480 DEFECTOS O DANOS

NEUMATICOS / REVISAR LA LLANTA POSICION 03 POR ALGUNOS


490 DEFECTOS O DANOS

NEUMATICOS / REVISAR LA LLANTA POSICION 04 POR ALGUNOS


500 DEFECTOS O DANOS

NEUMATICOS / REVISAR LA LLANTA POSICION 05 POR ALGUNOS


510 DEFECTOS O DANOS

NEUMATICOS / REVISAR LA LLANTA POSICION 06 POR ALGUNOS


520 DEFECTOS O DANOS

SISTEMA DE DIRECCION / BIELAS / INSPECCIONAR LADO IZQUIERDO


530 PARTE EXTERNA, ADECUADO AJUSTE DE PERNOS Y VERIFICAR
SONIDOS EXTRAÑOS EN PINES

SISTEMA DE DIRECCION / BIELAS / INSPECCIONAR LADO DERECHO


540 PARTE EXTERNA, ADECUADO AJUSTE DE PERNOS Y VERIFICAR
SONIDOS EXTRAÑOS EN PINES

SISTEMA DE DIRECCION / BOMBA DE FRENO / REVISAR ESTADO DE


550 HERMETECIDIDAD, NO DEBE HABER FUGAS, NI RAJADURAS

SISTEMA DE DIRECCION / CILINDRO HIDRAULICO / REVISAR SU BUEN


560 ESTADO, VERIFICAR QUE NO HAYA FUGA DE ACEITE

SISTEMA DE DIRECCION / INSPECCIONAR Y AJUSTAR LOS PERNOS QUE


570 UNEN EL PUENTE DE DIRECCION CON EL CONTRAPESO

Pagina 4 de 9
Mantenimiento preventivo - Orden de trabajo (MP-OT)

PM 400 HORAS MECANICO / REACH STACKER (EMPTY) DRF100 52 S6 DPWL

USAR LOS EPP's QUE LA TAREA REQUIERE


AISLAR FUENTES DE ENERGIA, TAG & LOOK OUT

2. Clasificación del Trabajo y Status del Equipo

No OK Ejecutor
Tareas OK Observaciones / Comentarios
REP PEN ID

SISTEMA DE DIRECCION / MUÑONES / REVISAR LA CUBIERTA DEL PIN


580 ENTRE MUÑON DERECHO Y PUENTE DE DIRECCION Y EL ADECUADO
AJUSTE DE PERNOS

SISTEMA DE DIRECCION / MUÑONES / REVISAR LA CUBIERTA DEL PIN


590 ENTRE MUÑON IZQUIERDO Y PUENTE DE DIRECCION Y EL ADECUADO
AJUSTE DE PERNOS

SISTEMA DE DIRECCION / REVISAR CORRECTO FUNCIONAMIENTO Y


600 ESTADO SISTEMA DE ENGRASE AUTOMÁTICO (MANGUERAS, BLOQUE
DE VÁLVULA)

SISTEMA DE DIRECCION /REVISAR ESTADO DE PRENSADO, FISURAS,


610 FUGAS EN MANGUERAS HIDRAULICAS

SISTEMA DE ELEVACION /REVISAR ESTADO DE PRENSADO, FISURAS,


620 FUGAS EN MANGUERAS HIDRAULICAS

SISTEMA DE FRENO / CONTROL DE MEDICION DE PRESION DE


630 ACUMULADORES

SISTEMA DE FRENO / EXTRAER UNA MUESTRA DE ACEITE DE FRENO E


640 INDICAR HORAS DE USO DEL ACEITE : __________________ HRS

SISTEMA DE FRENO / REVISAR EFECTIVIDAD DEL FRENO DE SERVICIO


650 (MANDOS FINALES)

SISTEMA DE FRENO / REVISAR EL BUEN ESTADO DEL DISCO DE


660 PARQUEO, CALIPER Y PASTILLAS DE FRENO

SISTEMA DE FRENO / REVISAR EL FRENO DE PARQUEO PARA LA


670 CORRECTA OPERACION

SISTEMA DE FRENO / REVISAR EL NIVEL DE ACEITE DE FRENO, CARGAR


680 EL MATERIAL A ESTA OT DE PM (MAQUINA APAGADA Y EN REPOSO )

SISTEMA DE FRENO / REVISAR ESTADO Y FUNCIONAMIENTO DE


690 VENTILADORES FRENO.

SISTEMA DE FRENO /REVISAR ESTADO DE PRENSADO, FISURAS, FUGAS


700 DE MANGUERAS.

SISTEMA DE TRACCION / CORONA / REVISAR EL NIVEL DE ACEITE Y


710 EXTRAER UNA MUESTRA, INDICAR HORAS DE USO DE ACEITE:
___________ HRS

SISTEMA DE TRACCION / MANDOS FINALES / REVISAR SI HAY


720 PRESENCIA DE FUGA DE ACEITE POR LOS O´RINGS LADO DERECHO

SISTEMA DE TRACCION / MANDOS FINALES / REVISAR SI HAY


730 PRESENCIA DE FUGA DE ACEITE POR LOS O´RINGS LADO IZQUIERDO

SISTEMA DE TRACCION / MANDOS FINALES / REVISAR LOS NIVELES DE


740 ACEITE Y EXTRAER UNA MUESTRA, INDICAR HORAS DE USO DE
ACEITE: ___________ HRS

SISTEMA HIDRAULICO / BLOQUE PRINCIAPAL / REVISAR POSIBLES


750 FUGAS EN EL BLOQUE HIDRAULICO PRINCIPAL

SISTEMA HIDRÁULICO / ENGRASE AUTOMATICO / REVISAR LA BOMBA


760 DE ENGRASE AUTOMÁTICO Y MANGUERAS

Pagina 5 de 9
Mantenimiento preventivo - Orden de trabajo (MP-OT)

PM 400 HORAS MECANICO / REACH STACKER (EMPTY) DRF100 52 S6 DPWL

USAR LOS EPP's QUE LA TAREA REQUIERE


AISLAR FUENTES DE ENERGIA, TAG & LOOK OUT

2. Clasificación del Trabajo y Status del Equipo

No OK Ejecutor
Tareas OK Observaciones / Comentarios
REP PEN ID

SISTEMA HIDRÁULICO / EXTRAER UNA MUESTRA DE ACEITE E INDICAR


770 HORAS DE USO DEL ACEITE: ______________ HRS

SISTEMA HIDRAULICO / REVISAR EL ESTADO DE LAS MANGUERAS


780 HIDRAULICAS POR POSIBLE FUGA O DAÑO

SISTEMA HIDRAULICO / REVISAR EL NIVEL DE ACEITE HIDRAULICO,


790 CARGAR EL MATERIAL A ESTA OT DE PM (MAQUINA APAGADA Y EN
REPOSO )

SISTEMA HIDRAULICO / REVISAR ESTADO Y FUNCIONAMIENTO DE


800 VENTILADORES DEL SISTEMA HIDRAULICO

SISTEMA HIDRÁULICO / REVISAR TEMPERATURA DEL ACEITE


810 HIDRAULICO.

SISTEMA HIDRÁULICO /REALIZAR MUESTREO DE ACEITE HIDRAULICO


820 ANTES DEL FILTRADO.

SISTEMA HIDRÁULICO /REALIZAR MUESTREO DE ACEITE HIDRAULICO


830 DESPUES DEL FILTRADO.

SISTEMA HIDRÁULICO /REALIZAR REFILTRADO DEL ACEITE TIEMPO


840 MINIMO 02 HORAS

SISTEMA HIDRÁULICO /REVISAR ESTADO DE PRENSADO, FISURAS,


850 FUGAS DE MANGUERAS.

SPREADER / ESTRUCTURA / REVISAR POSIBLES GRIETAS EN LA


860 ESTRUCTURA

SPREADER / INSPECCION DE ESTADO DE BARRA DE ACCIONAMIENTO


870 DE TWISLOCK LADO DERECHO

SPREADER / INSPECCION DE ESTADO DE BARRA DE ACCIONAMIENTO


880 DE TWISLOCK LADO IZQUIERDO

SPREADER / INSPECCION DE ESTADO DE HORQUILLA Y ROTULA DE


890 BARRA DE ACCIONAMIENTO DE TWISLOCK DERECHO / IZQUIERDO

SPREADER / INSPECCION Y AJUSTE DE PERNO REGULADOR DE BARRA


900 DE ACCIONAMIENTO DE TWISLOCK DERECHO / IZQUIERDO

910 SPREADER / LUBRICAR CORONA DE TORNAMESA

SPREADER / LUBRICAR EL CANDADO (FRENO) DEL EJE DE GIRO Y


920 PALANCA DE CONEXION

SPREADER / LUBRICAR ENCLAVAMIENTO MECANICO ( TWIST LOCK


930 DERECHO PARTE DELANTERA )

SPREADER / LUBRICAR ENCLAVAMIENTO MECANICO ( TWIST LOCK


940 LADO DERECHO PARTE POSTERIOR )

SPREADER / LUBRICAR ENCLAVAMIENTO MECANICO ( TWIST LOCK


950 LADO IZQUIERDO PARTE POSTERIOR )

Pagina 6 de 9
Mantenimiento preventivo - Orden de trabajo (MP-OT)

PM 400 HORAS MECANICO / REACH STACKER (EMPTY) DRF100 52 S6 DPWL

USAR LOS EPP's QUE LA TAREA REQUIERE


AISLAR FUENTES DE ENERGIA, TAG & LOOK OUT

2. Clasificación del Trabajo y Status del Equipo

No OK Ejecutor
Tareas OK Observaciones / Comentarios
REP PEN ID

SPREADER / LUBRICAR ENCLAVAMIENTO MECANICO ( TWIST LOCK


960 LADO IZQUIERDO PARTE DELANTERA )

970 SPREADER / LUBRICAR LOS CILINDROS DE BALANCEO

980 SPREADER / LUBRICAR PIN DE EXTENSION DEL CILINDRO

990 SPREADER / LUBRICAR PIN PIVOT DE AGARRE DEL SPREADER

1000 SPREADER / LUBRICAR RODAMIENTO TORNAMESA DEL SPREADER

SPREADER / REVISAR EL CILINDRO DE TWISTLOCK POR FUGAS O DANO


1010 LADO DERECHO

SPREADER / REVISAR EL CILINDRO DE TWISTLOCK POR FUGAS O DANO


1020 LADO IZQUIERDO

SPREADER / REVISAR EL PIN DEL SOPORTE DEL SPREADER POR


1030 DESGASTE O DANO LADO DERECHO

SPREADER / REVISAR EL PIN DEL SOPORTE DEL SPREADER POR


1040 DESGASTE O DANO LADO IZQUIERDO

SPREADER / REVISAR EL PIN DEL TWISLOCK POR DESGASTE O DANO


1050 LADO EXTERIOR DERECHO

SPREADER / REVISAR EL PIN DEL TWISLOCK POR DESGASTE O DANO


1060 LADO EXTERIOR IZQUIERDO

SPREADER / REVISAR EL PIN DEL TWISLOCK POR DESGASTE O DANO


1070 LADO EXTERIOR IZQUIERDO

SPREADER / REVISAR EL PIN DEL TWISLOCK POR DESGASTE O DANO


1080 LADO INTERIOR DERECHO

SPREADER / REVISAR ENCLAVAMIENTO MECANICO DE INTERLOCK POR


1090 DESGASTE Y DANO LADO EXTERIOR DERECHO

SPREADER / REVISAR ENCLAVAMIENTO MECANICO DE INTERLOCK POR


1100 DESGASTE Y DANO LADO EXTERIOR IZQUIERDO

SPREADER / REVISAR ENCLAVAMIENTO MECANICO DE INTERLOCK POR


1110 DESGASTE Y DANO LADO INTERIOR DERECHO

SPREADER / REVISAR ENCLAVAMIENTO MECANICO DE INTERLOCK POR


1120 DESGASTE Y DANO LADO INTERIOR IZQUIERDO

SPREADER / REVISAR LA ROTACION DE LOS REDUCTORES DE GIRO DEL


1130 SPREADER

SPREADER / REVISAR POSIBLES FUGAS EN EL BLOQUE DE VALVULAS


1140 (DE TWIST LOCK Y 20/40)

Pagina 7 de 9
Mantenimiento preventivo - Orden de trabajo (MP-OT)

PM 400 HORAS MECANICO / REACH STACKER (EMPTY) DRF100 52 S6 DPWL

USAR LOS EPP's QUE LA TAREA REQUIERE


AISLAR FUENTES DE ENERGIA, TAG & LOOK OUT

2. Clasificación del Trabajo y Status del Equipo

No OK Ejecutor
Tareas OK Observaciones / Comentarios
REP PEN ID

SPREADER / REVISAR POSIBLES FUGAS EN EL BLOQUE DE VALVULAS


1150 (GIRO/COMPENSACION/FRENO CANDADO)

SPREADER / REVISAR POSIBLES FUGAS EN EL BLOQUE DE VALVULAS


1160 (SIDESHIFT)

SPREADER / REVISAR Y AJUSTAR PERNOS DEL SOPORTE DEL CILINDRO


1170 DE APERTURA 20-40 DERECHO

SPREADER / REVISAR Y AJUSTAR PERNOS DEL SOPORTE DEL CILINDRO


1180 DE APERTURA 20-40 IZQUIERDO

SPREADER / REVISAR Y AJUSTAR PERNOS DEL SOPORTE DEL CILINDRO


1190 DE SIDE SHIFT LADO EXTERIOR

SPREADER / REVISAR Y AJUSTAR PERNOS DEL SOPORTE DEL CILINDRO


1200 DE SIDE SHIFT LADO INTERNO

SPREADER / VERIFICAR AJUSTE, DESGASTE DE BAQUELITAS DE


1210 DESLIZAMIENTO DE CAJON CENTRAL MOVIL Y FIJO

SPREADER / VERIFICAR Y AJUSTAR PERNO DEL PIN DE CILINDROS DE


1220 COMPENSACION DERECHO

SPREADER / VERIFICAR Y AJUSTAR PERNO DEL PIN DE CILINDROS DE


1230 COMPENSACION IZQUIERDO

SPREADER /REVISAR ESTADO DE PRENSADO, FISURAS, FUGAS DE


1240 MANGUERAS HIDRAULICAS

1250 TOMAR INFORMACION DEL CUENTA CONTEINERS DE 20 Y 40 PIES

3. Comentarios

4. Lecturas

5. Correctivos ejecutados durante este mantenimiento preventivo

Nombre del ejecutor Número de OT (CM) Descripción Hora de inicio Hora de fin

Pagina 8 de 9