Transmittal No. Date
contrat Name: Project ie
contrat No. Location:
‘Saudi Aramco Approval Status Code
Approved ‘correct & Resubmit *For Information “Other as Noted
*Roproved with Comments *Not Approved * No Comments
For Action
PSAL Reference No.
Document No | Rev Subject status | aty | Remarks
| "03 | NOT CONTROL PROCEDURE REVO ‘Approved | 1
"Reviwed & Accepted”
“Transmitted by Received By Received Date:[NDT Control Procedure
‘TABLE OF CONTENTS
- SCOPE
2. PURPOSE
3. REFERENCE
4, DEFINITIONS
5. RESPONSIBILITIES
. PROCEDURE
/ NOT SELECTION IN SHOP & FIELD
3. EXECUTION OF NDE INSPECTION IN SHOP(NIGHT)
‘9. EXECUTION OF NDE INSPECTION IN SHOP(OAY)
10. EXECUTION OF NOE INSPECTION IN FIELD
114, WORK PERMIT SYSTEM AND TEMPORARY ISOTOPE STORAGE PIT FACILITY
£2, MEASURES OF CONTROLLING RESHOOT
133, RADIOGRAPHIC EXAMINATION
114, MAGNETIC PARTICLE AND LIQUID PENETRANT EXAMINATION.
15, ULTRASONIC TESTING
16. Capps
417, Documentation
Paget of 20[NDT Control Procedure
1. Score
‘This procedure outines the method of Controing NDT activites in Shop & Fld for piping
‘works a5 per Saul Aramco Engineering Standards for Fadil Sulfur Recovery Unt. NSH
shal be fully responsible to conduct the NDT activites In line with Saudh Aramco
specication and Purchase order fortis projec, which includes ut nt limited to this NOT
Control Procedure.
“he purpose ofthis procedure isto expla the NOT in process veretion, Control of Welé
Joint Selection, Repairs, ané Reporting of NOT acts for Fadil Sultur Recovery Unt
ASME Section V+ Non Destructive Examination
SAES-W-031 Wilding Requirement for On-lt png
‘saeP-1360 Tracking and Reporting of Welding, NOT and Pressure Testing for
Capita Project
sAEP-1161 Radiation Protection for Indust Radiography
saep-1342 ‘Quaiiestion of Non-Saudl Aramco NOT Personnel
saer-1143 Radiography Exaninston
sAeP-1144 Magnetic Particle Examination
sAeP-1145 Liquit Penetrant Cxaminaion
4. DEFINITIONS
‘ower / COMPANY
(CONTRACTOR
cops
Rr
Page? 0f 20[NDT Control Procedure
nor ‘Non Destretive Testing
ur Manual Ultrasone Thickness Testing,
Pune Post Weld Hest Treatment.
a Hardness Test
oF “Time of Fight Oiracton
aur Phased Aray Ulvaseni Testing
THIRD PARTY Saud Aramco approved NOE service provider.
5, RESPONSIBILITIES OF NSH PERSONNEL
‘Qc Manager is responsible for implementing this procedure. He is also responsible
for investigating the cause of non-conforming product, qualty contro activites such
36 Tee and Inepection of partula jb
Lead NDE Coordinators responsible for ensuring that all NOT activites are cared
fox In accordance with this procedure; ensuring that all evant actives are
document on the appropriate report ensuring tat the third party procedures and
personnel quaifeations approved for performing NOT actvties & Monitor the
renewal ensuring that all relevent equipment used in NOT actives have ® valid
calibration and a valid work perm; also response forall Weelly NOT quaty
reports to PSAL/ARAMCO,
[NOT Coordinator on ste & fed shall work under the supervision of Lead NDE
Coordinator: ensuring that all he work activites are carried az per tis Approved
(QC Welding Inspectors are responsible for ensuring that the NOT actives are
cared out in accordance wth this procedure; ensuring that al relevant actives are
documented on appropriate reports; ensuring corect jon ae requested, and time
of execution of Requested jot to avoid backlogs.
Sefety Officer is responsible fr all he NDE Work s cased out an Valid Permit &
‘Approved ISA (ob Hazard Safety Analysis)
‘Third Party RSO/RPO (Radiation Safety/Protection Officer is responsible to
carryout RT Inspection at right & day with proper supervision as per SAEP-1141 Ho
shall ensure tht the RT tochrians who are performing the Job are carted
radiographers & have Calrated Equipment’ for Jonizing Racation; ensuring that al
radiation sources have vai callratoncarticate& KASCT (King Abdulakate cy for
Soence & Technology) teense
Page3 of 20[NDT Control Procedure
53.07. Third Party Technician Is responsible for performing Radagraphy Inspection with
proper technique & flows all the project safety rules to execute the Job i sate way.
They shall be corti Radiogaphers, nave vali RPP (Radition protection Permit),
should have completed in house traning & min 3 years’ experience in Ralosraphy
Inspection.
53.08, Third Party RTFT is responsible to review RT fms az per Aramco Codes &
Standards: ensuring that al rechots & repr fms are matched with fresh shooted
Joints; ensuring RIFI assessments are prepared as per PSAL/ARAMCO formats. RTFL
personnel shal approved by Saud Aramco for carrying out RT Fl interpretation
6.1.01 NOT actvties Documentation shall be controls in accordance with SAEP-1160 8 as
er purchase order for the project.
6.1.02 NOT Control Procedure ospectons shall be carid aut in acordance with ASME
‘Section V8 as per purchase order fortis project.
1.1.03 Selection of weld joits to cover NOT requirements shall perform by NSH/Petrofac
land Sauel Aramco 8 as por purchase erer fortis projec.
6.1.04 All els shall te visualy Inspected and accepted prior to performing before NDT.
6.1.05 NSH shall witness, review, ané approve all inspedion and test performed by NOT
service providers.
6.1.05 NDT shal be witness by approved Welding Inspector & NDT Caordinator of NSH.
6.1.07 NOT performed subsequent to repair of rejected weld Joints shall be conducted by
Same NOT service provider who inily identifies the rection unless such NOT
service provider sn longa associated with Project.
6.1.08 Reports of PT and MT shall be prepared on ste at the same tests are conducted and
prior to any repairs.
6.1.09 Saudi Aramco NOT azeecement recut shal be considered fin
6.1.10 NOT assessment dsagroement rates upto 5% reasonable, Rates greater than S% are
an ndeation of necessary corrective action by NSH.
6.1.11 Al personnel of NSH conducting NOT shall meet the requirements as descibed in
‘Schedule @& shal be approved by PSAL/ARAMCO,
Pages of20[NDT Control Procedure
1 Saudi Aramco specification and Purchase
‘Order but not limited to below:
7.4.03
71.08
An
7.4.08
24.07
Ly
eo
7.4.10
[NDT selection shall be through ally Welding Reports with PSAL/ARAMCO
particpation
Dally welding reports and NDT selected joints shall be encoded to Capps (NSH
Database) by authorized data entry personne,
LEAD NDE Coorinator shall prepare NOT Request/Offer through Capps and ost
_appeoval from PSAL/ARANCO,
A jin which ae oer for NDE shall be fst verte by NOT Coordinators &
ensure thatthe joint are visually accopted by welding Inspector before offering to
NOT technicians.
IT Joints shall be checked property withthe request Isometric Orawinge and needs
Yellow/black strip coor tapes. Ropar its shall be used wit re coor strip tapes.
NSH to avoid the contaiets with other system and this procedure.
NOT Coordinator at Wight shit shal ensure al RT jolts offered ta Technicians are
ross verified wth RT Request & Isometric Drawings.
Selection of Harness test fr any PWHT quest Jints shall be performed ont after
te Joints acoptance of PIT,
PUT & HT Joints shall be identified with request & Isometric Drawings and needs
Due color stip tapes.
PL its shall be dentiied with request & Isometric drawings and needs eed/white
coor strip tapes.
Fuorescent penetrant testing shal be performed on Day & Night with necessary
‘arrangement to perform the NOT to avoid any delay under PSAL/ARAMCO
‘Manual UTT shall be performed as per requrement from PSAL/ARANCO. Thickrest
‘measurement shall be documented & recorded in Capp.
{8. execution of NDE Inspection in SHOP (Night)
‘execution in Shop shall be as per Saudi Aramco specification and the
Purchase order but not limited to below and NSH shal ensure the zero backlog to
‘execute the NOT work (irrespective the number of erew)-
Page 5 of 20e101.
e102
e108
2.2.05
2.1.08
8.109
a0
aaa
eat4
esas
e136
ena?
[NDT Control Procedure
‘SAEP-1143 Raclographic examination procedure shall be governed for pecforming &
evaluating ofthis Procedure
[Al safety procedure shall be comple for Sfe Barricaing & escape rovtes
igh intensity Gamma Camaras (Ir192) shall be used in Bunker for High thickness
obs, loose spools of 5° above
[NOT Coordinator (RT) stall dstrbute Request property to each Crew according to
{hair capability of work
1 crows shall be arranged a6 per the joints Requested, schedule & size of Weld
soins.
[NOT Coordinator shall ensure rot more than 1 Crew is working in same lation to
avoid any discrepancies or Fim Artacts Occurred during inspection,
‘Awareness of Fim aeisets eccured during Inspection shall be given by NOT
Coordinator to RT Technicians prior to Daly tutes
in 25 joins of small bore from 2° to 6" of 105, 205, and 40S shal be offered to 2
‘to mavimize the productvty & quality.
in 20 joints of 8” to 18” of 40S thiknass shall be given to crew for maximum
productivity & quay.
Mn 15 ots of 18° to 24” of 40 thickness shal be given tot crew
in 0 joints of 24°to 32° of 40 thickness shal be offre to 1 cre.
Mn 6 Joints of Big Bore fram 36 o 42" shale offered to 1 Crew.
in 15 joins 0.5" to 16° of €05 & above shall be provided to 4 crew for better
quality & max produtivty
Bi bore Joints shall be paroramically perform to maximize the productivity as per
the SAEP-1143 as applicable,
High ntensty Gamma Cameras as per low of land shal be sed fr High tcknese
{obs for max productivity; ensuring that al safety pracices ere governed as per
‘SAEP-1141 a8 appleabe
8 bores shal be placed on stand, meter above ground for fim placing om weld
soit
6 (Type 1) fim shal be used upto 6 for beter quality resus of approved Brand 2s
Page 6 20