IMG - 0002 EE Past Board Problem MRC 4

This document announces a registered electrical engineers pre-board examination to be held on January 26, 2014 from 8:00 am to 2:00 pm. It lists 60 multiple choice questions that will be included on the examination, covering professional electrical engineering subjects like three-phase power systems, generator and motor operation, transmission lines, and circuit analysis. The questions cover topics like inductive reactance calculations, generator and motor operating characteristics, power measurements, induction motor parameters, and frequency calculations for RLC circuits.

Uploaded by

Bugoy2023
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
36 views1 page

IMG - 0002 EE Past Board Problem MRC 4

This document announces a registered electrical engineers pre-board examination to be held on January 26, 2014 from 8:00 am to 2:00 pm. It lists 60 multiple choice questions that will be included on the examination, covering professional electrical engineering subjects like three-phase power systems, generator and motor operation, transmission lines, and circuit analysis. The questions cover topics like inductive reactance calculations, generator and motor operating characteristics, power measurements, induction motor parameters, and frequency calculations for RLC circuits.

Uploaded by

Bugoy2023
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

UULTTVECTOR REVIEW AND TRAINING CENTER

.THE ESTABLISHED LEADER IN E.E. REVIEW"


Manlla

REGISTERED ELECTRICAL ENGINEERS Pre-Board Examination


Sunday, January 26,2014 8:00 a.m. - 2:00 p.m.

PROFESSIONAL ELECTRICAL ENGINEERING SUBJECTS

49. A single-circuit three-phase line operated at 60 Hz is arranged in a triangular configuration with


distances of 20 ft, 20 ft and 38 ft between conductors. The conductors are ACSR Drake with GMR of
0.0373 ft. Find the inductive reactance per mile Fer-Bhase.
A. 0.478 r) 8.0.578 O Gi0.788 O D. 0.678 rl
50. A 120-v shunt motor has an armature equivalent of 0.5 O and a field resistance of 60 O. At full-load,
the motor takes 10 A and the speed is 1,000 rpm. At what speed must this motor may be driven as a
generator to deliver 10 A tq^qn extemal load at 120 \/?
A. 1,158 rpm tB*)t,Oae rpm C.1,262rpm D. 1,045 rpm

51.The tenninal voltage of a Y-connected load consisting of three equal impedances d 2O230" O is
4.4 kV line to line. The impedance in each of the three lines connecting the load to a bus at a
substation is 21= 1.4 t75 O. Find the line to line voltage at the substation bus.
A.4.52 kV sp+.Oa w C.4.48 kV D.4.58 kV
52. The reac'tance of a generator designated X" is given as 0,25 per unit based on the generatofs
nameplate rating of 18 kV, 500 MVA. The base for calculations is 20 kV, 100 MVA. Find X" on the new
basg"_.
$,0.0405 pu 8.0.0504 pu C, 0.0450 pu D. 0.0540 pu
53. lf the voltage is doubled, the ampacity of a conductor
A. increases B. decreases C. doubles
lphemains thp same
il. A 2A kW, 200 v shunt generator is operated at rated load. lf the driving engine is developing 30 bhp,
determine the iron and friction losses. Armature resistancs is 0.05 ohm and shunt field resistance is
50 ohms.
A. 1,340w S.lt,oss w C. 954 w D. 1,034 w
55. A three-phase altemator hqs 6 slots per pole per phase. Determine the dlstribution fac{or.
I
A.0.e77 L*0.e56 C.0.963 D.0.948
56. Thepurpose of a grid system is to
{A;interconnect the power stations
B. supply energy to remote areas
C. make extra high voltrage available to consumers
D. make distribution of energy at reasonable cost
57. As the load is increased the speed of a dc shunt m6tor will
A. remain constant G increase proportionately
B. increase slightly Qr,ireduce slightly
58. Power in a balanced 3-phase system is measured by the two-wattmeter method and it is.found that the
ratio of the two wattmeter rggdings is 2 is to '1 . What is the power factor of the system?
A.0.9 {Etn.a6o c.0.82 D.0.707
59. A 50 HP, 440 v, 3-phase, 60 Hz, 6-pole squinel cage induction motor is operating at full-load and 0.E
power factor. The fullload efficiency is 85% and the percentrage slip is 5%. Determine the full-load
torque.
A. 214.55 N-m 8.206.72 N-m r.r-m D.323.24 N-m
$Prz.+z
60. A 170+nile, 230-kV, 60 Hz, three-phase single-circuit transmission line uses a triangular anangement
with 20 ft, 20 ft and 36 ft spacing, respec{ively. lf the line conductors have a GMR of 0.0217 ft,
determine the capacitive susceptance to neutral per mile.
i&i4.81 x 10{ mho per mile C.7.92 x 10] mho per mile
B. 12.74 x 10* mho per mile O.2.47 x 10* mho per mile
Sl.AseriesRLCcircuithasR=100ohms,L=100pHandC=l00pF.WhatisthefrequencyinMHZat
unitXpower factor?
{}1.se B.1.36 c. 15.9 D. 13.6