Reconditioning of Tongue/stock rails require high precision and quality control. Therefore,
it is mandated to undertake the work on cess or in depot only. In this connection
provisions of IRPWM and Manual for reconditioning of MM steel P&C, SEJs and CMS
crossing (Rev 2020), In-situ reconditioning of switches is prohibited. Relevant Provisions
are reproduced as under:
Provision of Para 7.1.3.2 of Manual for reconditioning of MM steel P&C, SEJs and
CMS crossing:-
“Reconditioning of Tongue rail inside the track leads to unsafe condition. Due yto
pressure of clearing traffic block, it may not be always possible to complete all activities
in the available block time leading to unsafe condition, Therefore, the reconditioning of
worn out tongue rail shall be done by taking it outside the track and can be done on cess
or in depot”.