ITP-Onshore-Pipeline PTM

This document provides an inspection and test plan for certifying an on-shore pipeline from MT-L-8385 M.8 station to MT-R-6205 M.6 station. It lists over 100 activities to be inspected, including document review, material verification, welding, coating, testing and commissioning. Responsibilities are assigned to PT Pertamina Hulu Sanga Sanga, PT Putra Tunggal Mandiriutama and a third party inspection company. Inspections will verify conformance with standards such as API, ASME, NACE and SNI-13-3474.

Uploaded by

Ferdie OS
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
267 views2 pages

ITP-Onshore-Pipeline PTM

This document provides an inspection and test plan for certifying an on-shore pipeline from MT-L-8385 M.8 station to MT-R-6205 M.6 station. It lists over 100 activities to be inspected, including document review, material verification, welding, coating, testing and commissioning. Responsibilities are assigned to PT Pertamina Hulu Sanga Sanga, PT Putra Tunggal Mandiriutama and a third party inspection company. Inspections will verify conformance with standards such as API, ASME, NACE and SNI-13-3474.

Uploaded by

Ferdie OS
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

INSPECTION AND TEST PLAN

ON-SHORE PIPELINE CERTIFICATION


Project : TRUNKLINE 6" FROM MT-L-8385 M.8 STATION TO MT-R-6205 M.6 STATION
Owner : PT. PERTAMINA HULU SANGA SANGA
User : PT.PUTRA TUNGGAL MANDIRITMA
Location : PHSS KALTIM
3rd Party Insp. : Migas Letter assignment R : Review SW : Spot Witness
No. : - S : Surveillance / Inspection V : Verify
Project Ref. : Tgl. : - W : Witness Inspection H : Hold point
Project Duration : P : Perform & Provide N/A : Not Applicable

Surveillance Inspection
Reference Acceptance 3rd Party
No Activity
Document Documents required Criteria PTM PHSS Insp. Comp. MIGAS

1 Document Review
- QA / QC Procedure SNI-13-3474 QA Manual, QC Procedure SNI-13-3474 P R R
- Construction procedure Owner Spec.& SNI-13-3474 Construction Procedure Owner Spec.& SNI-13-3474 P R R
- Design basis
a. Pipeline routing, incl. ROW Owner Spec.& 300K Design document Owner Spec.& 300K N/A P R
b. Physical and chemical characteristics of fluid Owner Spec.& SNI-13-3474 Design document Owner Spec.& SNI-13-3474 N/A P R
c. Material selection incl. Internal corrosion
assessment Owner Spec.& API Spec 5L Design document Owner Spec.& API Spec 5L N/A P R
d. Temperature / pressure profile Owner Spec.& SNI-13-3474 Design document Owner Spec.& SNI-13-3474 N/A P R
e. Pressure containment (wall thickness calc.) Owner Spec.& SNI-13-3474 Calculation sheet Owner Spec.& SNI-13-3474 N/A P R
f. Pipeline expansion (if applicable) Owner Spec.& SNI-13-3474 Design document Owner Spec.& SNI-13-3474 N/A P R
g. Free span assessment (if applicable) Owner Spec.& SNI-13-3474 Design document Owner Spec.& SNI-13-3474 N/A P R
h. Lateral snaking assessment (if applicable) Owner Spec.& SNI-13-3474 Design document Owner Spec.& SNI-13-3474 N/A P R
I. Crossing design (if applicable) Owner Spec.& API 1102 Design document Owner Spec.& API 1102 N/A P R
j. Tie-in design (if applicable) Owner Spec.& SNI-13-3474 Design document Owner Spec.& SNI-13-3474 N/A P R
k. Trenching assessment (if applicable) Owner Spec.& SNI-13-3474 Design document Owner Spec.& SNI-13-3474 N/A P R
l. Pig launcher / receiver design (if applicable) Owner Spec.& SNI-13-3474 Design document Owner Spec.& SNI-13-3474 P R R
m. Flange calculations (if applicable) Owner Spec.& ASME B16.5 Design document Owner Spec.& ASME B16.5 N/A P R
n. T-joints, valves, etc. (if applicable) Owner Spec.& SNI-13-3474 Design document Owner Spec.& SNI-13-3474 N/A P R

- Pipeline drawings Drawings V P V


- WPS / PQR and Welder Certificate ASME IX / API 1104 WPS / PQR and Welder Certificate ASME IX / API 1104 P R R
- NDT procedure and NDT personnel certificate ASME V / API 1104 NDT procedure and personnel certificate ASME V / API 1104 P R R
- Repair procedure Owner Spec.& API 1104 Repair procedure Owner Spec.& API 1104 P R R
- Hydrostatic test procedure Owner Spec.& SNI-13-3474 Hydrostatic test procedure Owner Spec.& SNI-13-3474 P R R
- Cleaning, pigging, and drying procedures Owner Spec.& SNI-13-3474 Cleaning procedure Owner Spec.& SNI-13-3474 P R R
- Safety devices and Instrumentation system Owner Spec.& SNI-13-3474 Data sheet, manufacturer certificate Owner Spec.& SNI-13-3474 P R R
- Environmental protection and control system Owner Spec.& 84K AMDAL / UKL-UPL report Owner Spec.& 84K N/A P R
- Corrosion control system
a. Cathodic protection design report Owner Spec.& NACE Design report Owner Spec.& NACE N/A P R
b. Anode manufacturing and installation spec. Owner Spec.& NACE Design report Owner Spec.& NACE N/A P R
c. Coating manufacturing specifications Owner Spec.& NACE Design specification Owner Spec.& NACE N/A P R
d. Field joint coating specification Owner Spec.& NACE Design specification Owner Spec.& NACE N/A P R
e. Corrosion monitoring system specification Owner Spec.& NACE Design specification Owner Spec.& NACE N/A P R
f. Material take off / data sheets Owner Spec.& API Spec 5L Data sheets Owner Spec.& API Spec 5L N/A P R

- Operation and maintenance procedure Owner Spec.& SNI-13-3474 Operation & maintenance procedure Owner Spec.& SNI-13-3474 N/A P R
INSPECTION AND TEST PLAN
ON-SHORE PIPELINE CERTIFICATION
Project : TRUNKLINE 6" FROM MT-L-8385 M.8 STATION TO MT-R-6205 M.6 STATION
Owner : PT. PERTAMINA HULU SANGA SANGA
User : PT.PUTRA TUNGGAL MANDIRITMA
Location : PHSS KALTIM
3rd Party Insp. : Migas Letter assignment R : Review SW : Spot Witness
No. : - S : Surveillance / Inspection V : Verify
Project Ref. : Tgl. : - W : Witness Inspection H : Hold point
Project Duration : P : Perform & Provide N/A : Not Applicable

Surveillance Inspection
Reference Acceptance 3rd Party
No Activity
Document Documents required Criteria PTM PHSS Insp. Comp. MIGAS

2 Site Inspection & Verification


- On-shore Installation Preparation
a. Pre-installation survey Owner Spec.& SNI-13-3474 Inspection report, check list Owner Spec.& SNI-13-3474 P S N/A
b. Extent of preparation for crossings Owner Spec.& API 1102 Inspection report, check list Owner Spec.& API 1102 P S N/A

- Pipeline Installation
a. Pipeline material inspection & tracebility Owner Spec.& API Spec 5L Material / Mill certificate Owner Spec.& API Spec 5L P W R
b. Pipeline route and ROW survey Owner Spec.& 300K Survey report Owner Spec.& 300K P R&S R&S
c. Repairs of damage to external & internal coat Owner Spec.& NACE Repair procedure, inspection report Owner Spec.& NACE P R & SW R&S
d. Welding inspection (incl. Electrode & fit-up) ASME IX / API 1104 Inspection report, check list ASME IX / API 1104 P R & SW R & SW
e. Non Destructive Testing process ASME V / API 1104 NDT procedure, NDT record ASME V / API 1104 SW R & SW R & SW
f. Excavation, welding and NDT of repairs Owner Spec.& SNI-13-3474 Procedure, Inspection report Owner Spec.& SNI-13-3474 H R & SW R & SW
g . Field joints coating / insulation (if any) Owner Spec.& NACE Coating procedure, calibration cert., report Owner Spec.& NACE P R & SW R & SW
h. Pipe lowering activities Owner Spec.& SNI-13-3474 Check list Owner Spec.& SNI-13-3474 P R&S R & SW
i. Tie-in (line-up and fit-up) Owner Spec.& SNI-13-3474 Tie-in procedure / check list Owner Spec.& SNI-13-3474 P R&S R&W
j. Trenching Owner Spec. Trenching report Owner Spec. P R&S R & SW
k. Safety devices and instrument inspection Owner Spec. Inspection report, check list Owner Spec. P R &W R&W

3 Testing and Commissioning


- Pigging and cleaning / Check gauge plate Owner Spec.& SNI-13-3474 Pigging inspection report , check list Owner Spec.& SNI-13-3474 P R&W W
- System pressure testing
a. Water sampling Owner Spec.& SNI-13-3474 Sampling report Owner Spec.& SNI-13-3474 P R V
b. Inhibitors (if applicable) Government Regulation & Catalog product Government Regulation & P R V
Owner Spec.& Appl.code Owner Spec.& Appl.code
c. Water filling Owner Spec.& 84K Check list Owner Spec.& 84K P R&S SW
d. Instrumentation and equipment calibration Owner Spec.& 84K Calibration certificate Owner Spec.& 84K P R&S V&H
e. Pressure Test 84K , Owner Spec & 84K , Owner Spec &
SNI-13-3474 Test procedure and report SNI-13-3474 P R&H H
h. Dewatering and Cleaning 84 K & Owner Spec Test procedure and report 84 K & Owner Spec P R&S R & SW
SNI-13-3474 SNI-13-3474
4 Final Report
- Installation data package / dossier Owner Spec.& SNI-13-3474 QC Inspection report, document dossier Owner Spec.& SNI-13-3474 P R R
- Certificate / Result of inspection 84K QC Inspection report, document dossier 84K N/A N/A P

Note: This ITP has been discussed and approved by all parties concerned during Pre-inspection meeting

Prepared by Review & Approved by , Review & Veryfied by, Ditjen MIGAS
PT.Putra Tunggal Mandiritama PT.Pertamina Hulu Sanga Sanga PJIT

………………………………... ………………………………... ……………………………………………...... ..................................................