ALL EDs/CPMs/GGMs/GMs,
RVNL.
1. In terms of the policy letter under reference, the updation of rates was circulated
vide this office letter #C/Policy/Estimate and BOQ/2011/24 Part III dated
31.10.2018.
2. The exercise for updation of rates of Standard Bill of Quantities of RVNL was taken
up duly taking all contracts above 100 crore accepted by March 2021 and adopting
the standard deviation to improve the degree of accuracy. As a result of this
exercise, the following % age above/below/at pars over SBOQ of Dec 2018 are to
be applicable till the next updated rates are issued. These rates are updated up to
31.03.2021.
2.1. Civil
%age above/below
Bill.
Description of Schedule on the existing
No.
SBOQ rates
1.1 Earthwork in formation 22.52 above
VIKAS 2021.12.18
14:44:17
AWASTHI +05'30' 1
%age above/below
Bill.
Description of Schedule on the existing
No.
SBOQ rates
5B.1 P.Way Linking (Supply and Installation works) 29.84 above
10.2 Other items of work not covered in Bill No. 1 to 9 Site Specific
2.2. S&T
%age above/below
Bill.
Description of Schedule on the existing
No.
SBOQ rates
Group A1 – EI supply items for stations up to 200
11A 8.26 above
routes
Group A2 – EI supply items for stations more than
11A 8.26 above
200 routes
11A Group A3 – Other tha EI supply items 24.86 above
2.3. Electrical
%age above/below
Bill.
Description of Schedule on the existing
No.
SBOQ rates
16 RE/General 7.82 above
VIKAS 2021.12.18 2
14:44:36
AWASTHI +05'30'
%age above/below
Bill.
Description of Schedule on the existing
No.
SBOQ rates
19 OHE /Ferrous other than Steel Structures & SPS 4.53 above
3. This % updation is not applicable for the following items as rates of these items
were analysed or new items were introduced after the last updation of SBOQ.
Applicable dates of rates of these items were different than the SBOQ issued in
2018. Rates of these items are updated up to 31.03.2021 to bring them at par with
other SBOQ items as % updation according to preceding Para shall not be
applicable on them. The rates to be adopted are as under:
Updated Updated
BOQ item BOQ item
SN rate up to SN rate up to
No. No.
31.03.2021 31.03.2021
1. 2059 (a) 1,38,930 23. 5046 A (a) 16,834
2. 2059 (b) 1,54,408 24. 5046 A (b) 20,804
3. 2059 (c) 3,148 25. 5046 A (c ) 25,608
4. 2059 (d) 1,574 26. 5046 A (d) 4,748
5. 2069 366 27. 5046 A (e) 6,074
6. 2070 (a) 1,13,694 28. 5047 32
7. 2070 (b) 98,429 29. 5048 23
8. 2070 (c) 1,36,964 30. 5049 (a) 712
9. 2070 (d) 1,30,678 31. 5049 (b) 884
10. 4001 ( g) 52 32. 5050 27
11. 4001 (h) 107 33. 1002 (a) 236
2021.12.18 3
VIKAS
14:44:55
AWASTHI +05'30'
Updated Updated
BOQ item BOQ item
SN rate up to SN rate up to
No. No.
31.03.2021 31.03.2021
12. 4021 (f) 132 34. 1002 (b) 457
13. 4021 (g) 124 35. 1002 (c) 790
14. 5007 B 811 36. 1002 (d) 1,316
15. 2077 1,62,251 37. 1002 (e) 70
16. 1026 620 38. 2001 (a) 327
17. 5007 A 97 39. 2001 (b) 581
18. 5046 (a) 19,252 40. 2001 (c) 945
19. 5046 (b) 26,233 41. 2001 (d) 1,406
20. 5046 (c ) 32,290 42. 2001 (e) 76
21. 5046 (d) 5,080 43. 2001 (f) 285
22. 5046 (e) 6,405
4. In addition to SBOQ updation, the Item No.3001a from Schedule 3.2 has been
shifted to Schedule 5A.1 as Item No.5001.
5. The rates for site specific and non-scheduled items are to be analysed for each
project separately. On such items SBOQ rates and above updation shall not apply.
6. The item no. 3001(a) of Schedule 3.2 has been shifted to Schedule 5A.1 as item
no. 5001(a).
7. As already informed vide letter No. C/Policy/2007/Pt.II dated 23rd May 2011, in
evaluation of bids, Bid evaluation Committee should also consider comparison of
rates obtained with updated rates circulated yearly in addition to other
comparisons considered necessary by BEC to certify reasonability of rates.
8. The rates of individual items are being updated as above in SBOQ and is being
uploaded in IREPS website.
VIKAS 2021.12.18
14:45:12
AWASTHI +05'30'
ED Planning
Copy to:
i. Secy to CMD- for kind information of CMD please.
ii. DP, DO, DPE & DF- for kind information please.
iii. CVO- for kind information please.
iv. All PEDs- for information please.
v. CEO HSRC- for information please.
vi. AGM/Civil (Expert)- For information and action as per para 6 above.