ABSTRACT
Nigeria has abundant groundwater resources. Some of which have been exploited through
wells and boreholes dug by the Federal, State and Local Governments, private individuals,
other organizations and corporate bodies such as the World Bank, UNDP and UNICEF in the
past four decades under different programs. However, despite the huge amount of money
expended on these projects, many of these boreholes often break down within short period of
usage. During my industrial training experience at Concast Geological Nigeria limited; I had
the opportunity to be practically involved in geophysical data acquisition and its modeling for
groundwater studies. I have also gained experience in bore hole drilling and well completion.
This experience has given me insights into why many borehole programs initiated by the
different governments as well as private individuals and corporate organizations have failed.
Most boreholes fail for many reasons including improper construction and design. For an
survey, an appropriate design criterion, pumping test to know the yield of the hole and
supply in general.
Key
words
Boreholes
Geophysical survey
Drilling
Groundwater
CHAPTER ONE
INTRODUCTION
The Industrial Attachment program fulfils part of the requirement in pursuing the degree of
B.sc Geology in Ahmadu Bello University Zaria. This report serves to summarize the activities
and experience gained with concast Geophysical Nigeria Limited lafia Nasarawa State.
The Government’s decree No. 47 of 8th Oct; 1971 as amended in 1990, highlighted the capacity
building of human resources in industry, commerce and Government through training and re-
training of workers in order to effectively provide the much needed high quality, goods and
services in a dynamic economy as ours (Jemerigbo, 2003). This decree led to the establishment
The governing concern among our industrialists that graduates of our institutions of higher
learning lack adequate practical background studies preparatory for employment in industries
led to the formation of the Students’ Industrial Work Experience Scheme (SIWES) by ITF in
1993/1994 (Information And Guideline For SIWES,2002). ITF has one of its key functions; to
work as cooperative entity with industry and commerce where students in institutions of higher
learning can undertake mid-career work experience attachment in industries which are
The student Industrial Work Experience Scheme (SIWES) is a skill training program designed
Sciences and Pure and Applied Sciences for the industrial work situation which they are likely
to meet after graduation. Duration of SIWES is four months in Polytechnics at the end of
National Diploma(ND), four months in Colleges of education at the end of National Certificate
Exams (NCE II) and six months in the universities at the end of 300/400/500 levels depending
ii. To prepare students for the industrial work situation which they are likely to meet after
graduation.
iii. To expose students to work methods and techniques in handling equipment and
iv. To provide students with the opportunity of applying their knowledge in real work
v. Enlist and strengthen employers’ involvement in the entire educational process and
prepare students for employment in industry and commerce (Information and Guideline
The bodies involved are the Federal Government, Industrial Trust Fund (ITF). Other
supervising agencies are National University Commission (NUC), National Board of Technical
iv. Supervise students at their places of attachment and sign their log books and ITF
forms.
v. Vet and process students’ log books and forward same to ITF Area office.
Therefore, the success or otherwise of SIWES depends on the efficiency of the ministries,
ITF, institutions, employers of labor and the general public involved in the articulation and
meeting up with the needs for the establishment of the program is necessary. (Information
Attached to Concast Geologisical Nigeria Limited Opp. Aisha Sandaji Plaza,Lafia Nasarawa
State.
Following the need to solve the problem of water scarcity in Africa as part of the millennium
development goals (MDG), this company, CONCAST GEOLOGICAL Nig. Ltd was registered
in February, 2005 as the initiative of one man, Mr AHMED KANA, (a renowned Hydro
Geophysicists and Water Engineers engaged in water well and dam construction, foundation
engineering and mineral exploration business in various parts of the State. Currently, it has
permanent staff strength often. Other workers are casual and are usually sourced from the
is equipped with the latest computer softwares for interpretation and modeling. The company
has recently undertaken specialized projects related to water supply especially in the following
areas:
i. Geophysical surveys to determine suitable sites for borehole drilling in all states in
Nigeria.
Organizational
chart
MD/CEO
Consultant
General Manager
Drivers
Assg.Hydrogeologist/IT
Receptionist
Students
Chief
Driller
Driller
1
Assg.Driller
2
Helpers/Laborers
This chapter explains the purpose of the report. It also describes briefly the history and
objectives of SIWES. It goes further to describe the brief history of establishment of the
This chapter discusses the training which I received, such as in geophysical survey and drilling.
Chapter Three: This chapter talks about the experience gained by me and problems
encountered.
This chapter gives the summary of all other experience gained and skills acquired, overall
a) Geophysical Survey
b) Borehole Drilling
c) Pump Installation
d) Well Logging
f) Pumping Test
g) Borehole Rehabilitation
I participated actively in Geophysical Survey, drilling, logging and Pump Installation. And
water for consumption and other domestic significants. Therefore, before any borehole
construction is done, a geophysical survey should be carried out on the site to know the most
suitable point and depth where the borehole should be drilled in order to have maximum ground
water potential. Hence, a geophysical survey tells whether a proposed borehole site should be
approved or abandoned.
Geophysical techniques are non-invasive technologies that measure the variations in the
physical characteristics of the surface and subsurface geology either NATURAL OR
ARTIFICIAL generated within the earth crust. Such variation result from differences in
physical characteristic such as density, elasticity, magnetism, and electric resistivity etc.
2.3.1: METHODOLOGY
In an attempt to identify a suitable site for the drilling and construction of a productive
There are various methods used in conducting Geophysical survey. These include: Electrical
survey method that can be applied in groundwater investigation, in special situations include
gravity method, induced polarization (IP), Self Potential (SP), Out of the afore-mentioned
methods, the Electrical Resistivity method is mostly employed by this company and is the
four electrodes consisting of two inner potential electrodes (P1 (M) and P2 (N)) and two outer
current electrodes (C1, (A) and C2, (B)) which are arranged linearly about a central point. The
electrodes are driven into the earth using hammers so that they go dip down into the ground,
about three-quarters dip to ensure that they make full contact with the earth.
The resistivity method comprises the vertical electrical sounding (VES) and the horizontal
profiling (HP). In VES, we are concerned with measuring the variations in the physical
characteristics of the sub-surface as we go down the earth while for HP; we are interested in
the lateral variations in the physical characteristics of a particular layer of the earth.
Two electrode arrangement or arrays are of particular interest in resistivity surveys.
The
Wenner
array
comprises
four
equally
spaced
electrodes
and
is
characterized
simply
electrode
spacing
‘a’.
The
Schlumberger
array
is
similar
except
that
the
inner
(potential)
electrodes
are
more
closely
spaced.
I was particularly introduced to VES during my period of SIWES which involved the use
In the VES, with the electrodes linearly arranged, direct current is sent into the ground between
the various pairs of electrodes and the resistance offered is calculated and displayed by the
R is the resistance.
The resistance reading is then multiplied by a geometric factor which is a function of the
R is the resistance.
Where 𝜋 = 3.142, AB is the distance between the current electrodes, while MN is the distance
The electrode spacing is progressively increased, keeping the central point of the array fixed
until the desired length of array is obtained. This will increase the depth of penetration within
the separation AB. The best general guide to use in the field is to plot the apparent resistivity
curve as the survey progresses, so that it can be judged whether the asymptotic phase of the
curve has been reached. Thus, the varying resistivity measured when the electrode array is
varied in an in-homogenous medium, such as the earth is termed as apparent resistivity (pa).
The apparent resistivity readings are collected for a given site and afterwards, a geo-electric
section (GES) of the resistivity profile is constructed with advanced computer modeling
software and interpreted to reveal subsurface features of interest. VES is often done between
Resistivity VES data can be interpreted quantitatively (i.e. manually) by examining the curve
shapes or qualitatively by using curve matching or computer modeling. VES data curves are
interpreted by plotting apparent resistivity data against electrode spacing on a Log-Log graph
scale.
VES results were initially obtained by curve matching with Standard Master Curves and their
auxiliaries from Orellana and Mooney. These were improved upon using : GEWin-Excel version
T.21 2008 and interpreted results are presented as field and digitized curves.
Geophysical survey aims at the features that will aid the accumulation of ground water. The
structural features such as the extent and volume of fissures or joints, together with the
thickness of the weathering. This investigation also consists of geological reconnaissance and
hydro-geological assessment such as, the rock types in the area, relief, well depth, vegetation,
Vertical electrical sounding VES presents the various layers of lithologies obtained in a survey
b) Clay
e) Fractured basement
g) Fresh basement.
It is worthy of knowing that the area to be investigated will have much ground water potential
depending on the thickness of overburden, weathered basement sandy, fractured basement and
Although it is not possible to identify the rocks or soil of an area on the basis of its resistivity
alone, it may be possible to make certain deductions about the geology of the area on the basis
of a resistivity survey, interpreted along with other information such as a fore-knowledge about
the hydrogeology of the area. For example, since water is a good conductor, a formation with
trapped in isolated pores and a formation with extremely low resistivity may well be an aquifer
since its conductivity would be high. These conclusions are drawn from the fact that
./
𝑅 = …………………………………. (iv)
$
The best target for drilling is a formation with moderately low resistivity.
NASARAWA STATE.
The survey area falls within the Precambrian Basement Complex of the North Central Nigerian.
The surveyed site is located at a farm, off Keffi-Nasarawa road, Marmara, Nasarawa LGA,
Nasarawa State. The survey was conducted on a larger part of the farm.
The geophysical investigation made use of the resistivity method comprising of the vertical
electrical sounding VES using OMEGA-GEOPULSE digital resistivity meter. This was done to
provide information concerning the subsurface geology. Terameter SAS 300C was used to
carry out the investigation. The Schlumberger configuration was adopted with maximum half-
current electrode spread (AB/2) between 1 and 100m while the half-potential electrode
separation (MN/2) was maintained between 0.5 and 2.5 m. Plate 1.0 and 1.1 show how the
Electrodes 20/10/2015
Apparent Resistivity values calculated from field resistance readings by multiplying the Di-
electric constant (K). The product Ohm-m was then used as against the current distance
spreading (AB/2), to generate a curve on a log-log graph paper.
The interpretation is finally confirmed by using computer interpretation software: GEW in-
Excel version T.21 2008. The software is able to produce modeled curves and interpreted geo-
electric layer. (Fig 2.1 (a &b)).
distance resistivity
in m in Ohm m
1 701.3
1.47 408.1
2.15 282
3.16 168.8
4.64 116
6.81 114.5
10 125.4
14.7 142.4
21.5 86.9
31.6 125.4
46.4 256.3
68.1 293.7
100 188.4
120 338.9
140 230.7
a
10000
1000
resistivity in Ohm.m
100
10
1
1 10 100 1000
bottom of
layer Resistivity
in m-SL in Ohm m
15.00 140
21.00 90
46.00 255
100.00 190
120.00 340
140.00 230
b
10000
1000
resistivity in Ohm.m
100
10
1
1 10 100 1000
the area is delineated for electrical resistivity survey after extensive Electromagnetic
survey across the farm. VES was taken to between 120- 150m. The relatively low
resistivity values and anomalies indicate occurrence of fractures and consequently high
groundwater potential. The boreholes should be drilled at the VES points indicated to
a depth of about 100-120m or until satisfactory recharge is gotten. Use of down-the-
hole hammer would be required. To avoid missing of crucial aquifer especially water
bearing litho logical units/fracture bearing zones, proper litho-logging is recommended
after drilling and the aquifer should be adequately screened to achieve maximum yield.
Summary of the interpretation
During my period of the attachment, a number of boreholes were drilled while few were
rehabilitated. Most of the boreholes whose drilling I experienced are in Lafia LGA Nasarawa
State.
d) A water tanker.
e) Drilling bit
f) A service truck.
In borehole design, it is helpful to consider the borehole structure as consisting of two main
elements.
The case portion of the borehole also known as the blind portion, is the part of the borehole
that seals surface water and undesirable groundwater as well as provide structural support
The intake portion of the bore hole or the screen portion are perforated casings which allow
maximum amount of water to enter the well and prevent movement of sand into hole as well
There are two types of casing; these are American Petroleum Industry (API) steel and Polyvinyl
chloride (PVC) casings. The length of API steel casing is about 20 ft (or 6 m), while that of
PVC casing is often times 10 ft (or 3m). The thickness of these two types of casing varies
between 6 and 8 mm. The PVC casings are mostly used by this company.
Plate1.2: A typical borehole design
This involves conveying the drilling rig and every other equipment to be used for drilling to
This involves setting the rig at the exact spot where the geophysical survey had recommended
and also ensuring the rig is plumed so as to ensure that the hole is straight and vertical.
iii) Construction of the Mud Pit (in the case of Rotary Mud Drilling).
This involves the digging of two pits; one in which cutting materials settle (Storage pit) and
the other from which water is pumped and re-pumped to the hole through the drilling rig
(Suction pit).
A large variety of methods and equipment are available for excavating holes in the earth. The
technique used in a particular situation in the field depends on a number of factors including
availability of equipment and majorly, the mode of occurrence of ground water in the area.
The method of drilling which was employed during my period of attachment was the rotary
The rotary drilling method is one of the fastest methods of drilling wells and is particularly
adapted in the drilling of large size holes. The drilling process involves boring a hole by using
a rotating bit to which a downward force is applied. I was exposed to two types of rotary drilling
b) Rotary-air drilling
In rotary-mud drilling, the first activity usually carried out is digging of the storage and suction
pit which are together referred to as the mud pit. Afterwards, drilling is commenced using
drilling fluids. Cuttings of rocks are achieved by rotary bits of various types. The power is
delivered to the rotary bits by a rotary halo-steel tube or drilling pipe attached to the drilling
rig. Pre-mixed mud is forced down the drill pipe and out of the bits. The cuttings are removed
by continuous circulation of the drill fluid (mud) as the bits penetrate the formation.
The role of the mud is to minimize fluid loss into the aquifers and to cool the drilling bits during
the drilling process; it also carries the rock cuttings upward and then deposits them in the mud
pit. The storage and suction pits are dug in such a way that the fluid from the former overflows
into the latter from where it is then pumped back through the drill pipe and the circle is repeated
(See Plate 2.6). The heavy cuttings settle in the storage pit while the tiny ones flow into the
suction pit. This kind of drilling takes place where the overburden is thick, to do away with the
(Carboxylmethylcellulose) (CMC).
Fig 1.3 Mud Drilling method
Plate 1.4: The Mud Pit snapped on 11/08/2015
The air rotary drilling method was used in Nasarawa Eggon site. Air drilling was used because
the overburden was not too thick and also because it was stable.
The rotary operation using air is similar to the mud or water technique, except that the
circulating fluid (air) is not re-circulated. When the cuttings are carried to the surface, they are
The rotary-air drilling method used at Nasarawa Eggon was used with compressed air as the
drilling fluid rather than drilling mud which represents a modern development within the water
well industries.
Air was circulated through the drill pipe out through the pores in the drill bits and upward in
the annular space around the drill pipe. Air moving at high velocity in the annular space carried
the cuttings to the surface. This process continued until the required depth was reached. Air
drilling offers a number of advantages over water or mud method of rotary drilling.
a. Removal of cuttings from the face of the bits is often faster resulting in less regrinding or
b. Water that enters the hole from the formation being penetrated is almost immediately flushed
to the surface and is easy to see. Hence, it is easier to determine when a good aquifer is
encountered.
During the drilling process, required data should be collected as accurate as possible.
The following items are used in the collection of samples at drilling sites:
iv) Sufficient copies of the form to record drilling and penetration rate, particle size
a) Slower penetration rates were observed in hard consolidated rocks than loose sand.
b) Clay or shale layers tend to slow down penetration where the bits tooth is not suited.
c) A slowing down of penetration in the basement zone was observed as the fresh rock
was approached.
d) The lower part of the weathered zone consists essentially of blocks of decomposed
rocks set in a matrix of weathered products. Typical rates in a weathered zone are
between 1-10 minutes. But in the lower parts, are as slow as 15-20 minutes.
e) Once down the hole hammer is used, penetration is very fast between 1-10 minutes
per range.
f) A good indication that fresh basement rock has been reached was jerky rotation of
However, an accurate penetration log is very helpful in the identification of drilled strata, so
well logging also known as borehole logging is the practice of making a detailed record of
geology formation penetrated by a borehole. The log may be based either on visual inspection
of samples brought to surface or on physical measurements made by instruments lowered into
the hole (geophysical logs). Well logging is performed in borehole drilled for the oil and gas,
ground water, mineral and geothermal exploration. In Concast Geological Nigeria Limited, we
normally used well logging in borehole drilled for ground water to determine the position of
aquifer.
The samples are collected in a plastic container, sieved, washed, and then analyzed
before being put in the sample box. Samples are usually collected after every meter of drilling,
so that on sitting the sample box (Plate 1.5) one can quickly tell to what depth a hole has been
drilled.
Bottom of hole
This is the next stage after drilling a borehole. It involves flushing, casing, gravel packing and
grouting.
a) Flushing: This is the process of flushing out after completion of borehole. Flushing is
done to remove dirty water which has been contaminated during drilling. When using
the compressor to flush, after inserting permanent casing and gravel parking, you can
either slot in your flush horse or you send the drill pipe again and the compressor supply
compress air bringing out the water in the hole.
both screens and blinds into the borehole in accordance with the borehole design. The
blinds are usually cylindrical materials with both ends open and prevent dirty particles
The screens are also cylindrical materials but perforated. They are often placed in the
hole where the aquifer is so that ground water can filter through it to the hole.
The borehole is flushed again before gravel packing/sand packing. This is done to make the
hole clean.
c) Gravel/Sand Packing: This involves placing of coarse sand or fine gravel chippings in-
between the wall and the casing of the borehole. The boreholes are gravel packed to;
c) Grouting: It is important to note that the gravels should not be placed to within 3-6 m
to the surface as this space is for grouting. Grouting involves the mixing of cement,
gravels, sand and water to fill the space after gravel packing. This was done to avoid
the percolation of surface water that may pollute or contaminate the borehole.
This is the final stage in the construction and completion of a borehole. It involves the removal
of finer materials in the aquifer. This process also increases permeability and porosity of the
aquifer in the immediate area of the borehole. In mud-drilled holes, the aquifer formation is
invaded by the mud around the periphery of the hole and a mud cake is formed on the walls of
the hole. Development is needed to remove this mud and violently agitate the gravel packing
materials behind the screened section to remove fines and form a stable permeable filter.
The following are borehole development methods;
a) Pump installation: For pump installation a list of items are required; Pipe centralizer,
Rise main pipe, Pump rods and Nylon ropes etc. Basically we have two types of pump
installations;
• Manual hand pump installation. and,
• Motorized pump installation.
b) Flushing: This is one of the final stages of the borehole development. It involves the
flushing of the hole with a submersible pump to get the hole cleaned there by making
the water clear. This is normally done if the hole is not clean after back washing.
c) Capping and grouting: This involves covering the borehole with a fabricated
material, to prevent dirt particles from entering the borehole and also to prevent little
children around the hole from falling into the hole. This material often covers the
CHAPTER THREE
The period of my SIWES really exposed me to practical aspects of some of the theories I learnt
in school. For example, the importance of resistivity, conductivity and ohm’s law in
geophysical survey, which is very important tool in the exploration of ground water.
i) Geophysical Survey.
I can confidently carryout the geophysical survey data acquisition process which involves the
connection of the terrameter to the potential and current electrodes, laying out the electrodes,
taking the terrameter readings of various distances from the central point and plotting VES
curves of the data collected from the geophysical survey carried out on site on a log-log graph
manually. Also, I have gained experience on how rotary-mud and rotary-air drillings are carried
out. I have also acquired skills on how to install and un-install a submersible pump into a
borehole during pumping test, measure SWL and DWL of a bore hole as well as its pumping
Problems encountered include those in geophysical survey, drilling and pumping test.
i) Wrong Interpretation of Data: When there was wrong interpretation of data, the required
depth for drilling was missed and this could lead to the hole not being productive.
ii) High Tension Cable: A survey conducted under high tension cables had errors in its reading
iii) Error One, Two and Twelve: Error one occurred when the current electrodes made partial
contact with the terrameter and is often displayed ‘Error one’ on the terrameter. Error two
normally occurred when there was partial contact in the connection between the terrameter and
the electrodes or the ground and is normally displayed ‘Error two’ on the terrameter. Error
twelve occurred when the battery was not well-charged i.e., its voltage was less than 12 volts.
In such a case, the battery was charged so that the voltage was greater than or equal to 12 volts.
During the process of drilling, some technical problems were encountered. Below are the
Correction:
i) Up hole velocity of the drilling fluid was increased to force the cuttings out of
the hole.
ii) The viscosity of the drilling fluid was also increased by adding bentonite.
a) Stuck pipe.
Correction:
i) The drill string was suspended above the bottom of the hole.
ii) Circulation of the drilling fluid was ensured until the hole became relatively free of
a) Blocked pump: There were instances where the submersible pump used in the
Correction:
The pump was uninstalled, loosened and blown with air pressure to force the particles
out.
b) Intertwining of the dip meter cable on the riser pipes. In such cases, the accurate
depth of water level was not obtained from the dip meter.
Correction:
The dip meter was withdrawn from the hole and released back into the hole in such a
CHAPTER FOUR
My training period really equipped me with more knowledge and skills in the area of
maintenance and pumping test. Also, the training has improved my ability in interacting with
other people such as peers and superiors. It was fun to deal with these people, especially when
I judge my SIWES period spent at Concast Geological Nigerian Limited, as being one of the
4.2: CONCLUSION
Concast Geological Nig. Ltd. is a ground water investigation and exploitation company. My
SIWES period in this company was very interesting, instructive and challenging. The training
has helped me to bridge the gap between theory and practice in the aspect of geophysics,
hydrogeology, and engineering which are employed to hardness ground water for the optimal
utilization of man.
All of this valuable experience and knowledge that I have gained were not only acquired
through the direct involvement in task given but also through other aspects of the training such
as work observation, interaction with colleagues, superiors and other people related to the field.
From what I have undergone, I am very sure that the industrial training program has achieved
its primary objectives. It’s also the best way to prepare students for the real working life.
From the foregoing discussion it can be seen that there is a connection between geophysics,
hydrogeology and engineering. It is also apparent that the role of a geophysicist in the ground
For a good borehole to be constructed in order to cater for the need of water supply in any
environment there is need to carryout a detailed geophysical survey in order to avoid the waste
All clients wanting to construct a good borehole should consult a specialist to carry out detailed
subsurface investigation before drilling may commence. And the report of the geophysical
Sophisticated machines such as drilling rigs and compressors of modern technology like those
used abroad should be employed in the exploration and exploitation of ground water.
To improve the general standard of SIWES attachment to Nigerian students, I will wish to
recommend that;
a) ITF should do well by the payment of a befitting student allowance during the SIWES
period and not after, to enable them cover transportation and feeding expenses during
unpublished.
Martin, E., Emelis E. (2011): MevHydrosearch and Engineering Services Ltd Office Profile,
unpublished.
Martin, E., Timothy O. O., Hassan A., Bilkisu H. (2011): Training on Water Well Drilling.
Philip, K. (2001): The New Penguine Dictionary of Geology, 2nd Edition. Pearson Education
Ltd.
Todd, D. K. (1980): Ground Water Hydrology. John Wiley and Sons Inc., New York.Pp.336.
Whiteman, W. E. Jalinoos, F., Sirles, P., and Henna, K. (2003) “Application of Geophysical
September 2003.