The document is a bidding document from Power Grid Company of Bangladesh for the design, supply, erection, testing and commissioning of a new 400/132kV substation in Gopalganj on a turnkey basis. It includes the scope of work for developing a new air insulated switchgear substation along with associated control systems, automation, buildings and infrastructure. Key elements include 400kV and 132kV switchyards, 3 transformers, control and protection systems, fiber optic communication, auxiliary systems, civil works for buildings and foundations, fire protection, and integration with the existing load dispatch center. The document also specifies requirements for mandatory spares, erection equipment and testing.

Uploaded by

EK
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
146 views147 pages

Volume 3

The document is a bidding document from Power Grid Company of Bangladesh for the design, supply, erection, testing and commissioning of a new 400/132kV substation in Gopalganj on a turnkey basis. It includes the scope of work for developing a new air insulated switchgear substation along with associated control systems, automation, buildings and infrastructure. Key elements include 400kV and 132kV switchyards, 3 transformers, control and protection systems, fiber optic communication, auxiliary systems, civil works for buildings and foundations, fire protection, and integration with the existing load dispatch center. The document also specifies requirements for mandatory spares, erection equipment and testing.

Uploaded by

EK
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 147

POWER GRID COMPANY OF BANGLADESH LIMITED

BIDDING DOCUMENT

FOR

DESIGN, SUPPLY, ERECTION, TESTING & COMMISSIONING OF 400/132KV


SUBSTATION AT GOPALGANJ ON TRUNKEY BASIS

PGCB/ADB/400kV/GOPAL-SS

VOLUME 3 OF 3

BID FORMS, PRICES AND SCHEDULE


POWER GRID COMPANY OF BANGLADESH LIMITED
BIDDING DOCUMENT
FOR
DESIGN, SUPPLY, ERECTION, TESTING & COMMISSIONING OF 400/132KV
SUBSTATION AT GOPALGANJ ON TRUNKEY BASIS

PGCB/ADB/400kV/GOPAL-SS

INDEX TO VOLUMES

VOLUME 3 of 3

Bid Forms, Prices and Schedule


Schedule A Introduction & Preamble to the Price & Technical Schedules
Schedule B Bid Prices
Schedule C Bar Chart Programme of Key Activities
Schedule D Manufacturers, Places of Manufacture and Testing
Schedule E Technical Particulars and Guarantees
Schedule F Departure from Specifications
Schedule G Proposed Alternative Standards to which Equipment shall Provided
Schedule H Proposed Contract and Site Organization
Schedule I Drawings and Documents to be Submitted with Bid
Schedule J Proposed Subcontractors
Schedule K Co-efficient and indices for Price Adjustment
POWER GRID COMPANY OF BANGLADESH LIMITED

BIDDING DOCUMENT

FOR
DESIGN, SUPPLY, ERECTION, TESTING & COMMISSIONING OF
400/132 kV AIR INSULATED SWITCHGEAR (AIS) SUBSTATION
AT GOPALGANJ ON TURNKEY BASIS

SCHEDULE A

INTRODUCTION & PREAMBLE TO THE PRICE & TECHNICAL SCHEDULES

BRIEF DESCRIPTION OF THE WORKS

The bidder shall be deemed to have visited site, inspected, gathered data and verified details of the as-built
system in order to design, supply and interface their new equipment. All necessary materials, adjustments,
dismantling, remedial and tiding-up work in order to complete the work specified shall be included in the
contract price. The contractor is responsible for ensuring that all and/or and any item(s) of work
required for the safe, efficient and satisfactory completion and functioning of the works, are included
in the Bid Price whether they be described in the specification or not.

The scope of work comprises the following: -

DESCRIPTION OF WORKS

1. Gopalganj 400/132kV AIS Substation

The scope of work under this turnkey Bid is design, supply, delivery, installation, testing &
commissioning of a new Air Insulated Switchgear (AIS) substation. The configuration of the 400kV
busbar shall be 1 and ½ busbar scheme and the 132kV busbar shall be double Busbar (back-to-
back U type) scheme.

The scope of work also includes associated control, protection, fiber optic multiplexer equipment
for communication & protection, substation automation, digital fault & disturbance recorder
(DFDR), station power facilities, including towers and gantry structures, two storied Main Control
Building, two (2) 400kV Switchyard Panel Rooms (SPR) and one (1) 132kV SPRs to
accommodate protection and control IED and associated equipment, local control kiosks, 33kV
tertiary equipment, cable trenches, water supply & sewerage, fences, access road & internal
roads, security guard stations, and all other necessary substation facilities and supply of
mandatory spare parts and maintenance & special tools.

Schedule-A Page 1 of 53
The scope of works shall also include four (4) Three-Phase Shunt Reactors with its size for each
line and associated air-insulated switchgears including all necessary works and services if the
EMTP study result confirms the shunt reactors are necessary. The details of EMTP study that
shall be performed by the Contractor is specified in section 16, Volume 2 of 3 of the Bidding
Documents.

The scope of work may also include the insulation co-ordination based on EMTP study with surge
arrestors, Point-on-Wave device, and PIRs for each busbar and associated air-insulated
switchgears. The scope of works includes all necessary works and services if the EMTP study
result confirms surge arresters, Point-on-Wave, and PIR are necessary to mitigate surges to
transmission lines, busbars, and transformers.

400kV Air Insulated Switchgears (AIS)

New 400kV AIS switchyard for six 400kV line bays to connect three 400kV double circuit
overhead line (Payra-1 & 2, Rampal 1 & 2 and Aminbazar 1 & 2); Four shunt Reactor for Payra-1
& 2, Rampal 1 & 2 line (based on EMTP study); three 400kV transformer bays for three sets of
400/132/33kV, 250/325MVA, three phase 3 phase transformers; space shall be kept for future
extension of six 400kV overhead line bays, one 400/132/33 kV transformer bay and four
400/230/33kV transformer bay.

230kV Air Insulated Switchgears (AIS)

Only Space shall be kept for future 230kV switchyard and 400/230kV Transformer.

132kV Air Insulated Switchgears (AIS)

New 132kV AIS switchyard for Eight 132kV line bays including Line in-out of existing Gopalganj
(old)-Madaripur and Madaripur-Faridpur 132kV double circuit overhead line (Madaripur -1,2,3 & 4
and Faridpur-1 & 2, Gopalganj old-1 & 2); three 132kV transformer bays for LV side of three
400/132/33kV transformer; one 132kV bus-coupler bay; space for future extension of four
overhead/underground 132kV line bays and one 132kV transformer bays for LV side of
400/132/33kV transformer.

33kV Air Insulated Switches and Connection

New 33kV AIS switchyard and switches for station power service facilities;
- 400/132/33kV tertiary side switchyard and connection

Tertiary side connection between 33kV terminal to switches including necessary fittings,
structures and conductors for #3 400/132/33kV transformer bank.

Tertiary side connection between 33kV terminal to switches including necessary fittings,
structures, conductors and XLPE for #2 400/132/33kV transformer bank.

Schedule-A Page 2 of 53
400/132/33kV three phase 3 phase transformer

Three 250/325MVA, 400/132/33kV three phase 3 phase transformers, and space for future
extension of one 250/325MVA, 400/132/33kV three phase 3 phase transformer.

33/0.415kV earthing/auxiliary transformer

Two 33/0.415kV, 500kVA, outdoor type earthing/auxiliary transformers with no neutral earthing
resisters to supply the substation auxiliary loads. The auxiliary transformer shall be connected to
tertiary side of two new 400/132/33kV three phase 3 phase transformers.

Control, Protection, Substation Automation, Metering & DFDR

Associated local & Remote control panel, metering panel, protection equipment, synchronizing
scheme and substation automation system (SAS) & DFDR for complete substation. Monitoring of
status of Bus PT & Bus ES need to be included in the SAS. Necessary works to be performed so
that Air temperature in the SPRs can be controlled and monitored through SAS.

Fibre Optic Multiplexer Equipment for Communication and Protection

Indoor type Fibre Optic Multiplexer and digital PABX Equipment for protection & communication.

DC and LVAC System

Complete set of DC and LVAC system with all necessary materials required for the plant being
installed with 25% spares for future use of 110V DC battery & battery charger, 48 V DC battery &
battery charger, DC distribution board and LVAC distribution board.

Civil Works, Building and Foundation

Complete design, supply and construction of all civil items required for the outdoor works suitable
for switchyard gantry & equipment foundations, transformer foundations, blast walls, oil pit;
approach, entrance & internal roads; cable trenches, septic tank, surfacing, drainage, fences,
guard house, including earthing & lightning protection, switchyard lighting, etc.

Complete design, supply and construction of all civil items including all necessary architecture &
structural requirements; cable trays, fittings and flooring & finishes; air-conditioning and lighting for
a new two storied Main Control Room Building, two new one storied local control houses in 400kV
switchyard and one new one storied local control house in 132kV switchyard.

Note that, land filling & construction of security boundary wall are out of scope of this
turnkey bid.

Schedule-A Page 3 of 53
Complete design, supply and construction of fire-fighting system for transformers including water
pipe network and reservoir at normal pressure.

SCADA system for Telecontrol and Telemetering

Complete design, supply, delivery, installation, testing & commissioning of hardware and software
to provide the telecontrol & telemetering facilities required at the existing National Load Dispatch
Center (NLDC) at Rampura for integration of complete new 400/132kV substation. All required
electrical signals shall be transmitted to the NLDC through the Industrial Gateway of the
substation automation system. All HV breakers, motorized disconnectors, tap changer, etc. shall
be controlled form NLDC through the Gateway of the substation automation system using IEC
60870-5-101 protocol. All necessary modification works in the software of master station of NLDC
are to be carried out.

Mandatory Spares, Erection & Test Equipment

Supply of complete mandatory spare and spare parts of transformer, switchgear, control
equipment, protection relays, meters, erection & test equipment. Test equipment is to be supplied
from Europe, USA, Japan or equivalent origin. Printed catalogue, operation and service manual
are to be provided. The materials shall have to be handed over to the designated store as per
instruction of the Engineer.

Works and Equipment for Shunt Reactor Installation

Four 400kV three Phase Shunt Reactor ONAN (Size: 20MVAR or 25MVAR or 30MVAR or
35MVAR as per the EMTP study to be done by the Contractor) and associated switchgears
including all necessary works and services as specified in Section 16, Volume 2 of 3 of the
Bidding Document.

2. Training and Inspection:

The Contract Price shall include all costs of training & inspection of Employers and the instruction
of staff on site for the following:

(a) International Training: The following engineers nominated by the Employer shall be provided
with training at specialist manufacturer's works as follows:

SL Description No. of Duration


Engineer (Week)
1. Control, protection & SAS 02 02
2. HV AIS Substation & Equipment Design & Testing 03 03
3. Operation and maintenance of HV AIS substation 04 02
equipment

Schedule-A Page 4 of 53
(b) International Witnessing: The following engineers nominated by the Employer shall participate
in the inspection and witnessing of factory acceptance tests at manufacturers' works as follows:

SL Description No. of Duration


Engineer (Working Days)
1. Transformers 02 10
2. Circuit Breaker 02 05
3. Shunt Reactor 02 07
4. Disconnector 02 05
5. Instrument Transformer ( 1 for CT & 02 05
1 for PT)
6. Lightning Arrester 02 05
7. Control, protection & SAS 02 05
8. DC system 01 03

(c) Local Training: On-site instruction by the manufacturer’s engineer on operations and
maintenance of the (i) HV switchgears & transformers (ii) protection & Substation automation
system (iii) fiber optic multiplexer & digital PABX for a period of two (2) weeks and for fifteen (15)
PGCB engineers in each program.

The Contractor shall be responsible for bearing all costs for the trainees (for item (a)+(b)),
including air fares, accommodation, meal, healthcare, transportation, visa fees etc. together with
payment of a daily allowance of US$ 80 for each of the Employer's trainee. The Employer's
engineer attending the Pre-shipment inspection (as mentioned in item no.-C) shall be provided
with the same facilities except the payment of daily allowance which is to be US$ 100.

Note: The Contractor shall have to submit the Schedule of each Training & FAT and taken
approval from the Employer prior to each Training & FAT. The International training shall
have to be arranged within one (1) year from the date of contract signing.

Schedule-A Page 5 of 53
SCHEDULE A

REQUIREMENTS

Section-I Gopalganj 400/132kV AIS Substation

The equipment to be designed, supplied, installed, tested & commissioned as stipulated in


bid specification and shown in bid drawings (volume 2 of 3):

Item Description

1A 420 kV Air Insulated Switchgear (AIS)

The 420kV AIS shall comply with the particular requirements as detailed in the Schedule of
Technical Requirements included as Appendix A1 to this section and shall comprise the
following:-

1A1 Six (6) sets of 420kV, 4000A, 50kA/1sec, 50Hz, 1425kVp BIL, live tank type, gang operated,
SF6 gas circuit breakers with spring-stored energy operating mechanism. CSD (Control
Switching Device) is required for line, shunt reactor & transformer switching which shall
have to be considered for 400kV circuit breaker.

1A2 Eight (8) sets of 420kV, 4000A, 50kA/1sec, 50Hz, 1425kVp BIL, live tank type, single-pole
operation, SF6 gas circuit breakers with spring-stored energy operating mechanism. PIR
(Pre insertion resistor) is required for line switching which shall have to be considered for
400kV circuit breaker.

[For line switching: Pre insertion resistor (PIR) is also acceptable instead of control switching
device. In this case of line & transformer switching with same breaker (i.e. Mid breaker),
combination of PIR & CSD is required]

1A3 Six (6) sets of 420kV, 4000A, 50kA/1sec, 50Hz, 1425kVp BIL, horizontal double break, post
type, motor operated disconnectors with motor-operated earthing switch.

1A4 Thirty one (31) sets of 420kV, 4000A, 50kA/1sec, 50Hz, 1425kVp BIL, horizontal double
break, post type, motor operated disconnectors without earthing switch.

1A5 Two (2) sets of 420kV, 50kA/1sec, 50Hz, 1425kVp BIL, post type, motor operated busbar
grounding switches.

1A6 Sixty six (66) nos. of single-phase, 6-core, 420kV, 50kA/1sec, 4000/1A, 50Hz, 1425kVp BIL,
post type current transformer.

Schedule-A Page 6 of 53
1A7 Thirty three (33) nos. of single-phase, 3-core, 420kV, 50kA/1sec, 50Hz, 1425kVp BIL,
capacitor type voltage transformers.

1A8 Thirty three (33) nos. of 390kV rated voltage, 303kV(rms) continuous operating voltage at
500c, 10kA nominal discharge current, 50Hz, Heavy duty station class, gapless metal oxide
type, single phase surge arresters.

1A9 Twelve (12) nos. of wave trap (single phase, 420kV, 4000A, 1mH).

1A10 One (1) lot of 420kV post type support insulators required for completing 420kV busbar and
switchgear as specified in the technical specifications and bid drawings.

1A11 One (1) lot of rigid tubular bus [Aluminium of grade 63401 WP], flexible conductors, insulators,
fittings including all necessary clamps and connectors required for completing 420kV busbar
and switchgear connection as specified in the technical specifications and bid drawings.

1A12 One (1) lot of steel structures for gantry and equipment supports required for completing
420kV busbar and switchgear as specified in the technical specifications and bid drawings.

1B 245kV Air Insulated Switchgear (AIS)

Deleted

1C 145kV Air Insulated Switchgear (AIS)

The 145kV AIS shall comply with the particular requirements as detailed in the Schedule of
Technical Requirements included as Appendix A1 to this section and shall comprise the
following:-

1C1 Three (3) sets of 145kV, 1600A, 40kA/1sec, 50Hz, 650kVp BIL, live tank type, gang
operated, SF6 gas circuit breakers with spring-stored energy operating mechanism (for
Transformer bay).

1C2 Eight (8) sets of 145kV, 1250A, 40kA/1sec, 50Hz, 650kVp BIL, live tank type, single-pole
operation, SF6 gas circuit breakers with spring-stored energy operating mechanism (for T/L
bay).

1C3 One (1) set of 145kV, 3000A, 40kA/1sec, 50Hz, 650kVp BIL, live tank type, gang operated,
SF6 gas circuit breakers with spring-stored energy operating mechanism (for bus coupler).

Schedule-A Page 7 of 53
1C4 Nine (9) sets of 145kV, 1600A, 40kA/1sec, 50Hz, 650kVp BIL, double side break, post type,
motor operated disconnectors without earthing switch (for Transformer bay).

1C5 Sixteen (16) sets of 145kV, 1250A, 40kA/1sec, 50Hz, 650kVp BIL, double side break, post
type, motor operated disconnectors without earthing switch (for T/L bay).

1C6 Two (2) sets of 145kV, 3000A, 40kA/1sec, 50Hz, 650kVp BIL, double side break, post type,
motor operated disconnectors without earthing switch (for bus coupler).

1C7 Eight (8) sets of 145kV, 1250A, 40kA/1sec, 50Hz, 650kVp BIL, double side break, post type,
motor operated disconnectors with motor-operated earthing switch (for T/L bay).

1C8 Nine (09) nos. of single-phase, 4-core, 1600/1A, 145kV, 40kA/1sec, 50Hz, 650kVp BIL, post
type current transformer for Transformer bay

1C9 Twenty Four (24) nos. of single-phase, 4-core, 1250/1A, 145kV, 40kA/1sec, 50Hz, 650kVp
BIL, post type current transformer for Line bay

1C10 Six (6) nos. of single-phase, 2-core, 145kV, 3000/1A, 40kA/1sec, 50Hz, 650kVp BIL, post
type current transformer for bus coupler bay.

1C11 Thirty Nine (39) nos. of single-phase, 3-core, 145kV, 40kA/1sec, 50Hz, 650kVp BIL,
capacitor type voltage transformers.

1C12 Thirty Three (33) nos. of 120kV rated voltage, 102kV(rms) continuous operating voltage at
500c, 10kA nominal discharge current, 50Hz, Heavy duty station class, gapless metal oxide
type, single phase surge arresters.

1C13 One (1) lot of flexible conductors for bus and jumper, insulators, fittings including all
necessary clamps and connectors required for completing 145kV busbar and switchgear
connection as specified in the technical specifications and bid drawings.

1C14 One (1) lot of steel structures for gantry and equipment supports required for completing
145kV busbar and switchgear as specified in the technical specifications and bid drawings.

1D 33kV Air Insulated Switches and Connection for Auxiliary Transformers

The 33kV AIS shall comply with the particular requirements as detailed in the Schedule of
Technical Requirements included as Appendix A1 to this section and shall comprise the
following:-

1D1 Two (2) sets of 33kV, 630A, 25kA/1sec, 50Hz, 170kVp BIL, vacuum circuit breakers with
spring-stored energy operating mechanism.

Schedule-A Page 8 of 53
1D2 Four (4) sets of 33kV, 630A, 25kA/1sec, 50Hz, 170kVp BIL, single vertical break, post type,
motor operated disconnectors.

1D3 Six (6) nos. of single-phase, 2-core, 145kV, 25kA/1sec, 50Hz, 170kVp BIL, Inductive Voltage
Transformer.

1D4 Six (6) nos. of 30kV rated voltage, 10kA nominal discharge current, 50Hz, Heavy duty station
class, single phase surge arresters.

1D5 One (1) lot of Tertiary side connection between 33kV terminal to switches including
necessary fittings, structures and conductors and XLPE for 400/132/33kV transformer.

1E Power Transformers & Earthing/Auxiliary Transformers

1E1 Three (3) sets of 400/135/33 kV, 250/325 MVA (ONAN/ONAF), three phase outdoor type
power transformers, equipped with 33 kV tertiary winding (brought out to terminal bushings).

1E2 Two (2) sets 33/0.415 kV, 500kVA three phase outdoor type earthing/auxiliary Zig-Zag
transformers without neutral earthing resisters, associated Bushing & outdoor neutral CTs
and steel support structures including all necessary connections. The delta connected
tertiary windings of two new 400/132/33kV 3 phase transformers shall supply the two
33/0.415 kV, auxiliary Zig-Zag transformer for the purpose of supplying the substation
auxiliary power requirements.

1F Control, Protection, Monitoring, Substation Automation & Metering

420 kV Circuits

The equipment to be supplied, installed and commissioned is shown in bid drawings are
comprising of:-

1F1 Control, Protection & Monitoring and Substation Automation System including event
recording function for six (6) sets of overhead line circuit bays.

1F2 Control, Protection & Monitoring and Substation Automation System including event
recording function for three (3) sets of 400/132/33kV three phase, auto power transformer
circuits including transformer tap changer control, fan control & AVR as per 4.15(N) of
section 4 in volume 2 of 3.

1F3 One (1) set of Busbar protection for 400kV system

1F4 One (1) set of Independent standalone Digital Fault and Disturbance recorder (DFDR) to
monitor complete substation including all 400kV,132kV & shunt reactor bays.

Schedule-A Page 9 of 53
1F5 One (1) lot of Tariff metering panel to accommodate programmable & recordable digital 3-
phase, 4-wire import and export MWh and MVArh meters (accuracy class 0.2) for each
400kV line and transformer feeder. For each feeder minimum two meters (main & check)
including one set software and communication cord. Substation Automation System shall
include the metering for all the bays. Tariff Metering is to be supplied from Europe, USA or
Japan origin. Printed catalogue, operation and service manual are to be provided.

245 kV Circuits

Deleted

145 kV Circuits

The equipment to be supplied, installed and commissioned is shown in bid drawings are
comprising of :-

1F6 Control, Protection & Monitoring and Substation Automation System including event
recording function for Eight (8) sets of overhead line circuits bays.

1F7 Control, Protection & Monitoring and Substation Automation System including event
recording function for three (3) sets of 400/132/33 kV power transformer circuits including
transformer tap changer control.

1F8 Control, Protection & Monitoring and Substation Automation System including event
recording function for one(1) set of bus coupler circuit.

1F9 One (1) set of Busbar protection for 132kV system

1F10 One (1) lot of Tariff metering panel to accommodate programmable & recordable digital 3-
phase, 4-wire import and export MWh and MVArh meters (accuracy class 0.2) for each 132
kV line and transformer feeder. For each feeder minimum two meters (main & check)
including one set software and communication cord. Substation Automation System shall
include the metering for all the bays. Tariff Metering is to be supplied from Europe, USA or
Japan origin. Printed catalogue, operation and service manual are to be provided.

33kV Station Power System

1F11 One (1) lot of Control, Protection & Monitoring and Substation Automation System including
event recording function for two 33kV circuits connected between tertiary side of 400/132kV
Power transformers and two sets of 33/0.415 kV station Auxiliary Transformers.

1F12 One (1) lot of Tariff metering panel to accommodate programmable & recordable digital 3-
phase, 4-wire import and export MWh and MVArh meters (accuracy class 0.2) for each 33
kV transformer feeder. For each feeder minimum two meters (main & check) including one

Schedule-A Page 10 of 53
set software and communication cord. Substation Automation System shall include the
metering for all the bays. Tariff Metering is to be supplied from Europe, USA or Japan origin.
Printed catalogue, operation and service manual are to be provided.

1G Multicore Cables

1G1 One (1) lot complete set of multicore low voltage XLPE insulated power and control cables
(IEC 60502) shall be supplied, installed, glanded, terminated and have individual cores
identified to be used for connection of all equipment supplied under the Contract. The overall
substation cable routing and core schedules shall also be provided. Necessary Sizing
calculation shall have to be submitted for approval during execution stage.

1H Earthing and Lightning Protection

1H1 One (1) lot of design, supply and installation of earthing system and lightning protection
screen including connections, connectors and clamps, to suit the substation overall
arrangement and provide supporting design calculations.

1H2 Two (2) sets of 3-phase portable (maintenance) earthing equipment devices with connectors
and telescopic glass fibre operating pole suitable for plant supplied.

1I Batteries, Chargers and DC Distribution

1I1 110V substation alkaline batteries complete with chargers and distribution switchboard to be
supplied, installed and commissioned to provide all DC supplies to equipment being
supplied.

The system shall generally be as shown in bid drawing and shall include:

a) Two (2) sets of 100% batteries complete, each capacity shall not be less than 350Ah at
the 5-hour rate of discharge for 400kV switchyard.

b) Two (2) sets of 100% batteries complete, each capacity shall not be less than 300Ah at
the 5-hour rate of discharge for 132kV switchyard (and for future 230kV Switchyard).

During execution stage the battery capacity shall be confirmed with calculation by the
contractor considering the bays under scope of work and future bays as per clause 8.4.3 of
section 8 of Volume 2 of 3 of the biding document. The battery with higher capability if
required after calculation shall be supplied by the Contractor within the same Contract price.

c) Two (2) sets of battery chargers complete, each float charge shall not be less than 120A
rating for 400kV switchyard.

Schedule-A Page 11 of 53
d) Two (2) sets of battery chargers complete, each float charge shall not be less than 100A
rating for 132kV switchyard.

The charger rating shall be based on the load & boost charging rate and during execution
stage after calculation if the higher charging charger is found to be required, it shall be
supplied by the Contractor within the same Contract price.

e) One (1) lot of DC distribution board. The DC distribution board shall be with 25% overall
spare switches for future use.

Two (2) sets of batteries and battery chargers shall be located in the 400kV #1 local control
house and shall be used for first main and second main DC supplies for 400kV switchyard.

Two (2) sets of batteries and battery chargers shall be located in the 132kV #1 local control
house. One set shall be used for DC supplies for 132kV switchyard ( & for future 230kV
Switchyard) and the other set shall be used for standby (emergency) DC supplies for 132kV
switchyard ( & for future 230kV Switchyard).

All DC status excluding control & protection (DC voltage status for each bus including
coupling breaker on/off status, fail with alarm, status of DC MCB/MCCB at SPR with fail
alarm etc.) shall be incorporated in substation automation system.

1I2 48V DC system and distribution equipment to be supplied, installed and commissioned in the
main control building for the new fibre optic multiplexer equipment for communication and
protection. One set shall be used as standby supply.

The system shall generally be as shown in bid drawing and shall include:

(a) Two (2) sets of 100% batteries complete, each capacity shall not be less than 250 Ah at
the 5-hour rate of discharge

During execution stage the battery capacity shall be confirmed with calculation by the
contractor considering the bays under scope of work and future bays as per clause 8.4.3 of
section 8 of Volume 2 of 3 of the biding document. The battery with higher capability if
required after calculation shall be supplied by the Contractor within the same Contract price.

(b) Two (2) sets of battery chargers of output 48V DC, 100A and input voltage three phase
50Hz, 415 V AC.

The charger rating shall be based on the load & boost charging rate and during execution
stage after calculation if the higher charging charger is found to be required, it shall be
supplied by the Contractor within the same Contract price.

Schedule-A Page 12 of 53
(c) One (1) lot of DC distribution board. The DC distribution board shall be suitable to
connect the new fibre optic multiplexer equipment for communication and protection
with 25% overall spare switches for future use.

(d) One (1) set of Inverter for SAS from 48V DC system having rating of 1.5kVA, 30
minutes. Provision shall be kept so that, after 30 minutes, the inverter shall be
disconnected from 48V battery.

48V DC system and distribution equipment shall be located in the Main Control Building.

All DC status excluding control & protection (DC voltage status for each bus including
coupling breaker on/off status, fail with alarm etc.) shall be incorporated in substation
automation system.

1J LVAC Distribution

1J1 One (1) lot of LVAC switchboard for substation services to be supplied, installed and
commissioned, to provide the 415/240V supplies to all equipment being supplied under this
turnkey Bid.

All AC status excluding control & protection (AC voltage status for each bus including
coupling breaker on/off status, fail with alarm, status of AC MCB/MCCB at SPR with fail
alarm etc.) shall be incorporated in substation automation system.

1J2 Deleted

1J3 One (1) lot of Tariff metering panel to accommodate programmable & recordable digital 3-
phase, 4-wire import and export MWh and MVArh meters (accuracy class 0.2) for three
33/0.415 kV station auxiliary transformer feeder circuits. For each feeder minimum two
meters (main & check) shall have to supplied.

The system and requirements shall generally be as shown in Bid drawing and technical
specification of Volume 2 and shall include one 125A outdoor weather-proof 3-phase with
neutral and earth switched socket outlet and plug as per IEC 309; to be installed, cabled and
connected adjacent to the auxiliary transformers.

1K Civil Works, Building and Foundation

1K1 One (1) lot of complete design, supply and construction of all civil items required for the
outdoor works suitable for switchyard gantry & equipment foundations, transformer
foundations, blast walls, oil pit, entrance & internal roads, cable trenches, septic tank,
surfacing, drainage, fences, guard house, boundary wall, etc.

Schedule-A Page 13 of 53
1K2 One (1) lot of complete design, supply and construction of all civil items and facilities
required for the two storied main control building, two new one storied local control houses in
400kV switchyard and one new one storied local control house in the 132kV switchyard.

1K3 One (1) lot of complete design, supply and construction of firefighting system for
transformers including water pipe network and reservoir at normal pressure. Necessary
Sizing calculation shall have to be submitted for approval during execution stage.

1L Lighting, Small Power, Air Conditioning and Ventilation

1L1 One (1) lot of complete design, supply, installation and commissioning of equipment to
provide lighting, LV power supply, air conditioning system, ventilation system and emergency
DC lighting for the main control building and local control houses. Necessary Sizing
calculation shall have to be submitted for approval during execution stage.

1L2 One (1) lot of complete set of design, supply, installation and commissioning of equipment to
provide lighting (flood light; sodium/mercury) for security, roadway, switchyard and
emergency DC lighting at strategic locations for equipment operation and inspection.
Necessary Sizing calculation shall have to be submitted for approval during execution stage.

1M Fibre Optic Multiplexer Equipment for Communication and Protection

1M1 The equipment to be supplied, installed and commissioned shall be as shown on bid drawing.
One(1) lot complete set of design, supply, installation and commissioning of fibre optic
multiplexer equipment including necessary works to interface with existing system is to be
provided for:
- 87 or 21 relay for each transmission line protection (through fibre cores)
- 21 relay carrier signal (main and back-up)
- SCADA data from switchgear and control system
- Hot-line telephone system

1M2 New digital PABX with subscriber telephone sets for the complete substation including
necessary works to interface with existing system.

1M3 Underground optical fibre cables (48 cores for 400kV and 24 cores for 132kV switchyard)
from terminal box gantry structure at each 400kV & 132kV double circuit transmission line
termination point to MDF (Main distribution Frame) to be installed in control room. The
Contract includes supply and installation of MDF and pigtail cables with adequate length.

1M4 PLC Equipment:

The equipment to be supplied, installed and commissioned shall be as per the SLD.
The scope of supply is summarised as follows:-

Schedule-A Page 14 of 53
400kV

6 sets:- Indoor PLC equipment including teleprotection at Gopalganj for (direction Payra-1 &
2, Rampal-1 & 2 and Aminbazar-1 & 2) 400 kV line.

12 nos.:- line matching units for phase to phase circuit coupling for 400kV lines.

1 set : - Digital Type telephone exchange and must be compatible with existing network
scheme.

Additionally, if any Interfaces are required for system configuration at each remote end
substation, then interface devices shall be installed in each existing system as a lot.

1N SCADA system for Telecontrol and Telemetering

1N1 One (1) lot of complete design, supply, delivery, installation, testing & commissioning of
hardware and software to provide the telecontrol & telemetering facilities required at the
existing National Load Despatch Center (NLDC) at Rampura for integration of complete new
400/132kV substation. All required electrical signals shall be transmitted to the NLDC
through the Industrial Gateway of the substation automation system. All HV breakers,
motorized disconnectors, tap changer, etc. shall be controlled form NLDC through the
Gateway of the substation automation system using IEC 60870-5-101 protocol. All necessary
modification works in the software of master station of NLDC are to be carried out.

Section-II Mandatory Spares, Erection & Test Equipment

Supply of complete spares and spare parts of transformer, switchgear, control equipment,
protection relays, meters, erection & test equipment as per quantity mentioned in Schedule
B. Test equipment is to be supplied from Europe, USA or Japan origin. Printed catalogue,
operation and service manual are to be provided. The materials shall have to be handed
over to the designated store as per instruction of the Engineer.

Section-III Shunt Reactor & Associated works

EMTP Study, Shunt Reactor and associated bay considering both Gopalganj 400kV & Payra
400kV sides and Gopalganj 400kV & Rampal 400kV sides [Requirement of Shunt reactor
and associated shall be determined by EMTP study which shall be carried out under this
scope of work. The clause related to change of facilities (no. 39 of General Condition of
Contracts-GCC) shall not be applicable for the works under this section-III.]

3A Works and Equipment for Shunt Reactor Installation

Schedule-A Page 15 of 53
The works for shunt reactor shall comply with Section 16 of the Technical Specification and
the particular requirements as detailed in the Schedule of Technical Requirements included
as Appendix A1 to this section and shall comprise the following:-

3A1 EMTP study (for 400kV Payra- 1 & 2 and Rampal-1 & 2 line) shall be performed by the
contractor and shall include the following aspects but are not limited to
i) to determine the requirement and the size of the shunt reactor at both sides of the
above transmission lines
ii) to determine the requirement, rating (kV, kJ, kA etc.) and the number of lighting
arrester at Gopalganj 400kV switchyard
iii) to determine the value of PIR

The EMTP study shall have to be performed using PSCAD software and shall include
training of six (06) Design Engineers of the Employer for two (2) weeks regarding the use of
PSCAD software for typical EMTP study including/having example of the said EMTP study
under this project.

3A2 Four (4) sets of 420 kV, Size: 25MVAR (only for Bid purpose, the final size shall be as per the
EMTP study to be done by the Contractor) (ONAN), three phase outdoor type Shunt Reactor
as specified in the technical specifications of this Section. It is to be mentioned that, for
change in MVar size of Shunt Reactor during execution based on EMTP study, the price
shall be adjusted as follows:


= %× ± %× × ;

ℎ ,
= , = ( )

3A3 Four (4) sets of 420kV, 800A, 50kA/1sec, 50Hz, 1425kVp BIL, live tank type, gang operated,
SF6 gas circuit breakers with spring-stored energy operating mechanism capable of reactor
switching as specified in the technical specifications, Section 3, Volume 2 of 3 of the Bidding
Document.

3A4 Four (4) sets of 420kV, 800A, 50kA/1sec, 50Hz, 1425kVp BIL, horizontal double break, post
type, motor operated disconnectors without earthing switch as specified in the technical
specifications, Section 3, Volume 2 of 3 of the Bidding Document.

3A5 Control, Protection, Monitoring & Substation Automation System including event recording
function for four (4) sets of Shunt Reactor line circuits as specified in the technical
specifications and bid drawings of Volume 2 of 3 of the Bidding Document)

3A6 One (1) Lot of Design, supply and construction of Water spray type fire fighting system for
four Shunt Reactor.

Schedule-A Page 16 of 53
3A6 One (1) lot of rigid tubular bus [Aluminium of grade 63401 WP], flexible conductors,
insulators, fittings including all necessary clamps and connectors required for completing
420kV busbar and switchgear connection for Shunt Reactor bay as specified in the technical
specifications and bid drawings of Volume 2 of 3 of the Bidding Document

3A7 One (1) lot of steel structures for gantry, equipment supports and civil works required for
completing 420kV busbar and switchgear for Shunt Reactor bay as specified in the technical
specifications and bid drawings of Volume 2 of 3 of the Bidding Document.

Section-IV IEC Electronic license

This section includes requirement of electronic license of IEC (International Electrotechnical


Commission) so that latest IEC standards can be viewed online and downloaded when
required by the Employer.

The purpose of IEC Electronic license is to facilitate online access of the Employer to the
latest IEC standard in their online web-store. The access includes viewing and downloading
of latest IEC standard related to Power system & its associated equipment. A sample list of
Power system & its associated equipment is, but not limited to,: Power & Auxiliary
transformer, Shunt & Series Reactor, Circuit Breaker, Disconnector with & without Earth
Switch, Instrument transformer (CT, IVT, CVT), Protection Relay & SAS, Conductor, Cable
( Power & Control cable), GIS, Substation Earthing, Substation DC System, Substation
lightning Protection System, Substation Communication System etc. The license agreement
shall be between the Employer and IEC and the year wise licence fee shall be paid by the
Employer. Initially the agreement shall be for five (5) years. However, the bidder shall work
as media upto the licence agreement and they shall only consider 1st year licence fee in their
bid. The licenses shall be in the name of PGCB with user as Superintending Engineer,
Substation Design & Quality Control.

4A1 One (1) lot of one (1) IEC Electronic licence for 1st year and permission of viewing &
downloading latest IEC standard from online web-store related to Power system & its
associated equipment. One Complete set of

Schedule-A Page 17 of 53
APPENDIX A1

SCHEDULE OF TECHNICAL REQUIREMENTS OF


400kV, 132kV and 33kV AIR INSULATED SWITCHGEAR (AIS)

Sl. No. Description Unit 400kV 132kV 33kV


1. Site Condition
a) Max. Altitude above sea level m not more than 1000
b) Max. Ambient temperature outdoor ℃ +45
c) Min. Ambient temperature outdoor ℃ +4
d) Max. Ambient relative humidity % 100
e) Max. Seismic acceleration at floor level
- horizontal g 0.1
- vertical g 0.1

2. Electrical Data
a) Rated Voltage kV 420 145 36
b) Rated Frequency Hz 50 50 50
c) Insulation Level
- lightning impulse withstand kVp 1550 for Bus PI 650 170
1425 for other equipment
- switching impulse withstand kVp 1175(Ph-E) for Bus PI —
1050(Ph-E) for other equipment
- 50 Hz withstand 1 minute kV — 275 70
d) Rated continuous current at 40℃
ambient temperature
- Main Busbar A 4000 3000
- Diameter A 4000 N/A
- Transformer Bay A 1600 1600 800
- Line Bay A 4000 1250 N/A
- Coupler Bay A N/A 3000 N/A
e) Rated short time withstand
- current kA 50 40 25
- duration Sec 1 1 1
Rated peak withstand current kA 125 100 62.5

3. Secondary Circuit
a) Auxiliary voltage
- for control and signal V dc 110
- for remote control V dc 110
- for heating V ac 415/240
- tolerances % -15/+10

Schedule-A Page 18 of 53
4. Circuit Breakers

4.1 420kV Class Circuit Breakers


1 Type Outdoor, SF6 insulated,
live tank type
2 Standard IEC 62271-100
3 Rated voltage 420 kV
4 Rated short-duration power frequency withstand voltage (1 min.)
- Between line terminal and ground 520 kV rms
- Between terminals with CB open 610 kV rms
5 Rated switching impulse withstand voltage
- Between line terminal and ground 1050 kV peak
- Between terminals with CB open 900 (+345) kV peak
6 Rated lightning impulse withstand voltage
- Between line terminal and ground 1425 kV peak
- Between terminals with CB open 1425 (+240) kV peak
7 First pole to clear factor 1.3
8 Rated current 4000 A
9 Rated short circuit breaking current 50 kA rms
10 Rated short circuit making current 125 kA peak
11 Short time withstand current for 1 sec. 50 kA rms
12 Corona extinction voltage with CB open or close 320 kV rms
13 Max. radio interference voltage for frequency between 0.5MHz and 1000 micro V
2MHz in all positions (at 266 kV rms)
14 Total closing time Not more than 150 ms
15 Total breaking time 40 ms
16 Operating mechanism Spring

17 Rated duty cycle O-0.3s-CO-3min-CO


18 Reclosing Single phase & Three
phase auto-reclosing
19 Creepage distance 25 mm/kV
20 Number of closing coils 1
21 Number of tripping coils 2
22 Number of auxiliary contacts for:
- Making Min. 12
- Breaking Min. 12

Schedule-A Page 19 of 53
- Middle position 0

23 Ingression Protection class IP55

4.2 245kV Class Circuit Breakers


Deleted

4.3 145kV Class Circuit Breakers


1 Type Outdoor, SF6 insulated,
live tank type
2 Standard IEC 62271-100
3 Rated voltage 145 kV
4 Rated short-duration power frequency withstand voltage (1 min.)
- Between line terminal and ground 275 kV rms
- Between terminals with CB open 275 kV rms
- Between terminals with isolator open 315 kV rms
5 Rated lightning impulse withstand voltage
- Between line terminal and ground 650 kV peak
- Between terminals with CB open 650 kV peak
- Between terminals with isolator open 750 kV peak
6 First pole to clear factor 1.5
7 Rated current
- Bus coupler 3000 A
- Transformer bay 1600 A
- Line bay 1250 A
8 Rated short circuit breaking current 40 kA rms
9 Rated short circuit making current 100 kA peak
10 Short time withstand current for 1 sec. 40 kA rms
11 Max. radio interference voltage for frequency between 0.5MHz and 500 micro V
2MHz in all positions (at 92 kV rms)
12 Total closing time Not more than 100 ms
13 Total breaking time Not more than 70 ms
14 Operating mechanism Spring

15 Rated duty cycle O-0.3s-CO-3min-CO


16 Reclosing Single phase & Three

Schedule-A Page 20 of 53
phase auto-reclosing

17 Creepage distance 25 mm/kV


18 Number of closing coils 1
19 Number of tripping coils 2
20 Number of auxiliary contacts for:
- Making Min. 12
- Breaking Min. 12
- Middle position 0
21 Ingression Protection class IP55

4.4 36kV Class Circuit Breakers


1 Type Outdoor type VCB
2 Standard IEC 62271-100
3 Rated voltage 36 kV
4 Rated short-duration power frequency withstand voltage (1 min.) 70 kV rms
5 Rated lightning impulse withstand voltage 170 kV peak
6 First pole to clear factor 1.5
7 Rated current 630 A
8 Rated short circuit breaking current 25 kA rms
9 Rated short circuit making current 65 kA peak
10 Short time withstand current for 1 sec. 25 kA rms
11 Total closing time Not more than 150 ms
12 Total breaking time 45 ms
13 Operating mechanism Motor spring stored
energy
14 Rated duty cycle O-0.3s-CO-3min-CO
15 Number of closing coils 1
16 Number of tripping coils 2
17 Number of auxiliary contacts for:
- Making Min. 8
- Breaking Min. 8
- Middle position 0
18 Ingression Protection class IP55

Schedule-A Page 21 of 53
5. Disconnector Switches/Isolators

5.1 420kV Class Isolators and Earthing Switch


1 Type Outdoor,
Horizontal double break
2 Standard IEC 62271-102
3 Rated voltage 420 kV
4 Rated short-duration power frequency withstand voltage (1 min.)
- To earth 520 kV rms
- Across isolating distance 610 kV rms
5 Rated switching impulse withstand voltage
- To earth 1050 kV peak
- Across isolating distance 900 (+345) kV peak
6 Rated lightning impulse withstand voltage
- To earth 1425 kV peak
- Across isolating distance 1425 (+240) kV peak
7 Corona extinction voltage 320 kV rms
8 Rated normal current 4000 A
9 Rated short circuit current (Ith), 1s 50 kA rms
10 Rated short circuit current (Idyn) 125 kA peak
11 Creepage distance of insulator 25 mm/kV
12 Operating mechanism of isolator / earthing switch AC motor operated
13 Number of auxiliary contacts for main switch
- Making Min. 12
- Breaking Min. 12
- Middle position Min. 1
14 Number of auxiliary contacts for earthing switch
- Making Min. 12
- Breaking Min. 12
- Middle position Min. 1
15 Radio interference level for 0.5 MHz to 2 MHz 1000 micro V
(at 266 kV rms)

Schedule-A Page 22 of 53
5.2 245kV Class Isolators and Earthing Switch
Deleted

5.3 145kV Class Isolators and Earthing Switch


1 Type Outdoor,
Double side break
2 Standard IEC 62271-102
3 Rated voltage 145 kV
4 Rated short-duration power frequency withstand voltage (1 min.)
- To earth 275 kV rms
- Across isolating distance 315 kV rms
5 Rated lightning impulse withstand voltage
- To earth 650 kV peak
- Across isolating distance 750 kV peak
6 Rated normal current
- Bus coupler 3000 A
- Transformer bay 1600 A
- Line bay 1250 A
7 Rated short circuit current (Ith), 1s 40 kA rms
8 Rated short circuit current (Idyn) 100 kA peak
9 Creepage distance of insulator 25 mm/kV
10 Operating mechanism of isolator / earthing switch AC motor operated
11 Number of auxiliary contacts for main switch
- Making Min. 12
- Breaking Min. 12
- Middle position Min. 1
12 Number of auxiliary contacts for earthing switch
- Making Min. 10
- Breaking Min. 10
- Middle position Min. 1
13 Radio interference level for 0.5 MHz to 2 MHz 500 micro V
(at 92 kV rms)

5.4 36kV Class Isolators


1 Type Outdoor,
Single vertical break
2 Standard IEC 62271-102
3 Rated voltage 36 kV
4 Rated short-duration power frequency withstand voltage (1 min.) 70 kV rms

Schedule-A Page 23 of 53
5 Rated lightning impulse withstand voltage 170 kV peak
6 Rated normal current 630 A
7 Rated short circuit current (Ith), 1s 25 kA rms
8 Rated short circuit current (Idyn) 65 kA peak
9 Creepage distance of insulator 25 mm/kV
10 Operating mechanism of isolator AC motor operated
11 Number of auxiliary contacts for main switch
- Making / Breaking / Middle position Min. 6 / 6 / 1
6. Instrument Transformers

6.1 Instrument Transformers


SL Item 420 kV 145 kV
1 Rated lightning impulse withstand voltage 1425 kVp 650 kVp

2 Rated switching impulse withstand 1050 kVp -


voltage
3 Power frequency withstand voltage (1 630 kVrms 275 kVrms
min.)
4 Corona extinction voltage 320 kVrms -

5 Radio interference level for 0.5 MHz to 2 1000 micro V 500 micro V
MHz (at 266 kVrms) (at 92 kVrms)
6 Partial discharge level 10 pC 10 pC
7 Type of insulation Class A Class A

6.2 420kV Class Current Transformers


1 Core No. 6
2 Ratio 4000/1
3 Class of accuracy - Busbar Protection : Class X
- Protection : 5P20
- Metering : Class 0.2
4 Burden (VA) - Protection : 60
- Metering : 10
5 Min. knee point voltage at lowest ratio (Volts) 600 and over ( to be finalized after
sizing calculation during execution of
the project)

Schedule-A Page 24 of 53
6 Max. magnetizing current guaranteed at M.R
knee point voltage & the lowest ratio (mA)
7 Max. resistance of secondary winding at 75 0C and at M.R
lowest ratio (ohms)

6.3 245kV Class Current Transformers


Deleted
6.4 145kV Class Current Transformers (for transformer bay)
1 Core No. 5
2 Ratio 1600/1
3 Class of accuracy - Busbar Protection : Class X
- Protection : 5P20
- Metering : Class 0.2
4 Burden (VA) - Protection : 30
- Metering : 10
5 Min. knee point voltage at lowest ratio (Volts) 600 and over ( to be finalized after
sizing calculation during execution of
the project)
6 Max. magnetizing current guaranteed at M.R
knee point voltage & the lowest ratio (mA)
7 Max. resistance of secondary winding at 75 0C and at M.R
lowest ratio (ohms)
6.5 145kV Class Current Transformers (for line bay)
1 Core No. 5
2 Ratio 1250/1
3 Class of accuracy - Busbar Protection : Class X
- Protection : 5P20
- Metering : Class 0.2
4 Burden (VA) - Protection : 60
- Metering : 10
5 Min. knee point voltage at lowest ratio (Volts) 600 and over ( to be finalized after
sizing calculation during execution of
the project)
6 Max. magnetizing current guaranteed at M.R
knee point voltage & the lowest ratio (mA)
7 Max. resistance of secondary winding at 75 0C and at M.R
lowest ratio (ohms)

Schedule-A Page 25 of 53
6.6 145kV Class Current Transformers (for bus coupler bay)
1 Core No. I II
2 Ratio 3000/1 3000/1
3 Purpose Protection Protection
4 Class of accuracy X X
5 Burden(VA) 30 30
6 Min. knee point voltage at 600 and over ( to be finalized 600 and over ( to be finalized
lowest ratio(Volts) after sizing calculation during after sizing calculation during
execution of the project) execution of the project)
7 Max. magnetising M.R M.R
current guaranteed at
knee point voltage & the lowest
ratio(mA)
8 Max. resistance of secondary M.R M.R
winding at 75 0C and at lowest
ratio (ohms)

6.7 420kV Class Capacitive Voltage Transformer

1. Rated voltage levels 420 kV


2. High frequency capacitance for entire carrier Within 80% to 150% of rated capacitance
frequency range
3. Rated Voltage Factor 1.2 continuous; 1.5 for 30 seconds

4. Rated total capacitance(pF) 5000, +10% and -5%


5. Phase angle error (minutes) 20
6. Acceptable limit of variation of total + 50% and -20% of the rated capacitance
capacitance over the entire carrier frequency
range
7. Equivalent series resistance over the entire Less than 40
carrier frequency range or temperature
range (ohms)
8. Stray capacitance and stray conductance of As per IEC-358
low voltage terminal over the entire
capacitance.
9. Standard reference range of frequencies for 97% to 103% for protection
which the accuracies are valid 99% to 101% for metering

Schedule-A Page 26 of 53
10. Primary winding Resistance

11. Magnetizing Current

12. Total Loss

13. Core details Core-I : Core-II : Core-III :

14. Purpose Protection Protection Metering

15. Secondary Voltage 110/√3 110/√3 110/√3

16. Burden (VA) 10 10 10

17. Class of accuracy 3P 3P 0.2

18. Rated total thermal burden(VA) 200 200 200

19. One minute power frequency 4(10 if the low voltage terminal is exposed)
withstand voltage between LV terminal and
earth(kV rms)
20. Withstand voltage for secondary winding (kV 2
rms)
NOTE:-The accuracy of 0.2 on winding III shall be maintained upto Rated total Thermal burden
(200VA).

6.8 245kV Class Voltage Transformer


Deleted

6.9 145kV Class Voltage Transformer

1. Rated voltage levels 145 kV


2. High frequency capacitance for entire carrier Within 80% to 150% of rated capacitance
frequency range
3. Rated Voltage Factor 1.2 continuous; 1.5 for 30 seconds
4. Rated total capacitance(pF) 4400, +10% and -5%
5. Phase angle error (minutes) 20
6. Acceptable limit of variation of total + 50% and -20% of the rated capacitance
capacitance over the entire carrier frequency
range
7. Equivalent series resistance over the entire Less than 40
carrier frequency range or temperature range
(ohms)

Schedule-A Page 27 of 53
8. Stray capacitance and stray conductance of As per IEC-358
low voltage terminal over the entire
capacitance.
9. Primary winding Resistance
10. Magnetizing Current

11. Total Loss

12. Core details Core-I : Core-II :

13. Purpose Protection Metering

14. Secondary Voltage 110/√3 110/√3

15. Burden (VA) 10 10

16. Class of accuracy 3P 0.2

17. Rated total thermal burden(VA) 200 200

18. One minute power frequency 4(10 if the low voltage terminal is exposed)
withstand voltage between LV terminal and
earth(kV rms)
19. Withstand voltage for secondary winding (kV 2
rms)

7 Surge Arresters
1 Max. highest system voltage 420kV 145kV 36kV
2 Type Outdoor type, ZnO, Gapless
3 Standard IEC 60099-4
4 Rated voltage 390kV 120kV 30kV
5 Max. continuous operating voltage 303kVrms 102kVrms 25kV
6 Nominal discharge current 10kA 10kA 10kA
7 Discharge class Heavy Heavy Heavy
duty 3 duty 3 duty 3
8 Surge counter Yes Yes Yes
9 Leakage current detector Yes Yes Yes

Schedule-A Page 28 of 53
APPENDIX A2

SCHEDULE OF TECHNICAL REQUIREMENTS OF


400/132/33 kV POWER TRANSFORMER

Sl. No. Description


RATING AND PERFORMANCE
1 Maximum continuous rating (MCR) MVA 325
2 Number of Phases 3
3 Number of windings 3
4 Normal ratio of transformation at no load and kV 400/132/33
at principle tap - HV/LV/TV
5.1 Corresponding highest system voltages kV 420/145/36
5.2 Corresponding lowest system frequency Hz 48
6 Minimum withstand voltages:
- Full wave impulse withstand
of windings kVp 1425/650/170
of line terminal bushings kVp 1425/650/170
- Induced over voltage kV rms 650/275/70
- Power frequency withstand of neutral kV rms 38
7 Type of cooling ONAN/ONAF
8 Minimum continuous rating MVA 250/325
9 Rating of tertiary windings MVA 50/65
10 Service conditions:
- External cooling medium - Air
- Altitude not exceeding m 150
- Air temperature not exceeding ºC 45
Average air temperature in any
one year not exceeding:
- In any one day ºC 35
- Average in one year ºC 25

11.1 Maximum temperature :


- Top oil rise normal ºC 55
- Average ONAN winding rise ºC 60
- Average ONAF winding rise ºC 60

11.2 Maximum hot spot temperature at ºC 98


maximum continuous rating at

Schedule-A Page 29 of 53
yearly average ambient temperature

11.3 Winding hot spot temperature on ºC 140


emergency overload not exceeding

12 Phase connections:
- HV winding Star
- LV winding Star
- TV winding Delta
- Vector group - HV/LV/TV YNa0d1
13 Short circuit withstand fault level at terminals of:
- 400 kV busbars kA 50
- 132 kV busbars kA 40
- 33 kV busbars kA 25
14 Impedance voltage at 75 ºC and normal tap &
MCR (at 325MVA) between windings (% on HV Base):
- HV & LV % on HV base % 13
15 Delta connected tertiary winding
- Nominal voltage kV 33
- External load kVA 500 kVA
16.1 Total range of variation of on load
transformation ratio (on HV side) as sl. no. 4:
- Ratio % ±10
- Size of steps % 1.25
16.2 Type of control On load local,
remote and
supervisory
electrical and
hand operation
17 Line drop compensation Yes
18 Whether automatic control required and reference voltage Yes, 110V, 50Hz
19 Whether separate remote control panel required Yes
20 DC supply:
- Nominal V 110
- Maximum float voltage V 125
21 Whether provision for supervisory control required, including Yes
AVR setting
22 Whether marshalling kiosk required Yes ,Tank side
Cubicle

Schedule-A Page 30 of 53
23 Number of transformers for which automatic control is to be 3 (and provision
suitable for future 4th )
24 TERMINATIONS
Bushing insulators or cable boxes
on line and neutral terminals:
i) HV line Oil/Air Bushings

ii) Tertiary winding Oil/Air Bushings

iii) LV line Oil/Air Bushings

iv) Neutral Oil/Air Bushings


25 BCT PARTICULARS
i) HV (400 kV) Side (Core 1 & 2): 1600-800/1,1A,
30VA
Core 3 Ratio, burden
and accuracy
class shall be
matched with
WTI meter
ii) LV (132 kV) Side (Core 1 & 2): 1600-800/1,1A,
30VA
Core 3 for WTI meter
Core 4 for Tap changer
iii) Tertiary Side (Core 1 & 2): 800/1A,
30VA

iv) Neutral Bushing (core 1): 1600/1A,


30VA

26 Pollution category of bushing insulators 25 mm/kV


of system rated
(highest)
voltage
27 COOLING
i) Number of cooler banks required per transformer To suit
transformer
design
ii) Rating of each cooler bank as percentage of total loss %
at CMR 50

iii) Standby cooling requirement One fan in each

Schedule-A Page 31 of 53
group with failing
of one fan shall
not reduce the
MCR
GENERAL
28 Type of oil preservation system Air Cell
29 Maximum acceptable noise level 78 dBA

APPENDIX A3

SCHEDULE OF TECHNICAL REQUIREMENTS OF


400/230/33 kV POWER TRANSFORMER

Deleted

APPENDIX A4

SCHEDULE OF TECHNICAL REQUIREMENTS OF


33/0.415 kV EARTHING/AUXILIARY (STATION SERVICE) TRANSFORMER

SL. No. Description

EARTHING/AUXILIARY TRANSFORMER ( Zig-Zag Type)


1. Nominal rating kVA 500
2. Number of phase 3
3. Frequency Hz 50
4. No-load voltage ratio kV 33/0.415
5. Corresponding highest system voltage kV 36/1.1
6. Type of cooling ONAN
7. Coolant Mineral Oil
8. Type Core, Conservator Type
9. Installation Outdoor, Tropical and high rainfall and humidity
10. Earthing Neutral solidly earthed in interconnected star
winding
Neutral earthed in LT 3 phase, 4 wire system
11. Windings Double wound of high conductivity copper
12. Test voltage
Impulse test voltage (1.2/50 ㎲) kV 170/10 (HT/LT)

Schedule-A Page 32 of 53
Power frequency withstand voltage kV 70/2.5 (HT/LT)
for 1 min
13. Vector group ZNyn11
14. Neutral to be brought out HT: Yes, LT: Yes
15. Neutral insulation Full insulation and 100% loading capacity
16. LT bushing 4 nos.
17. Impedance voltage % 4-5
18. Tapping range Off load tap changer
±5% in the step of 2.5
19. Tap changer control Manual

NEUTRAL EARTHING RESISTER (NER)


Not required

APPENDIX A5

SCHEDULE OF TECHNICAL REQUIREMENTS OF


33kV XLPE POWER CABLES

SL. No. Description 33 kV

1. Rated system voltage 33 kV


2. Max. permissible system voltage 36 kV
3. Rated frequency 50 Hz
4. No. of cable 1/phase
5. Cross sectional area 185 mm2 Cu [This is a minimum requirement,
actual value shall be as per approved calculation
during execution stage]
6. Impulse withstand voltage 170 kV
7. Power frequency withstand voltage 70 kV
8. Shape of conductor Compact round
9. Insulation thickness 8-9 mm
10. Min. bending radius 15 D

Schedule-A Page 33 of 53
(D is external diameter of cable)

11. Minimum DC resistance at 20 ℃ 0.0366 ohm/km

12. Short circuit rating for 1 sec 25 kA


13. Three phase symmetrical fault 70 kA
Current for 1 sec.

APPENDIX A6

SCHEDULE OF TECHNICAL REQUIREMENTS OF


NI-CAD BATTERY

SL. No. Description


1. Installation : Indoor
2. Cell type : Ni-cd
3. Voltage (Normal) : 1.2 volts per cell
4. Float voltage : 1.40-1.42 volt/cell
5. Equalizing/Boost Charging voltage : 1.60 - 1.75 volt/cell
6. Capacity in AH at 20°C : 350AH@5Hr for 400kV system & 300AH@5Hr for 132kV
system (for 110V DC system)
: 250 AH @ 5 Hr (for 48 V DC system)
7. Ambient temperature : 45°C
8. Positive plate : Tubular
9. Negative plate : Pasted
10. Type of container : Plastic polymer
11. Discharge voltage : 1.0 V/Cell (This voltage shall be calculated and confirmed
by the contractor during execution)
12. Sp. gravity of electrolyte : 1.19 ± 1%
13. Sp. gravity of electrolyte (Charged) : 1.23 ± .010 at 20°C
14. Vent plug : Anti-corrosive & fire proof
15. Cell condition : Pre-charged.
16. Battery stand : Steel frame of step type

Schedule-A Page 34 of 53
17. Standard : IEC or equivalent
APPENDIX A7

SCHEDULE OF TECHNICAL REQUIREMENTS OF


110 V BATERY CHARGER

SL. No. Description


A) GENERAL
1. Installation : Indoor
2. Rectifier type : Thyristor controlled.
3. Rated D.C. voltage : 110V ±5%
4. Rated output current : 150 & 120 Amps for 350AH & 300AH battery respectively
5. Charging mode : Both constant current & constant voltage
6. High Voltage Insulation : 1000 V AC for 1 minute between input to output and input
to ground
7. Insulation resistance : 10 M with 500 V DC for 1 minute
8. Cooling system : Self & natural air cooled.
9. Relative humidity : Up to 98%
10. Ambient temperature : 45°C (max.)
11. Noise level : 65 dB (max)
12. Altitude : 1000 m
13. Applicable Standard : IEC or equivalent.

B) TECHNICAL DATA
A.C. INPUT
1. Voltage : 415 Volts
2. Phase : 3 Phase
3. Frequency : 50 ± 5% Hz
4. Input AC voltage variation : ± 5%
5. Power factor (Full range) : 0.8
6. Efficiency (Full load) : 85%
7. Charge Characteristics : Constant current /Constant voltage
(During float charge)
8. Current limitation : 110%

D.C. OUTPUT
1. Voltage : 110,+3/-2% volt
2. Ripple Voltage (Full load) : ± 2%
3. Charge modes (3 level) : Charge, Float charge & Boost charge
4. Float Voltage (adjustable) : 1.40-1.45 volt/cell
5. Boost Voltage (adjustable) : 1.6-1.75 volt/cell

Schedule-A Page 35 of 53
APPENDIX A8

SCHEDULE OF TECHNICAL REQUIREMENTS OF


48 V BATERY CHARGERS

SL. No. Description

A) GENERAL
1. Installation : Indoor
2. Rectifier type : Thyristor controlled.
3. Rated D.C. voltage : 48 V ± 5%
4. Rated output current : 100Amps
5. Charging mode : Both constant current & constant voltage
6. High Voltage Insulation : 1000 V AC for 1 minute between
input to output and input to ground
7. Insulation resistance : 10 M with 500V DC for 1 minute
8. Cooling system : Self & natural air cooled.
9. Relative humidity : Up to 98%
10. Ambient temperature : 45°C (max.)
11. Noise level : 65 dB (max)
12. Altitude : 1000 m
13. Applicable Standard : IEC or equivalent.

B) TECHNICAL DATA

A.C. INPUT
1. Voltage : 415 Volts
2. Phase : 3 Phase
3. Frequency : 50 ± 5% Hz
4. Input AC voltage variation : ± 5%
5. Power factor (Full range) : 0.8
6. Efficiency (Full load) : 85%
7. Charge Characteristics : Constant current /Constant voltage
(During float charge)
8. Current limitation : 110%

D.C. OUTPUT

1. Voltage : 48,+3/-2% volt


2. Ripple Voltage (Full load) : ± 2%

Schedule-A Page 36 of 53
3. Charge modes (3 level) : Charge, Float charge & Boost charge.
4. Float Voltage (adjustable) : 1.40-1.45 volt/cell
5. Boost Voltage (adjustable) : 1.6-1.75 volt/cell

APPENDIX A9

SCHEDULE OF TECHNICAL REQUIREMENTS OF


SUBSTATION AUTOMATION SYSTEM

1. General Requirement:
Standards to be complied with Substation Automation system
Test Ca. Damp heat steady state IEC 60068-2-3
Test Db and guidance; Damp heat cyclic IEC 60068-2-30
Digital I/O, Analogue I/O dielectric Tests IEC 60870-3 class 2
Digital I/O, Surge withstand test IEC 60801-5/Class 2
Radio interference test IEC 60870-3/Calss 2
Transient fast burst test IEC 60801-4/4
Static Discharge IEC 60801-2/4
Electromagnetic fields IEC 60801-3-3
Temperature range (min/max) ℃ 0/50
Relative humidity % 93
Intelligent Electronic Devices (IED’s)
- serial communication interface included? Yes
- Protection & Control IED’s connected same bus? Yes
- self monitoring Yes
- display of measured values Yes
- remote parameterization Yes
- disturbance record upload and analysis Yes
Availability Calculation shall be furnished for each
equipments as well as for the entire system Yes
The main part of the system, HMI, Gateway,IED shall be Yes
furnished with dual communication port against any failure.

SNTP server shall provide GPS time-sync information to Yes


all communication (HMI, Gateway, IED) and the system
shall be synchronized.
Ethernet switch shall have dual system topology not to Yes
lose entire system with single swithing system failure.

2. Detailed Requirements:
Number of years of proven field experience of offered 5 Yrs.
system.

Schedule-A Page 37 of 53
(Note: proof of experience should be furnished. The
components used in the offered system and those with
field experience should be the same)
Design life of substation Automation System 20 Yrs
Manufacturers quality assurance system ISO 9001/9002 or equivalent
Dimensions of cubicle
- Width mm
- Depth mm
- Height mm
- Floor load N/m2 max.600
3. Station Level Equipment:
Station Controller Industrial PC
MTBF (Mean time between Failures) Hrs
MTTR (Mean time to repair) Hrs
Station computer shall have dual connection to Ethernet Yes
switch as redundant (hot, standby)
Hot standby take over time Seconds
Dual Wide Monitor each HMI (over 25”) Yes
Single wide screen Yes
Annunciator for Station PC system software 16 Windows
Number of years of proven field experience of offered 5 Yrs
software

Operating System Windows


All standard picture as per spec included in HMI Yes
Process Status Display & Command Procedures Yes
Event processing as per spec Yes
Alarm processing as per spec Yes
Reports as per spec Yes
Trend Display as per spec Yes
Graphical fault information receiving function Yes
Disturbance & Fault recording and analysis with graphical Yes
format
User Authority levels as per spec Yes
System supervision & monitoring as per spec Yes
Automatic sequence control as per spec Yes
4. Gateway to National Load dispatch Center
Number of years of proven filed experience of offered unit 5Yrs
Insulation tests
Fast disturbance tests IEC 60255-5
Industrial environment IEC 61000-4-4,Calss 4
Industrial grade hardware with no moving parts EN 50081-2 Class A
(PC based gateway is not accepted) Yes

Schedule-A Page 38 of 53
Design life of offered equipment
Redundant communication channel 20 Yrs
Redundant CPU Yes
Redundant DC/DC Supply Yes
MTBF (Mean time between Failures) Yes
MTTR (Mean time to repair) Hrs
Gateway shall have dual connection to ethernet switch(hot Hrs
and standby) Yes

5. Station Bus:
Physical Meduim Glass fibre optic
Each communication devices shall have dual connection, Yes
hot and standby.
6. Interbay Bus
Physical Meduim Glass fibre optic
7. Printer server
MTBF Hrs
8. Event Printer
MTBF Hrs
9. Hard Copy colour Printer
MTBF Hrs
10. Master Clock – GPS (Global Positioning System) Receiver:
MTBF Hrs
11. Bay control Unit - HV
Number of years of proven field experience of offered unit 5 Yrs
Separate Bay controller unit provided for each bay &
feeder Yes
Type of bay controller offered HV/MV
Select Before Operate with Open Execute & Close HV
Execute Yes
Single bit dependence
Interlocking, bay & Station wide No
Synchrocheck function Yes
- Maximum Voltage difference
- Maximum Frequency difference Specify range
- Maximum Phase difference Specify range
Double command blocking Specify range
Independent settable parameter groups Yes
Local Display Unit 4
Sequence of event recorder Yes
- Events

Schedule-A Page 39 of 53
- Time resolution 256
Disturbance recording file transfer function 1 ms
Comtrade file generation function of Distrubance Recorder Yes
IED shall have dual connection to Ethernet switch (hot & Yes
standby)
Comprehensive self-supervision Yes
Battery free backup of events and disturbance records
Insulation tests Yes
Fast disturbance tests Yes
MTBF
IEC 60255-5
MTTR
IEC 61000-4-4, Class 4
Temperature range: IED’s
Hrs
- Operation
Hrs
- Transport and storage
Relative humidity:
- Operating max./min ℃ -10 to +50
- Transport and storage ℃ -10 to +50

% 93
% 93
12. Back up control mimic –HV (400kV)
Control functionality:
Control of breaker as well as all isolators/earthing
switch
(Control functionality should not be affected if bay Yes
controller fails)
Key-Locked Yes
Interlock override function Yes
Separate backup control mimic provided for each bay Yes
& feeder
13. Bay Control Unit – MV : Deleted
15. Bay Control Unit – LV (132kV)
Number of years of proven field experience of offered unit 5Yrs
Separate Bay controller unit provided for each bay &
feeder Yes
Type of bay controller offered HV/MV
HV
Select Before Operate with Open Execute & Close
Yes
Execute
Single bit dependence
No
Interlocking, bay & Station wide
Yes
Synchrocheck function
- Maximum Voltage difference
Specify range
- Maximum Frequency difference

Schedule-A Page 40 of 53
- Maximum Phase difference Specify range
Double command blocking Specify range
Independent settable parameter groups Yes
Local Display Unit 4
Sequence of event recorder Yes
- Events
- Time resolution 256
Disturbance recording file transfer function 1 ms
Comtrade file generation function of Distrubance Recorder Yes
IED have dual connection to Ethernet switch (hot &
standby) Yes
Comprehensive self-supervision
Battery free backup of events and disturbance records Yes
Insulation tests
Fast disturbance tests Yes
MTBF Yes
MTTR IEC 60255-5
Temperature range: IED’s IEC 61000-4-4, Class 4
- Operation Hrs
- Transport and storage Hrs
Relative humidity:
- Operating max./min ℃ -10 to +50
- Transport and storage ℃ -10 to +50

% 93
% 93
16. Back up control mimic – LV (132kV)
Control functionality:
Control of breaker as well as all isolators/earthing Yes
switches
Separate backup control mimic provided for each bay Yes
& feeder
17. System Performance:
Exchange of display (First reaction) <1s
Presentation of a binary change in the process display < 0.5 s
Presentation of an analogue change in the process <1s
display
From order to process output < 0.5 s
From order to updated of display < 1.5 s

Schedule-A Page 41 of 53
APPENDIX A10

SCHEDULE OF TECHNICAL REQUIREMENTS OF


FIBRE OPTIC MULTIPLEXER EQUIPMENT

SL.No. DESCRIPTION UNIT REQUIRED

1.0 GENERAL:
1.1 Type of multiplexer SDH: ADM
1.2 Complying to ITU-T rec. Yes
1.3 Transmission Capacity Mbit/s STM-4 & STM-16
1.4 Access capacity on 64 kbit/s channels Minimum 200
1.5 Access capacity on 2 Mbit/s channels Minimum 40
1.6 Redundant central processor Shall be available
1.7 Digital cross connect function Fully non-blocking
2.0 Available AGGREGATES:
2.1 Optical aggregates (ITU-T G.957) L-1.1, L-1.2
3.0 Available TRUNK INTERFACES:
3.1 HDB3, 2 Mbit/s interfaces per module No. Minimum 8
3.2 Complying to ITU-T rec. G.703, transparent
G.704, selectable
3.3 HDSL, 2Mbit/s interface: no of copper wires No. 4 or 2
Capacity on 2Mbit/s or on 1Mbit/s ch 30 or 15
ch / pair of wire
Capacity selectable 30 / 2 pairs
30 / 1 pair
15 / 1 pair
4.0 Available USER INTERFACES
4.1 Voice interfaces for trunk lines:
4.1.1 1 + 1 com path protection, available for all yes
4.1.2 Analogue, 4wire with E&M: Input level dBr +7.5 .. –16
Output level +7.0 .. –16.5
4.1.3 Analogue, 2wire with E&M: Input level dBr +6.5 .. –12.5
Output level –1.0 .. -20
4.1.4 Digital, 2Mbit/s CAS or PRI yes
4.2 Voice interfaces for remote subscriber:
4.2.1 2wire, subscriber side dBr -5 .. +4 / -7.5 .. -1
4.2.2 2wire, PABX side dBr -5 .. +4 / -7.5 .. -3
4.3 Integrated teleprotection
4.3.1 Interface for Commands:
4.3.1.1 Number of independent commands No. 4
4.3.1.2 Transmission time max. ms 6
4.3.1.3 Signal voltage Vpeak 250

Schedule-A Page 42 of 53
4.3.1.4 1 + 1 com path protection yes
4.3.2 Interface(s) for Differential Protection:
4.3.2.1 Electrical interface: G.703 kbit/s 64
4.3.2.2 Optical Interface kbit/s Minimum 64
4.4 Data: channels per module
4.4.1 1 + 1 com path protection, available for all yes
4.4.2 V.24/V.28 (RS-232): up to 38.4kbit/s No. 4
4.4.3 V.11/X.24 (RS-422): 64kbit/s No. 4
4.4.4 V.35: 64kbit/s No. 4
4.4.5 V.36 (RS-449): 64kbit/s No. 2
4.4.6 G.703: 64kbit/s No. 8
4.4.7 Ethernet: 10/100 BaseT No. 1
Mbit/s
WAN capacity Min: 2x 2Mbit/s
Protocols Min.: IP
4.5 Integrated alarm gathering module:
4.5.1 Number of external alarms per module No. Min. 20
4.5.2 Auxiliary power supply for ext. contacts Yes
4.6 Network Management System
4.6.1 Type/Name of configuration tool
4.6.2 For fault / configuration management Yes / yes
4.6.3 For local / remote operation Yes / yes
4.6.4 Data communication network (DCN) Ethernet / IP or
Ethernit / OSI
4.7 Ambient Conditions:
4.7.1 Storage: ETS 300 019-1-1, class 1.2 °C / % hum -25 .. + 55 / class 1.2
4.7.2 Transport: ETS 300 019-1-2, class 2.2 °C / % hum -25 .. + 70 / class 2.2
4.7.3 Operation: ETS 300 019-1-3, class 3.1E °C / % hum -5 .. +45 / class 3.1E
4.8 Power Supply
4.8.1 Operation VDC 48 / 60 (-15/+20%)
4.8.2 Fully redundant power supply yes

Schedule-A Page 43 of 53
APPENDIX A11

SCHEDULE OF TECHNICAL REQUIREMENTS OF


OPERATIONAL TELEPHONE SYSTEM (PABX)

SL.No. DESCRIPTION UNIT REQUIRED


1.0 GENERAL:
1.1 Type IP PABX
1.2 Complying to ITU-T rec. Yes
1.3 Analogue Trunk Connectivity Yes
1.4 Digital Trunk Connectivity(E1/T1) Yes
1.5 10/100 BaseT Ethernet Connection Yes
1.6 No of Subscribers No. Up to 32
2.0 Trunk Connectivity
2.1 Analogue Trunk
2.1.1 - Loop Start/Ground Start(Via peripheral) Yes
2.1.2 - E&M Yes
2.1.3 - DID(Direct Inward Dial) Yes
2.2 Digital Trunk
2.2.1 - T1 Yes
2.2.2 - E1 Yes
2.2.3 - ISDN Connectivity using BRI/PRI Yes
2.3 IP Trunk
2.3.1 - 10/100 Mbps Ethernet(IEEE 802.3) Yes
2.3.2 - TCP/IP, H.323, T.38(Switching) Yes
2.3.3 - Voice Compressor : G.711, G729 Yes
2.3.4 - QoS(Quality of Signal) : 802.1 Yes
2.3.5 - SIP(Session Initiation Protocol): RFC 3261 Yes
3.0 Main Features
3.1 - Ring Back Yes
3.2 - Call Forwarding, park, waiting, pick-up Yes
3.3 - Call/Message waiting lamp Yes
3.4 - Hands Free operation Yes
3.5 - Speed Calling, Stored number redial Yes
3.6 - Account Code Yes
3.7 - Automatic Attendant, Auto Answer Yes
3.8 - Automatic Route Selection Yes
3.9 - Call-by-call Service, Call Duration Display Yes
3.10 - Call Transfer, Direct Outward Dialing Yes

Schedule-A Page 44 of 53
3.11 - Hunt Group, Music on Hold Yes
3.12 - Night Service, Off-hook Alarm, Redial Yes
4.0 Network Management System
4.1 Type/Name of configuration tool
4.2 For fault / configuration management Yes / yes
4.3 For local / remote operation Yes / yes
4.4 Data communication network (DCN) Ethernet / IP or
Ethernet / OSI
5.0 Ambient Conditions:
5.1 Storage: ETS 300 019-1-1, class 1.2 °C / % hum -25 .. + 55 / class 1.2
5.2 Transport: ETS 300 019-1-2, class 2.2 °C / % hum -25 .. + 70 / class 2.2
5.3 Operation: ETS 300 019-1-3, class 3.1E °C / % hum -5 .. +45 / class 3.1E

APPENDIX A 12

SCHEDULE OF TECHNICAL REQUIREMENTS OF


POST INSULATOR
1 Rated Voltage 420kV 145kV 36kV
2 Lightning impulse withstand positive and 1425 650 170
negative (kVp) (Dry and wet)
3 Switching impulse withstand voltage (kVp) 1050 - -
4 One min. power freq. withstand voltage (kVrms) (Wet 650 275 70
and Dry)
5 Total creepage distance (mm) pedestal 10500 3625 900
6 Total min. cantilever strength (kg)[To be confirmed by 1000 800
the Contractor with Calculation during execution of
the project]
7 Corona extinction voltage (kVrms) 320
8 Total min. height of insulator (mm) 3500 2500

APPENDIX A13

SCHEDULE OF TECHNICAL REQUIREMENTS OF


STRING INSULATOR
1 Rated voltage 420kV 145kV
2 Type Anti FOG Anti FOG
3 Size of insulators units (mm) 255 x 145 255 x 145

Schedule-A Page 45 of 53
4 Creepage distance of individual insulator unit 430 430
(Minimum or as required to obtain total
creepage distance, mm)
5 Electromechanical strength (kN) 120 120
6 Power frequency withstand voltage of the 650 275
complete string (kVrms)
7 Lightning impulse withstand voltage of the 1425 650
complete string with C.C. ring (Dry and wet, kVp)
8 Switching surge withstand voltage of the complete 1050 -
string with C.C. rings(Dry & wet, kVp)
9 Power frequency puncture withstand voltage for a 1.3 times the 1.3 times the
string insulator unit actual wet actual wet
flashover flashover
voltage of voltage of
the unit. the unit.
10 Minimum corona extinction voltage level of the complete 320 ---
string with C.C. ring (Dry, kVrms)
11 R.I.V. Level of the complete string with C.C. ring. 1000 500
(micro V)
12 Total creepage distance of complete insulator 10500 3625
string (mm)

APPENDIX A14
SCHEDULE OF TECHNICAL REQUIREMENTS
DIGITAL FAULT AND DISTURBANCE RECORDER [DFDR]
FOR GOPALGANJ 400/132KV SUBSTATION
. Sl. ITEM UNITS
(A) GENERAL

1 Manufacturer’s name & address


2 Type
3 Power Supply VDC 110
-Power supply for printer VAC 230

(B) ANALOGUE INPUTS

1 Number of Channel 128 for 400kV and 120 for 132kV

-Expandability Min. 136

2 Nominal Current Amp 1A/5A


3 Nominal voltage Vac/Vdc
Schedule-A Page 46 of 53
- Current mA/Amp
4 Frequency response
5 Cut-off frequency
(a) Bandwidth dB
(b) Attenuation at dB
(c) Auto adjusted anti-aliasing filters for Yes/No Yes
chosen sampling rate
d Simultaneously programmable sampling Min 2 for FAST and SLOW
rate for all feeders/inputs Recording
-Locally Changeable Yes/No
-Remotely Changeable Yes/No Yes
Yes
e Possible sampling rates 3 different samplig rates:
Samples/sec Slow. 1Hz-500Hz
Samples/sec fast: 0.5 kHz – 6kHz
Samples/sec continuous (variable rate)
6 DC coupled inputs Yes/No Yes
7 Resolution bits 12 or better
8 Accuracy % Min 0.5
9 Burden
1. Current Circuit at IN VA
2. Voltage Circuit VA
10 Over load
1. Current % In 100% In continuously, Min 600 %
2. Voltage circuit % Vn in for 1 Second
2Vn and max. 350 Vn
(C) DIGITAL INPUTS
1 Number of Channel 384 for 400kV and 360 for 132kV
min. 360
-Expandability (Without and time skew)
2 Selectable input level Vdc N/O or N/C, 110 VDC
3 Type Potential or potential free contact
4 Resolution ms

(D) MEMORY

1 Size MB 64 MB or Higher
2 Type Solid State
3 Pre-fault time (fast scanning rate) sec 0.1-2 user programmable
4 Post-fault (fast scanning rate sec 0.1-2 user programmable
5 Pre and Post-fault time (slow scanning sec min. 180 user programmable
rate)
Schedule-A Page 47 of 53
6 In-Built hard disk (auto-maintained GB min. 4 GB

Sl. ITEM UNITS


(E) SENSORS/ TRIGERRING CRITERIA

All sensors/trigerrs are preferable Yes/No Yes


Programmable and Virtually recordable
1. Logical combination sensor Yes/No Yes
2. Three phase over or under Voltage / Current Yes/No Yes
3. Mono phase over or under Voltage / Current Yes/No Yes
4. *du/dt, dp/dt, dq/dt, [Single/3 Phases], df/dt. etc. Yes/No Yes
5. RMS [Voltage / Current] Yes/No Yes
6. Zero Sequence Yes/No Yes
7. Negative, Positive Sequence Yes/No Yes
8. Frequency Yes/No Yes
9. DC Step Yes/No Yes
10. Pendling / Swing Yes/No Yes
11. Digital level and edge Yes/No Yes
12. Sensor trigger Yes/No Yes
13. Event Trigger Yes/No Yes
14. Manual Trigger Yes/No Yes
15. Remote Trigger Yes/No Yes

(F) CLOCK SYSTEM

1. Internal Clock Yes/No Yes


2. Accuracy
3. External Synchronization Yes/No Yes
4. Time resolution between 2 synchronized
pulses

(G) OUTPUT ALARM RELAY CONTACT

1. Max. operation Voltage DC/AC Vac / Vdc 250 Vac or above, 60 Vdc or
above
2. Make and carry for 0.5 sec A Min 8A
3. Carry Continuously A Min 5A
4. Break ( DC ) – resistive W

(H) INTERFACE FOR DATA COMMUNICATION

1. Full definition compression Yes/No Yes


Schedule-A Page 48 of 53
2. Maximum transmission rate bits / Sec
3. Standard serial port ( EIA-232-D) Yes / No Yes
4. Printer Port Yes/No Yes
5. Dedicated serial port for modem Yes/No Yes

(I) PRINTER DATA

1. Printer amplitude (scaling peak to peak)


2. Time Scal (mm / s )
3. Printer resolution mm
4. Auto printing Yes/No Yes

(J) Fault Priority transmission Yes/No Yes

(K) Fault location (distance calculation) Yes/No Yes

(L) Test certificates from internationally Yes/No Yes


recognized Laboratories

(M) COMMUNICATION AND REMOTE ANALYZING


UNIT

1. Processor Pentium (MHz) Yes, at least 450 MHz Pentium


Yes/No
2. Co-Processor Pentium Yes/No Yes
3. Main memory capacity (Mb) Yes, at least 64 MB
Yes/No
4. Color graphics board S-VGA Yes/No Yes
5. Screen S-VGA Yes/No Yes
6. Hard disk unit Yes/No Yes, at least 40 GB
7. Printer Yes/No Yes
8. Modem Yes/No Yes.
*Note: du/dt=Change of voltage, dp/dt=Change of active power, dq/dt=change of reactive power, df/dt=Change of frequency.

Schedule-A Page 49 of 53
APPENDIX A15
SCHEDULE OF TECHNICAL REQUIREMENTS of
WAVE TRAP
FOR GOPALGANJ 400/132KV SUBSTATION
15.1 400 kV WAVE TRAP
Sl Item Specification
No
1. Type of Line Trap Installation To be inserted into high voltage A.C transmission
line phase in series
2. Type of mounting Pedestal
3. Suitable for system Frequency --50Hz--

4. Nominal System Voltage 400 KV


5. Highest System Voltage 420 KV
6. Rated Continuous Current 4000 A
7. Rated Short time current for 1 second 50kA
8. Asymmetrical peak value of the First half 127.5 KA
wave of the rates short Time current
9. Rated inductance 1.0 mH
10. Type of Tuning Band tuned line trap
11. Blocking Band frequency range Band-I 56 to 124 KHZ
Band- II 76 to 500 KHZ
12. Minimum Guaranteed resistive Component 500 Ohm
of impedance in Blocking Frequency Rang
13. Protective device a) Non-linear resistive type Gapped
lightning arresters for A.C system.
b) Polymer housed Metal oxide surge
arrester without Gaps for A.C system.
14. Nominal discharge current of protective 10 KA. However, Co-ordination shall
device be done by taking 20KA 8/20 micro-
sec discharge in to consideration.
15. Rated voltage of protective device >15.72 KV rms
16. Minimum value of power frequency spark >23.58KV rms
over voltage (Dry & wet) of protective
device
17. Visual Corona Extinction Volt 320 KV rms
18. Radio influence Voltage (RIV) <500 micro Volt@280 KV
19. Attention in tuned frequency band <7.5 dB
20. Maximum tapping loss over blocking Band I 2.6 dB
& II stated above
21. Insulation class Class F Insulation
22. Maximum working stress Twice the weight of wave trap+500Kgs.

Schedule-A Page 50 of 53
APPENDIX A16
SCHEDULE OF TECHNICAL REQUIREMENTS of
SHUNT REACTOR
FOR GOPALGANJ 400/132KV SUBSTATION

16.1 400 kV SHUNT REACTOR

SL Description Unit Required data


1. Name of manufacturer
2. Model
3. Service conditions:
- External cooling medium - Air
- Altitude not exceeding M 150
- Air temperature not exceeding ℃ 45
Average air temperature in any
one year not exceeding:
- In any one day ℃ 35
- Average in one year
℃ 25

4. Rated voltage kV 420


5. Rated lightning impulse withstand voltage
- HV kV 1425
- Neutral (To be filled)
6. Rated switching impulse withstand voltage
- HV kV 1050
- Neutral NA
7. Rated power Frequency withstand voltage kV
- HV 650
- Neutral (To be filled)
8. Vector Group Grounded Wye
9. Method of Earthing Solidly Earthed
10. Maximum temperature Rise
- windings ℃
- Top oil
- Hot spot of Core
11. Total Losses at rated voltage & frequency
- Core Loss kW (To be filled)
- Cupper Loss
- Total
12. Cooling ONAN
13. Rated Power at Rated voltage & frequency MVar 25 (For Bidding

Schedule-A Page 51 of 53
SL Description Unit Required data
purpose only)
14. Rated Current A (To be filled)
15. Rated reactance/phase (To be filled)
16. Zero sequence reactance (To be filled)
17. Mutual Reactance (To be filled)
18. Linearity Range of magnetic circuit percent to rated % (To be filled)
voltage
19. Reactance during saturation percent to rated % (To be filled)
reactance
20. Harmonics % (To be filled)
- Even
- Total
21. Core Design Gapped/Air (To be filled)
Core
22. No. of Core No’s (To be filled)
23. Material & type of Core (To be filled)
24. Type of winding (To be filled)
25. Winding Connection brazed or crimped (To be filled)
26. Type of Insulation Non/Uniform
- HV side (To be filled)
- Neutral side
27. Flux Density at Rated voltage & frequency
- Core T (To be filled)
- Yokes
28. Volts per turn V/t (To be filled)
29. Efficiency % (To be filled)
30. Regulation
- At unity power factor % (To be filled)
- At 0.8 lagging power factor
31. Bushing Current Transformer
-Ratio --
-Class -- 5P20
-Burden VA 30 ( Actual value
shall be as per
calculation during
execution)
32. Maximum Sound Pressure level dB 78
33. Oil Type (To be filled)
34. Weight of Active part kg (To be filled)
35. Weight of Oil* kg (To be filled)
36. Total weight* kg (To be filled)

Schedule-A Page 52 of 53
SL Description Unit Required data
37. Heaviest part for shipment kg (To be filled)
*These values are required for Foundation design & shipping purpose only.During detail design,
these values may vary from Bid value due to attaining desired electrical output.

Schedule-A Page 53 of 53
DESIGN, SUPPLY, ERECTION, TESTING & COMMISSIONING OF GOPALGANJ 400/230KV SUBSTATION ON TURNKEY
Schedule B1: Price for Itemised Works, Goods or Services Supplied from Outside the Employer's Country
Unit Qty Country Unit Price1 Total Price1
of origin
Item Description
CIP CIP

1 2 3=1x2
1A 420 kV Air Insulated Switchgear
1A.1 SF6 Circuit breaker,4000A, 50kA/1s, live tank, gang operating set 6
1A.2 SF6 Circuit breaker, 4000A,50kA/1s, live tank, single pole operating set 8
1A.3 Disconnector switch with E/S , 4000A,50kA/1s set 6
1A.4 Disconnector switch without E/S, 4000A,50kA/1s set 31
1A.5 Busbar grounding Switch set 2
1A.6 Single phase current transformer, 6 core, 4000/1,50kA/1s nos. 66
1A.7 Single phase capacitive voltage transformer,3- core nos. 33
1A.8 Single phase surge arrester,390kV rated,10kA nos. 33
1A.9 Wave Trap,single phase, 420kV, 4000A, 1mH,50kA/1s nos. 12
1A.10 Post type support insulators for 400kV busbar and switchgear lot 1
Rigid tubular bus and required conductors, insulators, fittings including all necessary clamps
1A.11
and connectors for busbar compositions
i) Rigid Tubular Bus lot 1
ii) _Flexible Conductor for jumper, equipment connections lot 1
iii) _Insulator lot 1
iv) _Fittings lot 1
1A.12 Steel Structures for gantry and equipment supports
a) _Gantry Column including nut & bolts
i) For Main Bus nos. 11
ii) For Jack-Bus nos. 14
b) _Gantry beam at Main Bus & Jack-Bus height including nut & bolts nos.
c) _Equipment support structures including nut & bolts
i) CB set 14
ii) DS with ES set 6
iii) DS without ES set 31
iv) Bus ES set 2
v) CT nos. 66
vi) CVT/IVT nos. 33
vii) LA nos. 33
viii) Wave Trap nos. 12
ix) PI lot 1
d) _Cable tray including fitting, fixing accessories lot 1
1B 245 kV Air Insulated Switchgear
Deleted
1C 145 kV Air Insulated Switchgear
1C.1 SF6 Circuit breaker,1600A,40kA/1s, live tank, gang operating for Transformer Bay set 3
1C.2 SF6 Circuit breaker,1250A, 40kA/1s,live tank, single pole operating for Line Bay set 8
1C.3 SF6 Circuit breaker,3000A,40kA/1s, live tank, gang operating for Bus Coupler Bay set 1
1C.4 Disconnector switch without E/S, 1600A,40kA/1s for Transformer Bay set 9
1C.5 Disconnector switch without E/S, 1250A,40kA/1s for Line bay set 16
1C.6 Disconnector switch without E/S, 3000A,40kA/1s set 2
1C.7 Disconnector switch with E/S, 1250A,40kA/1s set 8
1C.8 Single phase current transformer,1600/1, 4-core,40kA/1s nos. 9
1C.9 Single phase current transformer,1250/1, 4-core,40kA/1s nos. 24
1C.10 Single phase current transformer,3000/1, 2-core,40kA/1s nos. 6
1C.11 Single phase capacitive voltage transformer (CVT), 3-core nos. 39
1C.12 Single phase surge arrester, 120kV rated,10kA nos. 33
Flexible conductorsfor bus and jumper, insulators, fittings including all necessary clamps and
1C.13
connectors for busbar compositions
i) _Flexible Conductor for Bus, jumper, equipment connections lot 1
ii) _Insulator lot 1
iii) _Fittings lot 1
Sub-Total Price carried forward
Sub Total Price in words............................................................................................................................................................................

Schedule B: Bid Price


DESIGN, SUPPLY, ERECTION, TESTING & COMMISSIONING OF GOPALGANJ 400/132kV SUBSTATION ON TURNKEY
Schedule B1: Price for Itemised Works, Goods or Services Supplied from Outside the Employer's Country
1 1
Unit Qty Country Unit Price Total Price
of origin
Item Description
CIP CIP

1 2 3=1x2
Sub-Total brought forward
1C.14 Steel Structures for gantry and equipment supports
a) _Gantry Column including nut & bolts
i) For Main Bus nos. 5
ii) For Jack-Bus nos. 20
b) _Gantry beam at Main Bus & Jack-Bus height including nut & bolts nos.
c) _Equipment support structures including nut & bolts
i) CB set 12
ii) DS without ES set 27
iii) DS with ES set 8
iv) Bus ES Deleted
v) CT nos. 39
vi) CVT/IVT nos. 39
vii) LA nos. 33
viii) Wave Trap Deleted
ix) PI Deleted
d) _Cable tray including fitting, fixing accessories lot 1
1D 33kV Switches & connection
1D.1 33kV Vacuum Circuit breaker set 2
1D.2 33kV Disconnector switch set 4
1D.3 33kV Inductive voltage transformer (IVT), 2 core nos. 6
1D.4 Single pahse surge arrester, 30kV rated,10kA nos. 6
Tertiary side connection including necessary fittings, structures, 33kV XLPE cable and
1D.5 lot 1
conductors (for two 400kV power transformer)
1E Power Transformer & Earthing/Auxiliary Transformer
1E.1 400/135/33 kV, 250/325MVA (ONAN/ONAF), three phase Power Transformer set 3
1E.2 33/0.4 kV, 500kVA auxiliary Transformer set 2
1F Control, Protection, SAS and Metering
420kV Circuits
1F.1 Control, Protection,monitoring & SAS for overhead line circuits set 6
1F.2 Control, monitoring, Protection, monitoring & SAS for Auto transformer circuits set 3
1F.3 Busbar Protection set 1
1F.4 DFDR Set 1
1F.5 Tarif metering lot 1
145kV Circuits
1F.6 Control, Protection,monitoring & SAS for overhead line circuits set 8
1F.7 Control, Protection,monitoring & SAS for Auto transformer circuits set 3
1F.8 Control, Protection,monitoring & SAS for Bus Coupler circuits set 1
1F.9 Busbar Protection set 1
1F.10 Tariff metering lot 1
36kV Circuit
1F.11 Control, Monitoring, Protection & SAS for 33kV station power system lot 1
1F.12 Tariff metering lot 1
1G Multicore Cables
1G.1 Multicore Cables for control, protection, metering & power circuits
i) _LV Control Cable lot 1
ii) _LV Power Cable lot 1
Sub-Total Price carried forward
Sub Total Price in words............................................................................................................................................................................
Schedule B: Bid Price
DESIGN, SUPPLY, ERECTION, TESTING & COMMISSIONING OF GOPALGANJ 400/132kV SUBSTATION ON TURNKEY
Schedule B1: Price for Itemised Works, Goods or Services Supplied from Outside the Employer's Country
1 1
Unit Qty Country Unit Price Total Price
of origin
Item Description
CIP CIP

1 2 3=1x2
Sub-Total brought forward
1H Earthing and Lightning Protection
1H.1 _Earthing system for complete substation lot 1
1H.2 _Lighting Protection System for complete substation lot 1
1H.3 Portable(maintenance) earthing equipment device set 2
1I Batteries, chargers & DC distribution
1I.1 110V Ni-cad Batteries with chargers & distribution board (including 2 sets 1.5kVA UPS) lot 1
a) for 400kV System
i) _110V Battery Banks, 350Ah set 1
ii) _Charger 120A set 1
b) for 132kV System
i) _110V Battery Banks, 300Ah set 1
ii) _Charger 100A set 1
iii) _110V DC Distribution panel, MCC type lot 1
1I.2 48V Ni-cad Batteries with chargers & distribution board
i) _48V battery Banks,250Ah set 1
ii) _Charger 100A set 1
iii) _48V DC Disatribution Panel lot 1
iv) _Inverter (1.5kVA, 30 mins) for SAS set 1
1J LVAC Distribution
1J.1 _AC 415V or 240V distribution panels (MCC type) lot 1
1J.2 _UPS (3kVA, 30min) for SAS Deleted
1J.3 _Tariff metering at LV side(Main & Check) lot 1
1K Civil Works, Building and Foundation Refer to Schedule B4
1L Lighting, small power, air conditioning and Ventilation
Lighting, small power, air conditioning and Ventilation and emergency DC lighting for control
1L.1 lot 1
building and local control houses
Lighting for ouside building for security, roadway, switchyard and emergency DC lighting
1L.2 lot 1
Fibre Optic Multiplexer Equipment and PLC Equipment for Communication and
1M
Protection
1M.1 Indoor Fibre Optic Multipexer Equipment lot 1
1M.2 PABX lot 1
under ground optical fiber cable, armoured, 48/24 core including Outdoor termination
1M.3 lot 1
box,indoor MDF & pigtail cables
1M.4 PLC Equipment lot 1
1N SCADA system for Telecontrol and Telemetering
1N.1 Complete SCADA hardware & software lot 1
Total Price carried to Summary of Price Schedule
Total Price in words............................................................................................................................................................................
Schedule B: Bid Price
DESIGN, SUPPLY, ERECTION, TESTING & COMMISSIONING OF GOPALGANJ 400/132kV SUBSTATION ON TURNKEY
Schedule B1: Price for Itemised Works, Goods or Services Supplied from Outside the Employer's Country
1 1
Unit Qty Country Unit Price Total Price
of origin
Item Description
CIP CIP

1 2 3=1x2
Works and Equipment for Shunt Reactor Installation as specified in Section 16 of the
3A
Technical Specification
3A.1 EMTP study Please refer to schedule B3
400kV, 25MVAR, ONAN Three phase outdoor type Shunt Reactor.For change in MVar size
of Shunt Reactor during execution based on EMTP study, the price shall be adjusted as
3A.2 follows: set 4
P_N=20%×P_0±80%×P_0×(New Size)/(Old Size)

3A.3 SF6 Circuit breaker, live tank, gang operating set 4


3A.4 Disconnector switch without E/S, 2000A set 4
Control, Protection, Monitoring & Substation Automation System including event recording
3A.5 set 4
fuction
Rigid tubular bus and/or flexible conductors, insulators, fittings including all necessary clamps
3A.6 and connectors required for completing switchgear connection for Shunt Reactor bay lot 1

Steel Structures for equipment supports and civil works required for completing switchgear
3A.7 lot 1
for Shunt Reactor bay
i) CB nos 3
ii) DS without ES nos 3
Total Price carried to Summary of Price Schedule

Total Price in words............................................................................................................................................................................


DESIGN, SUPPLY, ERECTION, TESTING & COMMISSIONING OF GOPALGANJ 400/132kV SUBSTATION ON TURNKEY
Schedule B1: Mandatory Spare, Maintanence & Test Equipement Supplied from Outside the Employer's Country
Unit Qty Country Unit Price1 Total Price1
of origin
Item Description
CIP CIP

1 2 3=1x2
420 kV SWITCHGEAR
1 Complete SF6 gas, livetank type 420kV Circuit Breaker (single-pole operation type) set 1
2 Complete 420kV disconnector switch sets 1
Set of interrupting chamber including insulators, fixed and moving contacts for 420kV offered
3 sets 2
type circuit breaklers
4 420 kV post insulators suitable for disconnector nos. 3
5 Set (three phase) contacts for 420kV disconnector sets 2
6 390 kV surge arrester nos. 6
7 420kV capacitive voltage transformer nos. 3
8 Closing coils nos. 3
9 Tripping coils nos. 3
10 Motor for 420kV circuit breaker operating mechanism nos. 2
11 Motor for disconnector drive nos. 2
12 Coils for Blocking magnet in disconnector drive nos. 3
145 kV SWITCHGEAR
13 Complete SF6 gas, livetank type 145kVCircuit Breaker (single-pole operation type) set 2
14 Complete 145 kV disconnector switch sets 2
Set of interrupting chamber including insulators, fixed and moving contacts for 145kV offered
15 sets 2
type circuit breaklers
16 145 kV post insulators suitable for disconnector nos. 3
17 Set (three phase) contacts for 145 kV disconnector sets 2
18 120 kV surge arrester nos. 6
19 145 kV capacitive voltage transformer nos. 3
20 Closing coils nos. 3
21 Tripping coils nos. 3
22 Motor for 145 kV circuit breaking operating mechanism nos. 2
23 Motor for disconnector drive nos. 2
24 Coils for Blocking magnet in disconnector drive nos. 3
TRANSFORMERS
37 Auto-transformer 420kV bushings nos. 1
38 Auto-transformer 145 kV bushings nos. 1
39 deleted
40 Earthing transformer 36 kV bushings nos. 1
41 Sets of auto transformer gaskets sets 1
42 Sets of earthing transformer gaskets sets 1
43 Sets of tap changer spares sets 1
44 Set of special tools, gauges and spanners (Bidders to give details) set 1
45 Spare transformer oil kg 32000
46 Silica gel 100% spare lot 1
Transformer oil treatment plant, 8000litre/hr
47 set 1
(Clause 4.13.2)
Sub-Total Price carried forward

Sub Total Price in words............................................................................................................................................................................

Schedule B: Bid Price


DESIGN, SUPPLY, ERECTION, TESTING & COMMISSIONING OF GOPALGANJ 400/132kV SUBSTATION ON TURNKEY
Schedule B1: Mandatory Spare, Maintanence & Test Equipement Supplied from Outside the Employer's Country
1 1
Unit Qty Country Unit Price Total Price
of origin
Item Description
CIP CIP

1 2 3=1x2
Sub-Total brought forward
WATER SPRAY SYSTEM
48 Warter spray nozzles nos. 10
49 Release sprinklers nos. 5
50 Set of internal parts of deluge valve set 1
51 Set of sealings for deluge valves of each type set 1
52 Set of sealings for pipes and flanges set 1
53 Set of spare parts for jockey pump set 1
54 Set of spare parts for control panel and automatic level indicator set 1
55 Set of spare parts for the air supply and reducing devices set 1
56 Fire fighting pump complete with coupling set 1
PROTECTION, CONTROL, METERING
57 Distance relay set 1
58 Current differential relay set 1
59 Biased different relay (3-phase) set 1
60 Two pole overcurrent and earth fault relay sets 2
61 Tripping relay (electrical reset) sets 3
62 Trip circuit supervision relay sets 3
63 Ammeter nos. 3
64 Voltmeter nos. 3
65 Annunciator bulbs nos. 60
66 Bulbs for discrepancy switches nos. 30
67 kWh & kVarh meter nos. 1
POWER & CONTROL CABLES
Spare cable comprising:
68 control cable, 7 core meter 500
69 control cable, 12 core meter 500
Batteries, Chargers, & DC Distribution
70 Battery fuses nos. 4
71 Set DC board incoming MCCB sets 2
72 Sets outgoing MCBs sets 4
73 Battery Charger complete unit, 110V Deleted
LV AC SWITCHGEAR
74 3-phase set LVAC board incoming MCCB no. 1
75 3-phase sets outgoing MCCBs nos. 3
76 1-phase sets outgoing MCBs nos. 3
Fiber Optic Multiplexer Equipment
77 Set of spare modules of necessary function lot 1
TEST and O&M EQUIPMENT
78 Set of gas filling equipment and 1 bottle of SF6 gas sets 3
79 SF6 gas sniffer sets 2
80 Portable vacuum pump suitable for SF6 circuit breaker set 1
81 Contact resistance measurement test set (suitable for measurement down to 1 µ ohm at 10A
set 1
d.c.)
82 5 kV insulation resistance test set (range 0.5 –1.0 - 2.5 - 5 kV) sets 1
83 Earth resistance test set (range 10-100-1000 ohm: min scale division 0.1 ohm) sets 1
84 Clip-on mA meter (for spill current) nos. 1
85 Portable Earthing Leads sets 6
Total Price carried to Summary of Price Schedule

Total Price in words............................................................................................................................................................................

Schedule B: Bid Price


DESIGN, SUPPLY, ERECTION, TESTING & COMMISSIONING OF GOPALGANJ 400/132kV SUBSTATION ON
TURNKEY BASIS [CONTRACT NO.PGCB/ADB/400kV/GOPAL-SS]
Schedule B2: Price for Itemised Works, Goods or Services Supplied from within the Employer's country
Unit Qty Country Unit Price1 Total Price1
Item Description of origin

1 2 3=1x2
1A 420 kV Air Insulated Switchgear
1A.1 SF6 Circuit breaker,4000A, 50kA/1s, live tank, gang operating set 6
1A.2 SF6 Circuit breaker, 4000A,50kA/1s, live tank, single pole operating set 8
1A.3 Disconnector switch with E/S , 4000A,50kA/1s set 6
1A.4 Disconnector switch without E/S, 4000A,50kA/1s set 31
1A.5 Busbar grounding Switch set 2
1A.6 Single phase current transformer, 6 core, 4000/1,50kA/1s nos. 66
1A.7 Single phase capacitive voltage transformer,3- core nos. 33
1A.8 Single phase surge arrester,390kV rated,10kA nos. 33
1A.9 Wave Trap,single phase, 420kV, 4000A, 1mH,50kA/1s nos. 12
1A.10 Post type support insulators for 400kV busbar and switchgear lot 1
Rigid tubular bus and required conductors, insulators, fittings including all necessary
1A.11
clamps and connectors for busbar compositions
i) Rigid Tubular Bus lot 1
ii) _Flexible Conductor for jumper, equipment connections lot 1
iii) _Insulator lot 1
iv) _Fittings lot 1
1A.12 Steel Structures for gantry and equipment supports
a) _Gantry Column including nut & bolts
i) For Main Bus nos. 11
ii) For Jack-Bus nos. 14
b) _Gantry beam at Main Bus & Jack-Bus height including nut & bolts nos.
c) _Equipment support structures including nut & bolts
i) CB set 14
ii) DS with ES set 6
iii) DS without ES set 31
iv) Bus ES set 2
v) CT nos. 66
vi) CVT/IVT nos. 33
vii) LA nos. 33
viii) Wave Trap nos. 12
ix) PI lot 1
d) _Cable tray including fitting, fixing accessories lot 1
1B 245 kV Air Insulated Switchgear
Deleted
1C 145 kV Air Insulated Switchgear
1C.1 SF6 Circuit breaker,1600A,40kA/1s, live tank, gang operating for Transformer Bay set 3
1C.2 SF6 Circuit breaker,1250A, 40kA/1s,live tank, single pole operating for Line Bay set 8
1C.3 SF6 Circuit breaker,3000A,40kA/1s, live tank, gang operating for Bus Coupler Bay set 1
1C.4 Disconnector switch without E/S, 1600A,40kA/1s for Transformer Bay set 9
1C.5 Disconnector switch without E/S, 1250A,40kA/1s for Line bay set 16
1C.6 Disconnector switch without E/S, 3000A,40kA/1s set 2
1C.7 Disconnector switch with E/S, 1250A,40kA/1s set 8
1C.8 Single phase current transformer,1600/1, 4-core,40kA/1s nos. 9
1C.9 Single phase current transformer,1250/1, 4-core,40kA/1s nos. 24
1C.10 Single phase current transformer,3000/1, 2-core,40kA/1s nos. 6
1C.11 Single phase capacitive voltage transformer (CVT), 3-core nos. 39
1C.12 Single phase surge arrester, 120kV rated,10kA nos. 33
Flexible conductorsfor bus and jumper, insulators, fittings including all necessary clamps
1C.13
and connectors for busbar compositions
i) _Flexible Conductor for Bus, jumper, equipment connections lot 1
ii) _Insulator lot 1
iii) _Fittings lot 1
Sub-Total Price carried forward
Sub Total Price in words............................................................................................................................................................................
1
Specify currency in accordance with specifications in Bid Data Sheet under ITB 19.1 in Single-stage Bid. Schedule B2-1
Schedule B: Bid Price
DESIGN, SUPPLY, ERECTION, TESTING & COMMISSIONING OF GOPALGANJ 400/132kV SUBSTATION ON
TURNKEY BASIS [CONTRACT NO.PGCB/ADB/400kV/GOPAL-SS]

Schedule B2: Price for Itemised Works, Goods or Services Supplied from within the Employer's country
Unit Qty Country Unit Price1 Total Price1
Item Description of origin

1 2 3=1x2
Sub-Total brought forward
1C.14 Steel Structures for gantry and equipment supports
a) _Gantry Column including nut & bolts
i) For Main Bus nos. 5
ii) For Jack-Bus nos. 20
b) _Gantry beam at Main Bus & Jack-Bus height including nut & bolts nos.
c) _Equipment support structures including nut & bolts
i) CB set 12
ii) DS without ES set 27
iii) DS with ES set 8
iv) Bus ES Deleted
v) CT nos. 39
vi) CVT/IVT nos. 39
vii) LA nos. 33
viii) Wave Trap Deleted
ix) PI Deleted
d) _Cable tray including fitting, fixing accessories lot 1
1D 33kV Switches & connection
1D.1 33kV Vacuum Circuit breaker set 2
1D.2 33kV Disconnector switch set 4
1D.3 33kV Inductive voltage transformer (IVT), 2 core nos. 6
1D.4 Single pahse surge arrester, 30kV rated,10kA nos. 6
Tertiary side connection including necessary fittings, structures, 33kV XLPE cable and
1D.5 lot 1
conductors (for two 400kV power transformer)
1E Power Transformer & Earthing/Auxiliary Transformer
1E.1 400/135/33 kV, 250/325MVA (ONAN/ONAF), three phase Power Transformer set 3
1E.2 33/0.4 kV, 500kVA auxiliary Transformer set 2
1F Control, Protection, SAS and Metering
420kV Circuits
1F.1 Control, Protection,monitoring & SAS for overhead line circuits set 6
1F.2 Control, monitoring, Protection, monitoring & SAS for Auto transformer circuits set 3
1F.3 Busbar Protection set 1
1F.4 DFDR Set 1
1F.5 Tarif metering lot 1
145kV Circuits
1F.6 Control, Protection,monitoring & SAS for overhead line circuits set 8
1F.7 Control, Protection,monitoring & SAS for Auto transformer circuits set 3
1F.8 Control, Protection,monitoring & SAS for Bus Coupler circuits set 1
1F.9 Busbar Protection set 1
1F.10 Tariff metering lot 1
36kV Circuit
1F.11 Control, Monitoring, Protection & SAS for 33kV station power system lot 1
1F.12 Tariff metering lot 1
1G Multicore Cables
1G.1 Multicore Cables for control, protection, metering & power circuits
i) _LV Control Cable lot 1
ii) _LV Power Cable lot 1
Sub-Total Price carried forward
Sub Total Price in words............................................................................................................................................................................
1
Specify currency in accordance with specifications in Bid Data Sheet under ITB 19.1 in Single-stage Bid.
Schedule B: Bid Price Schedule B2-2
DESIGN, SUPPLY, ERECTION, TESTING & COMMISSIONING OF GOPALGANJ 400/132kV SUBSTATION ON
TURNKEY BASIS [CONTRACT NO.PGCB/ADB/400kV/GOPAL-SS]

Schedule B2: Price for Itemised Works, Goods or Services Supplied from within the Employer's country
Unit Qty Country Unit Price1 Total Price1
Item Description of origin

1 2 3=1x2
Sub-Total brought forward
1H Earthing and Lightning Protection
1H.1 _Earthing system for complete substation lot 1
1H.2 _Lighting Protection System for complete substation lot 1
1H.3 Portable(maintenance) earthing equipment device set 2
1I Batteries, chargers & DC distribution
1I.1 110V Ni-cad Batteries with chargers & distribution board (including 2 sets 1.5kVA UPS) lot 1
a) for 400kV System
i) _110V Battery Banks, 350Ah set 1
ii) _Charger 150A set 1
iii) _110V DC Distribution panel, MCC type lot 1
b) for 132kV System
i) _110V Battery Banks, 300Ah set 1
ii) _Charger 120A set 1
iii) _110V DC Distribution panel, MCC type lot 1
1I.2 48V Ni-cad Batteries with chargers & distribution board
i) _48V battery Banks,150Ah set 1
ii) _Charger 100A set 1
iii) _48V DC Disatribution Panel lot 1
iv) 1.5kVA Inverter set 1
1J LVAC Distribution
1J.1 _AC 415V or 240V distribution panels (MCC type) lot 1
_UPS (3kVA, 30min) for SAS set 2
1J.2 _Tariff metering at LV side(Main & Check) lot 1
1K Civil Works, Building and Foundation Refer to Schedule B4
1L Lighting, small power, air conditioning and Ventilation
Lighting, small power, air conditioning and Ventilation and emergency DC lighting for
1L.1 lot 1
control building and local control houses
1L.2 Lighting for ouside building for security, roadway, switchyard and emergency DC lighting lot 1
Fibre Optic Multiplexer Equipment and PLC Equipment for Communication and
1M
Protection
1M.1 Indoor Fibre Optic Multipexer Equipment lot 1
1M.2 PABX lot 1
under ground optical fiber cable, armoured, 48/24 core including Outdoor termination
1M.3 lot 1
box,indoor MDF & pigtail cables
1M.4 PLC Equipment lot 1
1N SCADA system for Telecontrol and Telemetering
1N.1 Complete SCADA hardware & software lot 1
Total Price carried to Summary of Price Schedule
Total Price in words............................................................................................................................................................................
1
Specify currency in accordance with specifications in Bid Data Sheet under ITB 19.1 in Single-stage Bid.
Schedule B: Bid Price Schedule B2-4
DESIGN, SUPPLY, ERECTION, TESTING & COMMISSIONING OF GOPALGANJ 400/132kV SUBSTATION ON
TURNKEY BASIS [CONTRACT NO.PGCB/ADB/400kV/GOPAL-SS]

Schedule B1: Price for Itemised Works, Goods or Services Supplied from within the Employer's country
Unit Qty Country Unit Price1 Total Price1
Item Description of origin

1 2 3=1x2
Works and Equipment for Shunt Reactor Installation as specified in Section 16 of
3A
the Technical Specification
3A.1 EMTP study Please refer to schedule B3
400kV, 25MVAR, ONAN Three phase outdoor type Shunt Reactor.for change in MVar size
of Shunt Reactor during execution based on EMTP study, the price shall be adjusted as
3A.2 follows: set 4
P_N=20%×P_0±80%×P_0×(New Size)/(Old Size)

3A.3 SF6 Circuit breaker, live tank, gang operating set 4


3A.4 Disconnector switch without E/S, 2000A set 4
Control, Protection, Monitoring & Substation Automation System including event recording
3A.5 set 4
fuction
Rigid tubular bus and flexible conductors, insulators, fittings including all necessary
3A.6 clamps and connectors required for completing 420kV busbar and switchgear connection lot 1
for Shunt Reactor bay
Steel Structures for gantry, equipment supports and civil works required for completing
3A.7 lot 1
420kV busbar and switchgear for Shunt Reactor bay
Total Price carried to Summary of Price Schedule
Sub Total Price in words............................................................................................................................................................................ Schedule B2-5
1
Specify currency in accordance with specifications in Bid Data Sheet under ITB 19.1 in Single-stage Bid.
DESIGN, SUPPLY, ERECTION, TESTING & COMMISSIONING OF GOPALGANJ 400/132kV SUBSTATION ON
TURNKEY BASIS [CONTRACT NO.PGCB/ADB/400kV/GOPAL-SS]

Schedule B2: Mandatory Spare, Maintanence & Test Equipement Supplied from within the Employer's country
Unit Qty Country Unit Price1 Total Price1
Item Description of origin

1 2 3=1x2
420 kV SWITCHGEAR
1 Complete SF6 gas, livetank type 420kV Circuit Breaker (single-pole operation type) set 1
2 Complete 420kV disconnector switch sets 1
Set of interrupting chamber including insulators, fixed and moving contacts for 420kV
3 sets 2
offered type circuit breaklers
4 420 kV post insulators suitable for disconnector nos. 3
5 Set (three phase) contacts for 420kV disconnector sets 2
6 390 kV surge arrester nos. 6
7 420kV capacitive voltage transformer nos. 3
8 Closing coils nos. 3
9 Tripping coils nos. 3
10 Motor for 420kV circuit breaker operating mechanism nos. 2
11 Motor for disconnector drive nos. 2
12 Coils for Blocking magnet in disconnector drive nos. 3
145 kV SWITCHGEAR
13 Complete SF6 gas, livetank type 145kVCircuit Breaker (single-pole operation type) set 2
14 Complete 145 kV disconnector switch sets 2
Set of interrupting chamber including insulators, fixed and moving contacts for 145kV
15 sets 2
offered type circuit breaklers
16 145 kV post insulators suitable for disconnector nos. 3
17 Set (three phase) contacts for 145 kV disconnector sets 2
18 120 kV surge arrester nos. 6
19 145 kV capacitive voltage transformer nos. 3
20 Closing coils nos. 3
21 Tripping coils nos. 3
22 Motor for 145 kV circuit breaking operating mechanism nos. 2
23 Motor for disconnector drive nos. 2
24 Coils for Blocking magnet in disconnector drive nos. 3
TRANSFORMERS
37 Auto-transformer 420kV bushings nos. 1
38 Auto-transformer 145 kV bushings nos. 1
39 deleted
40 Earthing transformer 36 kV bushings nos. 1
41 Sets of auto transformer gaskets sets 1
42 Sets of earthing transformer gaskets sets 1
43 Sets of tap changer spares sets 1
44 Set of special tools, gauges and spanners (Bidders to give details) set 1
45 Spare transformer oil kg 32000
46 Silica gel 100% spare lot 1
Transformer oil treatment plant, 6000litre
47 set 1
(Clause 4.13.2)
WATER SPRAY SYSTEM
48 Warter spray nozzles nos. 10
49 Release sprinklers nos. 5
50 Set of internal parts of deluge valve set 1
51 Set of sealings for deluge valves of each type set 1
52 Set of sealings for pipes and flanges set 1
53 Set of spare parts for jockey pump set 1
54 Set of spare parts for control panel and automatic level indicator set 1
Sub Total Price in words............................................................................................................................................................................
Schedule B: Bid Price Schedule B2-6
1
Specify currency in accordance with specifications in Bid Data Sheet under ITB 19.1 in Single-stage Bid.
DESIGN, SUPPLY, ERECTION, TESTING & COMMISSIONING OF GOPALGANJ 400/132kV SUBSTATION ON
TURNKEY BASIS [CONTRACT NO.PGCB/ADB/400kV/GOPAL-SS]

Schedule B2: Mandatory Spare, Maintanence & Test Equipement Supplied from within the Employer's country
Unit Qty Country Unit Price1 Total Price1
Item Description of origin

1 2 3=1x2
Sub-Total brought forward
55 Set of spare parts for the air supply and reducing devices set 1
56 Fire fighting pump complete with coupling set 1
PROTECTION, CONTROL, METERING
57 Distance relay set 1
58 Current differential relay set 1
59 Biased different relay (3-phase) set 1
60 Two pole overcurrent and earth fault relay sets 2
61 Tripping relay (electrical reset) sets 3
62 Trip circuit supervision relay sets 3
63 Ammeter nos. 3
64 Voltmeter nos. 3
65 Annunciator bulbs nos. 60
66 Bulbs for discrepancy switches nos. 30
67 kWh & kVarh meter nos. 1
POWER & CONTROL CABLES
Spare cable comprising:
68 control cable, 7 core meter 500
69 control cable, 12 core meter 500
Batteries, Chargers, & DC Distribution
70 Battery fuses nos. 4
71 Set DC board incoming MCCB sets 2
72 Sets outgoing MCBs sets 4
73 Battery Charger complete unit, 110V set 1
60 Two pole overcurrent and earth fault relay sets 2
61 Tripping relay (electrical reset) sets 3
62 Trip circuit supervision relay sets 3
63 Ammeter nos. 3
64 Voltmeter nos. 3
65 Annunciator bulbs nos. 60
66 Bulbs for discrepancy switches nos. 30
67 kWh & kVarh meter nos. 1
POWER & CONTROL CABLES
Spare cable comprising:
68 control cable, 7 core meter 500
69 control cable, 12 core meter 500
Batteries, Chargers, & DC Distribution
70 Battery fuses nos. 4
71 Set DC board incoming MCCB sets 2
72 Sets outgoing MCBs sets 4
73 Battery Charger complete unit, 110V Deleted
LV AC SWITCHGEAR
74 3-phase set LVAC board incoming MCCB no. 1
75 3-phase sets outgoing MCCBs nos. 3
76 1-phase sets outgoing MCBs nos. 3
Fiber Optic Multiplexer Equipment
77 Set of spare modules of necessary function lot 1
TEST and O&M EQUIPMENT
78 Set of gas filling equipment and 1 bottle of SF6 gas sets 3
79 SF6 gas sniffer sets 2
80 Portable vacuum pump suitable for SF6 circuit breaker set 1
81 Contact resistance measurement test set (suitable for measurement down to 1 µ ohm at
set 1
10A d.c.)
82 5 kV insulation resistance test set (range 0.5 –1.0 - 2.5 - 5 kV) sets 1
83 Earth resistance test set (range 10-100-1000 ohm: min scale division 0.1 ohm) sets 1
84 Clip-on mA meter (for spill current) nos. 1
85 Portable Earthing Leads sets 6
Total Price carried to Summary of Price Schedule
Total Price in words............................................................................................................................................................................
Schedule B: Bid Price Schedule B2-7
1
Specify currency in accordance with specifications in Bid Data Sheet under ITB 19.1 in Single-stage Bid.
DESIGN, SUPPLY, ERECTION, TESTING & COMMISSIONING OF GOPALGANJ 400/132kV SUBSTATION ON TURNKEY BASIS
[CONTRACT NO.PGCB/ADB/400kV/GOPAL-SS]

Schedule B3: Design Services

Design
Unit Qty Foreign Currency Local Currency in Taka
Item Description

All the items under this contract except EMTP study Lot 1
EMTP Study Lot 1

Schedule B3-1
DESIGN, SUPPLY, ERECTION, TESTING & COMMISSIONING OF GOPALGANJ 400/230KV SUBSTATION ON TURNKEY
BASIS [CONTRACT NO.PGCB/ADB/400kV/GOPAL-SS ]
Schedule B4 -Installation & other services
Unit Qty Country Unit Price1 Total Price1
of origin Foreign Local
Item Description Foreign Local Currency
Currency Currency
Currency Portion Portion
Portion Portion
1 2 3 (1) x (2) (1) x (3)
1A 420 kV Air Insulated Switchgear
1A.1 SF6 Circuit breaker,4000A, 50kA/1s, live tank, gang operating set 6
1A.2 SF6 Circuit breaker, 4000A,50kA/1s, live tank, single pole operating set 8
1A.3 Disconnector switch with E/S , 4000A,50kA/1s set 6
1A.4 Disconnector switch without E/S, 4000A,50kA/1s set 31
1A.5 Busbar grounding Switch set 2
1A.6 Single phase current transformer, 6 core, 4000/1,50kA/1s nos. 66
1A.7 Single phase capacitive voltage transformer,3- core nos. 33
1A.8 Single phase surge arrester,390kV rated,10kA nos. 33
1A.9 Wave Trap,single phase, 420kV, 4000A, 1mH,50kA/1s nos. 12
1A.10 Post type support insulators for 400kV busbar and switchgear lot 1
Rigid tubular bus and required conductors, insulators, fittings including all necessary clamps
1A.11
and connectors for busbar compositions
i) Rigid Tubular Bus lot 1
ii) _Flexible Conductor for jumper, equipment connections lot 1
iii) _Insulator lot 1
iv) _Fittings lot 1
1A.12 Steel Structures for gantry and equipment supports
i) _Gantry Column including nut & bolts lot 1
ii) _Gantry beam including nut & bolts lot 1
iii) _Equipment support structures including nut & bolts lot 1
iv) _Cable tray including fitting, fixing accessories lot 1
1B 245 kV Air Insulated Switchgear
Deleted
1C 145 kV Air Insulated Switchgear
1C.1 SF6 Circuit breaker,1600A,40kA/1s, live tank, gang operating for Transformer Bay set 3
1C.2 SF6 Circuit breaker,1250A, 40kA/1s,live tank, single pole operating for Line Bay set 8
1C.3 SF6 Circuit breaker,3000A,40kA/1s, live tank, gang operating for Bus Coupler Bay set 1
1C.4 Disconnector switch without E/S, 1600A,40kA/1s for Transformer Bay set 9
1C.5 Disconnector switch without E/S, 1250A,40kA/1s for Line bay set 16
1C.6 Disconnector switch without E/S, 3000A,40kA/1s set 2
1C.7 Disconnector switch with E/S, 1250A,40kA/1s set 8
1C.8 Single phase current transformer,1600/1, 4-core,40kA/1s nos. 9
1C.9 Single phase current transformer,1250/1, 4-core,40kA/1s nos. 24
1C.10 Single phase current transformer,3000/1, 2-core,40kA/1s nos. 6
1C.11 Single phase capacitive voltage transformer (CVT), 3-core nos. 39
1C.12 Single phase surge arrester, 120kV rated,10kA nos. 33
Flexible conductorsfor bus and jumper, insulators, fittings including all necessary clamps and
1C.13
connectors for busbar compositions
i) _Flexible Conductor for Bus, jumper, equipment connections lot 1
ii) _Insulator lot 1
iii) _Fittings lot 1
Sub-Total Price carried forward
Sub Total Price in words............................................................................................................................................................................
1
Specify currency in accordance with specifications in Bid Data Sheet under ITB 19.1 in Single-stage Bid.
Schedule B: Bid Price
DESIGN, SUPPLY, ERECTION, TESTING & COMMISSIONING OF GOPALGANJ 400/132kV SUBSTATION ON TURNKEY
BASIS [CONTRACT NO.PGCB/ADB/400kV/GOPAL-SS ]
Schedule B4 -Installation & other services
Unit Qty Country Unit Price1 Total Price1
of origin Foreign Local
Item Description Foreign Local Currency
Currency Currency
Currency Portion Portion
Portion Portion
1 2 3 (1) x (2) (1) x (3)
Sub-Total brought forward
1C.14 Steel Structures for gantry and equipment supports
i) _Gantry Column including nut & bolts lot 1
ii) _Gantry beam including nut & bolts lot 1
iii) _Equipment support structures including nut & bolts lot 1
iv) _Cable tray including fitting, fixing accessories lot 1
1D 33kV Switches & connection
1D.1 33kV Vacuum Circuit breaker set 2
1D.2 33kV Disconnector switch set 4
1D.3 33kV Inductive voltage transformer (IVT), 2 core nos. 6
1D.4 Single pahse surge arrester, 30kV rated,10kA nos. 6
Tertiary side connection including necessary fittings, structures, 33kV XLPE cable and
1D.5 lot 1
conductors (for two 400kV power transformer)
1E Power Transformer & Earthing/Auxiliary Transformer
1E.1 400/135/33 kV, 250/325MVA (ONAN/ONAF), three phase PowerTransformer set 3
1E.2 33/0.4 kV, 500kVA auxiliary Transformer set 2
1F Control, Protection, SAS and Metering
420kV Circuits
1F.1 Control, Protection,monitoring & SAS for overhead line circuits set 6
1F.2 Control, monitoring, Protection, monitoring & SAS for Three phase transformer circuits set 3
1F.3 Busbar Protection set 1
1F.4 DFDR Set 1
1F.5 Tarif metering lot 1
145kV Circuits
1F.6 Control, Protection,monitoring & SAS for overhead line circuits set 8
1F.7 Control, Protection,monitoring & SAS for Three phase transformer circuits set 3
1F.8 Control, Protection,monitoring & SAS for Bus Coupler circuits set 1
1F.9 Busbar Protection set 1
1F.10 Tariff metering lot 1
36kV Circuit
1F.11 Control, Monitoring, Protection & SAS for 33kV station power system lot 1
1F.12 Tariff metering lot 1
1G Multicore Cables
1G.1 Multicore Cables for control, protection, metering & power circuits
i) _LV Control Cable lot 1
ii) _LV Power Cable lot 1
Sub-Total Price carried forward
Sub Total Price in words............................................................................................................................................................................
1
Specify currency in accordance with specifications in Bid Data Sheet under ITB 19.1 in Single-stage Bid.
Schedule B: Bid Price
DESIGN, SUPPLY, ERECTION, TESTING & COMMISSIONING OF GOPALGANJ 400/132kV SUBSTATION ON TURNKEY
BASIS [CONTRACT NO.PGCB/ADB/400kV/GOPAL-SS ]
Schedule B4 -Installation & other services
Unit Qty Country Unit Price1 Total Price1
of origin Foreign Local
Item Description Foreign Local Currency
Currency Currency
Currency Portion Portion
Portion Portion
1 2 3 (1) x (2) (1) x (3)
Sub-Total brought forward
1H Earthing and Lightning Protection
1H.1 _Earthing system for complete substation lot 1
1H.2 _Lighting Protection System for complete substation lot 1
1H.3 Portable(maintenance) earthing equipment device set 2
1I Batteries, chargers & DC distribution
1I.1 110V Ni-cad Batteries with chargers & distribution board (including 2 sets 1.5kVA UPS) lot 1
a) for 400kV System
i) _110V Battery Banks, 350Ah set 1
ii) _Charger 150A set 1
iii) _110V DC Distribution panel, MCC type lot 1
b) for 132kV System
i) _110V Battery Banks, 300Ah set 1
ii) _Charger 120A set 1
iii) _110V DC Distribution panel, MCC type lot 1
1I.2 48V Ni-cad Batteries with chargers & distribution board
i) _48V battery Banks,150Ah set 1
ii) _Charger 100A set 1
iii) _48V DC Disatribution Panel lot 1
iv) 1.5kVA Inverter set 1
1J LVAC Distribution
1J.1 _AC 415V or 240V distribution panels (MCC type) lot 1
_UPS (3kVA, 30min) for SAS set 2
1J.2 _Tariff metering at LV side(Main & Check) lot 1
1K Civil Works, Building and Foundation
1K.1 Complete civil items required for outdoor works including boundary wall and slope protection
a) Complete Land development with carried earthfilling Deleted
b) Complete outdoor civil works
i) _Outdoor gantry foundation 400kV switchyard nos. 25
ii) _Outdoor equipment foundation 400kV switchyard nos. 197
iii) _Outdoor gantry foundation 132kV switchyard nos. 25
iv) _Outdoor equipment foundation 132kV switchyard nos. 158
v) _Outdoor equipment foundation 33kV switchyard nos. 18
vi) _Outdoor gantry/tubular busbar foundation 33kV switchyard lot 1
vii) _Transformer foundation including oilpit & carrage way nos. 3
viii) _Blast wall lot 1
ix) _Security Boundary Wall Deleted
x) _Substation Main gate lot 1
xi) _Chainlink Fencing lot 1
xii) _Approach raod (20 meters--approx.) lot 1
xiii) _Internal road lot 1
xiv) _Surface drain lot 1
xv) _Cable Trench lot 1
xvi) _Switchyard surface finishing lot 1
xvii) _Gravel laying lot 1
xviii) _Septic tank, sowak way lot 1
xix) _Pump house including deep tubewell, motor, pump, water reservoir, water pipe line etc.
lot 1
xx) _Gurd house, sentry post, car port lot 1
Sub-Total Price carried forward
Sub Total Price in words............................................................................................................................................................................
1
Specify currency in accordance with specifications in Bid Data Sheet under ITB 19.1 in Single-stage Bid.
Schedule B: Bid Price
DESIGN, SUPPLY, ERECTION, TESTING & COMMISSIONING OF GOPALGANJ 400/132kV SUBSTATION ON TURNKEY
BASIS [CONTRACT NO.PGCB/ADB/400kV/GOPAL-SS ]
Schedule B4 -Installation & other services
Unit Qty Country Unit Price1 Total Price1
of origin Foreign Local
Item Description Foreign Local Currency
Currency Currency
Currency Portion Portion
Portion Portion
1 2 3 (1) x (2) (1) x (3)
Sub-Total brought forward
1K.2 Complete civil works for Operation & Panel Room
a) Complete civil works for one no's two storied Operation Room
i) _Foundation works lot 1
ii) _Super structures lot 1
iii) _All finish works lot 1
b) Complete civil works for two no's one storied 400kV switchyard panel Room
i) _Foundation works lot 1
ii) _Super structures lot 1
iii) _All finish works lot 1
c) Complete civil works for one no's one storied 132kV switchyard panel Room
i) _Foundation works lot 1
ii) _Super structures lot 1
iii) _All finish works lot 1
Complete fire fighting system for transformers including water pond/reservoir, pipe network
1K.3 lot 1
and pump
1L Lighting, small power, air conditioning and Ventilation
Lighting, small power, air conditioning and Ventilation and emergency DC lighting for control
1L.1 lot 1
building and local control houses
1L.2 Lighting for ouside building for security, roadway, switchyard and emergency DC lighting lot 1
Fibre Optic Multiplexer Equipment and PLC Equipment for Communication and
1M
Protection
1M.1 Indoor Fibre Optic Multipexer Equipment lot 1
1M.2 PABX lot 1
under ground optical fiber cable, armoured, 48/24 core including Outdoor termination
1M.3 lot 1
box,indoor MDF & pigtail cables
1M.4 PLC Equipment lot 1
1N SCADA system for Telecontrol and Telemetering
1N.1 Complete SCADA hardware & software lot 1
Total Price carried to Summary of Price Schedule
Total Price in words............................................................................................................................................................................
1
Specify currency in accordance with specifications in Bid Data Sheet under ITB 19.1 in Single-stage Bid.
Schedule B: Bid Price
DESIGN, SUPPLY, ERECTION, TESTING & COMMISSIONING OF GOPALGANJ 400/132kV SUBSTATION ON TURNKEY
BASIS [CONTRACT NO.PGCB/ADB/400kV/GOPAL-SS ]
Schedule B4 -Installation & other services
Unit Qty Country Unit Price1 Total Price1
of origin Foreign Local
Item Description Foreign Local Currency
Currency Currency
Currency Portion Portion
Portion Portion
1 2 3 (1) x (2) (1) x (3)
Works and Equipment for Shunt Reactor Installation as specified in Section 16 of the
3A
Technical Specification
3A.1 EMTP study Please refer to schedule B3

400kV, 25MVAR, ONAN Three phase outdoor type Shunt Reactor.for change in MVar size of
Shunt Reactor during execution based on EMTP study, the price shall be adjusted as follows:
3A.2 set 4
P_N=20%×P_0±80%×P_0×(New Size)/(Old Size)

3A.3 SF6 Circuit breaker, live tank, gang operating set 4


3A.4 Disconnector switch without E/S, 2000A set 4
Control, Protection, Monitoring & Substation Automation System including event recording
3A.5 set 4
fuction
Rigid tubular bus and flexible conductors, insulators, fittings including all necessary clamps
3A.6 and connectors required for completing 420kV busbar and switchgear connection for Shunt lot 1
Reactor bay
Steel Structures for gantry, equipment supports and civil works required for completing 420kV
3A.7 lot 1
busbar and switchgear for Shunt Reactor bay
Total Price carried to Summary of Price Schedule
1
Specify currency in accordance with specifications in Bid Data Sheet under ITB 19.1 in Single-stage Bid.
Total Price in words............................................................................................................................................................................
DESIGN, SUPPLY, ERECTION, TESTING & COMMISSIONING OF GOPALGANJ 400/132kV SUBSTATION ON TURNKEY
BASIS [CONTRACT NO.PGCB/ADB/400kV/GOPAL-SS ]
Schedule B4 -Installation & other services
Unit Qty Country Unit Price1 Total Price1
of origin Foreign Local
Item Description Foreign Local Currency
Currency Currency
Currency Portion Portion
Portion Portion
1 2 3 (1) x (2) (1) x (3)
420 kV SWITCHGEAR
1 Complete SF6 gas, livetank type 420kV Circuit Breaker (single-pole operation type) set 1
2 Complete 420kV disconnector switch sets 1
Set of interrupting chamber including insulators, fixed and moving contacts for 420kV offered
3 sets 2
type circuit breaklers
4 420 kV post insulators suitable for disconnector nos. 3
5 Set (three phase) contacts for 420kV disconnector sets 2
6 390 kV surge arrester nos. 6
7 420kV capacitive voltage transformer nos. 3
8 Closing coils nos. 3
9 Tripping coils nos. 3
10 Motor for 420kV circuit breaker operating mechanism nos. 2
11 Motor for disconnector drive nos. 2
12 Coils for Blocking magnet in disconnector drive nos. 3
145 kV SWITCHGEAR
13 Complete SF6 gas, livetank type 145kVCircuit Breaker (single-pole operation type) set 2
14 Complete 145 kV disconnector switch sets 2
Set of interrupting chamber including insulators, fixed and moving contacts for 145kV offered
15 sets 2
type circuit breaklers
16 145 kV post insulators suitable for disconnector nos. 3
17 Set (three phase) contacts for 145 kV disconnector sets 2
18 120 kV surge arrester nos. 6
19 145 kV capacitive voltage transformer nos. 3
20 Closing coils nos. 3
21 Tripping coils nos. 3
22 Motor for 145 kV circuit breaking operating mechanism nos. 2
23 Motor for disconnector drive nos. 2
24 Coils for Blocking magnet in disconnector drive nos. 3
TRANSFORMERS
37 Auto-transformer 420kV bushings nos. 1
38 Auto-transformer 145 kV bushings nos. 1
39 deleted
40 Earthing transformer 36 kV bushings nos. 1
41 Sets of Three phase transformer gaskets sets 1
42 Sets of earthing transformer gaskets sets 1
43 Sets of tap changer spares sets 1
44 Set of special tools, gauges and spanners (Bidders to give details) set 1
45 Spare transformer oil kg 32000
46 Silica gel 100% spare lot 1
Transformer oil treatment plant, 6000litre
47 set 1
(Clause 4.13.2)
Sub-Total Price carried forward

Sub Total Price in words............................................................................................................................................................................


1
Specify currency in accordance with specifications in Bid Data Sheet under ITB 19.1 in Single-stage Bid.
Schedule B: Bid Price
DESIGN, SUPPLY, ERECTION, TESTING & COMMISSIONING OF GOPALGANJ 400/132kV SUBSTATION ON TURNKEY
BASIS [CONTRACT NO.PGCB/ADB/400kV/GOPAL-SS ]
Schedule B4 -Installation & other services
Unit Qty Country Unit Price1 Total Price1
of origin Foreign Local
Item Description Foreign Local Currency
Currency Currency
Currency Portion Portion
Portion Portion
1 2 3 (1) x (2) (1) x (3)
Sub-Total brought forward
WATER SPRAY SYSTEM
48 Warter spray nozzles nos. 10
49 Release sprinklers nos. 5
50 Set of internal parts of deluge valve set 1
51 Set of sealings for deluge valves of each type set 1
52 Set of sealings for pipes and flanges set 1
53 Set of spare parts for jockey pump set 1
54 Set of spare parts for control panel and automatic level indicator set 1
55 Set of spare parts for the air supply and reducing devices set 1
56 Fire fighting pump complete with coupling set 1
PROTECTION, CONTROL, METERING
57 Distance relay set 1
58 Current differential relay set 1
59 Biased different relay (3-phase) set 1
60 Two pole overcurrent and earth fault relay sets 2
61 Tripping relay (electrical reset) sets 3
62 Trip circuit supervision relay sets 3
63 Ammeter nos. 3
64 Voltmeter nos. 3
65 Annunciator bulbs nos. 60
66 Bulbs for discrepancy switches nos. 30
67 kWh & kVarh meter nos. 1
POWER & CONTROL CABLES
Spare cable comprising:
68 control cable, 7 core meter 500
69 control cable, 12 core meter 500
Batteries, Chargers, & DC Distribution
70 Battery fuses nos. 4
71 Set DC board incoming MCCB sets 2
72 Sets outgoing MCBs sets 4
73 Battery Charger complete unit, 110V Deleted
LV AC SWITCHGEAR
74 3-phase set LVAC board incoming MCCB no. 1
75 3-phase sets outgoing MCCBs nos. 3
76 1-phase sets outgoing MCBs nos. 3
Fiber Optic Multiplexer Equipment
77 Set of spare modules of necessary function lot 1
TEST and O&M EQUIPMENT
78 Set of gas filling equipment and 1 bottle of SF6 gas sets 3
79 SF6 gas sniffer sets 2
80 Portable vacuum pump suitable for SF6 circuit breaker set 1
81 Contact resistance measurement test set (suitable for measurement down to 1 µ ohm at 10A
set 1
d.c.)
82 5 kV insulation resistance test set (range 0.5 –1.0 - 2.5 - 5 kV) sets 1
83 Earth resistance test set (range 10-100-1000 ohm: min scale division 0.1 ohm) sets 1
84 Clip-on mA meter (for spill current) nos. 1
85 Portable Earthing Leads sets 6
Total Price carried to Summary of Price Schedule

Total Price in words............................................................................................................................................................................


1
Specify currency in accordance with specifications in Bid Data Sheet under ITB 19.1 in Single-stage Bid.
Schedule B: Bid Price
DESIGN, SUPPLY, ERECTION, TESTING & COMMISSIONING OF GOPALGANJ 400/132kV
SUBSTATION ON TURNKEY BASIS [CONTRACT NO.PGCB/ADB/400kV/GOPAL-SS ]

Schedule B5. Grand Summary


Total Price1
Item Description
Foreign Local
1 Total Schedule B1. Price for Itemised Works, Goods or Services including Mandatory spare,
Maintanence & Test Equipement Supplied from Outside the Employer's Country

2 Total Schedule B2. Price for Itemised Works, Goods or Services including Mandatory spare,
Maintanence & Test Equipement Supplied from within the Employer's country

3 Total Schedule B3. Design Services


4 Total Schedule B4. Installation & Other Services
TOTAL (to Bid Form)

Name of Bidder

Signature of Bidder

1
Specify currency in accordance with specifications in Bid Data Sheet under ITB 19.1 in Single-stage Bid. Create and use as many columns
for Unit Price and Total Price as there are currencies.
POWER GRID COMPANY OF BANGLADESH LIMITED

BIDDING DOCUMENT
FOR
DESIGN, SUPPLY, ERECTION, TESTING & COMMISSIONING OF
400/132 kV AIR INSULATED SWITCHGEAR (AIS) SUBSTATION
AT GOPALGANJ ON TURNKEY BASIS

SCHEDULE C

TIMES FOR DELIVERY AND COMPLETION

The individual dates are all contractually binding.

The times given under Column D are the commissioning target dates at present planned to be
achieved and may be the subject of mutual adjustment.

Column A details the earliest dates by which access to site can be given for storage purposes. The
times entered under column B are to be the dates guaranteed for arrival at Site of the first shipment of
parts for the circuits in question being also the dates when the contract requires access to the Site for
plant erection, to the extent necessary to enable him to proceed with work to meet the dates under
column C guaranteed for complete delivery, erection and commissioning of the shipment.

The times include all necessary control, relay, metering, auxiliary power ancillary equipment to enable
the respective circuit or item of plant to be completely commissioned and put into commercial
operation, together with such other associated equipment, e.g. busbars, etc as will ensure that
subsequent shutdown are unnecessary or at least only of a temporary or short time nature.

The dates assume an order is placed by . . . . . . . . . . . . . . . . . . . . .


(to be advised or stated by Bidder)

A* B* C* D*
Latest Guaranteed Guaranteed Target
Access Arrival of Completion Completion
Site Permitted first shipment

Gopalganj 400/132kV S/s 7 days from the 20


date of signing
of the Contract
* Time in months, after contract effective date.

Preliminary SLD, overall layout and control building drawings of the Technical Specification shall be
provided within 2.0 months of the contract commencing date with final drawings following one month
later.

Schedule C: Times for Delivery and Completion SC-1


POWER GRID COMPANY OF BANGLADESH LIMITED

BIDDING DOCUMENT
FOR

DESIGN, SUPPLY, ERECTION, TESTING & COMMISSIONING OF


400/132 kV AIR INSULATED SWITCHGEAR (AIS) SUBSTATION
AT GOPALGANJ ON TURNKEY BASIS

SCHEDULE D

MANUFACTURERS, PLACES OF MANUFACTURE AND TESTING

The following Subcontractors and/or manufacturers are proposed for carrying out the item of the faciliti
es indicated.

Bidders are free to propose more than one for each item.

Proposed Place of
Place of
Item Description Subcontractors/ Testing and
Manufacture
Manufacturers Inspection

1 420 kV AIS SWITCHGEAR

Steel Structure

Circuit Breaker

Disconnector
 Main part
 PI
Instrument Transformer
 CT
 CVT

Surge Arrester

Wave Trap

145 kV AIS SWITCHGEAR


2
Steel Structure

Circuit Breaker

Disconnector

Schedule D: Manufactures, place of manufacture and testing SD-1


Proposed Place of
Place of
Item Description Subcontractors/ Testing and
Manufacture
Manufacturers Inspection
 Main part
 PI

Instrument Transformer

Surge Arrester

3 33kV AIS SWITCHGEAR

Steel Structure

Circuit Breaker

Disconnector

Instrument Transformer

Surge Arrester

4 400/135/33 kV POWER
TRANSFORMERS

Complete

HV bushings

LV bushings

TV bushings

NV bushings

Porcelain for insulators

Tap changers

Copper

Core plates

Tanks

Radiators

Schedule D: Manufactures, place of manufacture and testing SD-2


Proposed Place of
Place of
Item Description Subcontractors/ Testing and
Manufacture
Manufacturers Inspection
Fan motors

Temperature indicators

Oil valves

Pressure relief device

Motor control equip.

Gas/Oil actuated relay

Transformer oil

Remote control panel

Automatic voltage control


equipment

Indicating instruments

5 33/0.415 kV EARTHING
/AUXILIARY
TRANSFORMERS

6 SHUNT REACTOR

Complete

HV bushings

NV bushings

Porcelain for insulators

Copper

Core plates

Tanks

Radiators

Schedule D: Manufactures, place of manufacture and testing SD-3


Proposed Place of
Place of
Item Description Subcontractors/ Testing and
Manufacture
Manufacturers Inspection

Temperature indicators

Oil valves

Pressure relief device

Gas/Oil actuated relay

Reactor Oil

Remote control panel

Indicating instruments

PROTECTION
7 METERING AND
CONTROL

Panels

Instruments

Protective relays

Substation automation
system

Meters

Transducers

8 DFDR

FLEXIBLE CONDUCTOR, RIGID TU

Schedule D: Manufactures, place of manufacture and testing SD-4


Proposed Place of
Place of
Item Description Subcontractors/ Testing and
Manufacture
Manufacturers Inspection
9 BULAR BUS

420kV

Rigid Tubular Bus

Flexible Conductor

Insulator

Fittings and Clamps

145kV

Flexible Conductor

Insulator

Fittings and Clamps

10 DC EQUIPMENT

Batteries

Chargers

Distribution Boards

11 415 V AC DISTRIBUTION
BOARD

12 48V UPS

13 MULTICORE CABLES

PVC Insulated Cables

Schedule D: Manufactures, place of manufacture and testing SD-5


Proposed Place of
Place of
Item Description Subcontractors/ Testing and
Manufacture
Manufacturers Inspection
Cable trays

14 POWER CABLES & TERMINATIONS

33 kV XLPE Cables

33 kV Cable sealing ends


and Cable termination kits

15 EARTHING

Copper tape

Insulated copper
Conductor

16 FIBRE OPTIC
MULTIPLEXER
EQUIPMENT

POWER LINE CARRIER

PLC Terminal unit

Line traps

Line Matching unit

Co-Axial cable

Tele-protection equipment

17 DIGITAL PABX

18 SITE ERECTION AND


COMMISSIONING BY
CIVIL WORKS

Design to be performed
by:-
Constructed by:-

Schedule D: Manufactures, place of manufacture and testing SD-6


Schedule D: Manufactures, place of manufacture and testing SD-7
POWER GRID COMPANY OF BANGLADESH LIMITED

BIDDING DOCUMENT

FOR
DESIGN, SUPPLY, ERECTION, TESTING & COMMISSIONING OF
400/132 kV AIR INSULATED SWITCHGEAR (AIS) SUBSTATION
AT GOPALGANJ ON TURNKEY BASIS

SCHEDULE E

TECHNICAL PARTICULARS AND GUARANTEES

General

400kV, 132kV and 33kV AIR INSULATED SWITCHGEAR (AIS)

Sl. No. Description Unit 400kV 132kV 33kV


1. Site Condition
Max. Altitude above sea level m
Max. Ambient temperature outdoor ℃
Min. Ambient temperature outdoor ℃
Max. Ambient relative humidity %
Max. Seismic acceleration at floor level
- horizontal g
- vertical g
2. Electrical Data
Rated Voltage kV
Rated Frequency Hz
Insulation Level
- lightning impulse withstand kVp
- switching impulse withstand kVp
- 50 Hz withstand 1 minute kV
Rated continuous current at 40℃ am
bient temperature
- main busbar and bus coupler A
- transformer bay A
- line bay A
Rated short time withstand
- current kA
- duration Sec
Rated peak withstand current kA
3. Secondary Circuit
Auxiliary voltage
- for control and signal V dc
- for remote control V dc

Technical particulars & Guarantees SE-1


- for heating V ac
- tolerances %

PART 1 - SWITCHGEAR

1.1 HV OUTDOOR CIRCUIT BREAKERS

Bidders Data
Sl.
No. Description Unit 420kV 145kV 36kV

1 Manufacturer

2 Type Reference (Manufacturer’s designation)

3 Number of Poles

4 Rated Voltage

5 Rated frequency

6 Rated normal current-feeder/transformer/bus coupler A

7 Rated breaking currents: kA rms


Line charging
Cable charging
Small inductive

8 Rated short-circuit breaking current kA,rms

9 First pole to clear factor

10 Rated transient recovery voltage for terminal faults if kV


other than standard

11 Rated characteristics for short-line faults

12 Rated short-circuit making current kA

13 Rated operating sequence

14 Rated duration of short-circuit s

15 Rated out of phase breaking current kA

16 Rated opening time ms

17 Rated break time ms

18 Rated closing time ms


Maximum arcing time of any duty cycle to IEC 56
19 ms

20 Is circuit-breaker re-strike free Yes/No


21 Test Authority

22 Test Certificate ref.

23 Rated short time withstand current kA

24 Rated duration of short-circuit s

Technical particulars & Guarantees SE-2


Bidders Data
Sl.
No. Description Unit 420kV 145kV 36kV

25 Rated peak withstand current kA

26 Rated insulation levels:-

26.1 Lightning impulse withstand to earth kV pk

(wave shape 1.2/50µs)

26.2 Lightning impulse withstand across open contacts kV pk


(wave shape 1.2/50µs)

26.3 Power frequency voltage withstand to earth kV rms

26.4 Power frequency voltage withstand across open kV rms


contacts

27 Rated supply pressure of gas for interruption MPa (g)

28 Limits for correct operation


max MPa (g)
min MPa (g)

29 Frequency of operation yr-1

30 Operating mechanism Manufacturer

31 Mechanism Type:

32 Trip free/or fixed trip

33 Is lockout facility fitted?

34 Closing supply
Volts max/min V
Amps A

35 Rated supply voltage of shunt opening release V

36 Current required at rated supply voltage to open circuit- A


breaker
37 Spring charging motor
- Current A
- Voltage AC/DC V

38 Number of auxiliary switch contacts


- normally open
- normally closed
- adjustable

39 Other auxiliary loads:


Voltage:
Current:

40 Degree of Protection for


(a) auxiliary circuits
(b) moving parts

41 Minimum clearances in air:


(a) between phases mm
(b) phases to earth mm
(c) across interrupters mm
(d) live parts to ground level mm

Technical particulars & Guarantees SE-3


Bidders Data
Sl.
No. Description Unit 420kV 145kV 36kV

42 Minimum creepage
(a) to earth mm
(b) across interrupter terminals mm

43 Radio interference voltage μV

44 Guaranteed maximum gas leakage % per


annum

45 Number of interrupters per pole

46 Material of interrupter chamber

47 Wall thickness of interrupter chamber mm

48 Material of contact surfaces primary arcing

49 Length of each break mm

50 Length of stroke mm

51 Operating rod for moving contact(s) material


dimensions, etc.

52 Weight of circuit-breaker unit complete kg

53 Maximum shock load imposed on floor or foundations


when opening under fault conditions (state whether
tension or compression)
kg

54 Quantity of gas in complete three-phase circuit breaker

55 Maximum pressure rise in circuit breakers due to the


making or breaking of rated current

56 Routine pressure test on circuit-breaker tanks or


containers

57 Pressure type test on circuit-breaker tanks or containers

58 Interrupting gas pressure at 20 C Normal

59 Limits of gas pressure at 20 C Maximum


Minimum

60 Period of time equipment has been in commercial


operation

61 Number of the same type of circuit breakers supplied to


date

62 Pre insertion Resistor(PIR) for 400kV OHM


63 Pre insertion time ms

1.2 DISCONNECTORS AND EARTHING SWITCHES

Bidders Data
Sl.
No. Description Unit 420kV 145kV 36kV

Technical particulars & Guarantees SE-4


Bidders Data
Sl.
No. Description Unit 420kV 145kV 36kV

1 Manufacturer

2 Type Number

3 Operating type

(a) horizontal/vertical break

(b) Pantograph

(c) Number of support insulation for pole

(d) Number of breaks per pole

(e) Material of contact surfaces

(f) Type of Contacts

4 Rated normal current A

5 Rated short time withstand current kA, rms

6 Rated duration of short time current s

7 Rated peak withstand current kA pk

8 Rated insulation levels:

8.1 Lightning impulse withstand to earth


(waveshape: 1.2/50µs) kV pk

8.2 Lightning impulse withstand across open contacts kV pk


(waveshape: 1.2/50µs)

8.3 Power frequency voltage withstand to earth kV rms

8.4 Power frequency voltage withstand across open contacts kV rms

9 Contact Resistance

10 Method of operation

11 Type of operating mechanism


manual/power

12 Operating power

13 Voltage/pressure rated V/MPa(g)


max V/MPa(g)
min V/MPa(g)

14 Auxiliary Consumption A

15 Operating time: open max ms


min ms

16 Operating time: close max ms


min ms

17 Manual operating torque kNm

18 Load switching capability


Inductive A
Capacitive

Technical particulars & Guarantees SE-5


Bidders Data
Sl.
No. Description Unit 420kV 145kV 36kV

19 Mechanical Terminal Load N

20 Insulator Creepage mm

21 Radio interference voltage mV

22 Number of auxiliary switches


- normally open
- normally closed
- adjustable

23 Other auxiliary loads


- voltage
- current

Mechanical endurance:

24 Number of operations carried out for mechanical


operation test

25 Degree of protection for


1) auxiliary circuits
2) moving parts

26 Total weight of three pole disconnector complete kg

27 Type test certificate date/reference

28 Period of time equipment has been in commercial


operation

Number of the same type of disconnectors supplied to


29 date

1.3 CURRENT TRANSFORMERS

Sl. Bidders Data


No. Description Unit
420kV 145kV 36kV

1 Manufacturer/type

2 Rated primary current A rms

3 Rated secondary current A rms

4 Rated frequency Hz

5 Highest voltage for equipment kV

6 Rated insulation level - primary winding kV

7 Lightning impulse withstand kV pk

8 (a) Power frequency withstand (dry) kV rms


(b) Power frequency withstand (wet) kV rms

9 Insulator creepage (phase to earth) mm

10 Electrical dissipation factor at power frequency test


voltage

11 Radio influence voltage measured at U/3 1 MHz µV


Technical particulars & Guarantees SE-6
12a Rated short term thermal current for 1s A rms
12b Rated short term thermal current for 3s A rms

13 Rated dynamic current kA pk


14 Insulation class

15 Number of secondary windings


Location of core
Core 1 Rated output
Accuracy class *
Accuracy limit factor
Resistance a
Core 2 Rated output
Accuracy class *
Accuracy limit factor
Resistance a
Core 3 Rated output
Accuracy class *
Accuracy limit factor
Resistance a
Core 4 Rated output
Accuracy class *
Accuracy limit factor
Resistance a
Class X winding:
- Rated knee point emf V
- Exciting current A
- Resistance a
*including instrument security factor where applicable
16 Is earth screen fitted between primary and secondary
windings
17 Maximum cantilever strength Nm
18 Type test certificate ref/date
a. Preliminary value. Actual shall be as per Detail Engineering during execution
1.4 VOLTAGE TRANSFORMERS
Description Bidder’s Data
Sl. Unit
No. 420kV 145kV 36kV

1 Manufacturer
-
2 Type No. -

3 Transformer type -

4 Rated primary voltage kV rms


5 Rated Impedance
6 Rated secondary voltage for each secondary winding kV rms

Accuracy class for each winding


7 VA
Rated output for each winding

8 Rated voltage factor

9 Type of Insulation

10 Maximum temperature rise ºC

11 Short-circuit withstand capability kA rms

Technical particulars & Guarantees SE-7


Description Bidder’s Data
Sl. Unit
No. 420kV 145kV 36kV

12 Primary insulation

12.1 Lightning impulse withstand dry kV pk


12.2 (a) Power frequency withstand wet kV rms
(b) Power frequency withstand dry kV rms
13 Partial discharge magnitude pC

14 Total external creepage distance mm

Radio influence voltage measured at


15 µV
1.1 Um/√3 at 1 MHz
16 Total installed weight kg

17 Capacitance

17.1 High voltage capacitance (C1) pF


17.2 Intermediate - voltage capacitance (C2) pF
17.3 Total Capacitance (CT) pF
18 Open circuit intermediate voltage kV
19 Rated open-circuit intermediate voltage kV
20 Reference range of frequency +/- Hz
21 Reference range of temperature oC

22 No. of Protective devices to limit overvoltage & location

1.5 SURGE ARRESTERS


Bidder’s Data
Sl. No. Description Unit
420kV 145kV 36kV

1 Manufacturer

2 Model Number

3 Type:
Applicable Standard
4
System Earthing
5
Rated Frequency
6
Rated system voltage
7
Highest system voltage
8

9 Continuous operating voltage kV rms

10 Rated voltage kV rms

11 Standard nominal discharge current kA

12
Reference current at ambient temperature mA

13 Reference voltage for above item no. 7 kV rms

Technical particulars & Guarantees SE-8


Currents at MCOV
14
Residual Voltage
15

16 Steep current impulse residual voltage kV pk


Protective Ratio
17

18 Lightning impulse residual voltage at


5kA kV pk
10kA kV pk
20kA kV pk

Duty Class
19

20 Discharge class

21 Pressure relief class


Minimum Energy Discharge Capability
22
Temporary Over Voltage Capability at
23 0.1s
1s
10s
100s
Nominal diameter of resistor blocks mm
24
Number of resistor blocks connected electrically in parallel
25
Number of separately housed units per phase
26
Overall height of arrester (without supporting structure) m
27

Overall height of arrester including grading ring if applicable mm


28

Clearances:
29 phase to earth (from centre line) mm
phase to phase (centre line to centre line) mm
30
Overall Weight of arrester (without supporting structure) kg

31
Maximum cantilever strength Nm

32
Maximum force due to wind (at maximum specified gust speed) Nm
33
Minimum creepage distance over insulator housing mm
34
Insulator shed profile - Reference Document
35
Terminal palm details - Drawing No.
36
Earthing terminal - Drawing No.
37 Type & Description of surge monitoring device

Technical particulars & Guarantees SE-9


38
Type test certificate ref/date
39
Number of the same type of surge arresters supplied to date

Technical particulars & Guarantees SE-10


PART 2 – TRANSFORMERS

2.1 400/135/33 kV, 250/325MVA, 3-PHASE POWER TRANSFORMER:


Sl. Description Unit Bidder’s data
No.

1.1 Name of the Manufacturer

1.2 Type/Model

2.1 Continuous Rating - ONAN


ONAF
2.2 Voltage ratio at no-load HV/LV kV

3 Tap Changer

3.1 HV Tap Changer (On load type)


Tapping Range

3.2 Size of tapping step


3.3
No. of Steps

4 Vector Group

5 On-load voltage control equipment:

A) Type.
B) Manufacturer
C) Range %
D) Size of steps %
E) Rated Through Current A
F) Rated Short time withstand current &
kA/s
duration
G) Power frequency withstand test voltage
(BS.4571)
- between first and last contacts of the
selector switch
- between any two adjacent contacts of the
selector
- between open diverter switch contacts
H) Type test certificate reference
6 Type of cooling

7 Winding temperature rise


at CMR under service ºC
conditions stated in Schedule of Technical
Requirement
8 Top oil temperature under service
conditions stated in Schedule of Technical
Requirement
(A) CMR ºC
(B) ONAN rating ºC

9 Maximum hot spot temperature rise in ºC


core at rated power

SE-11
Sl. Description Unit Bidder’s data
No.

10 Maximum hot spot ºC


temperature rise in
copper at rated power

11 Temperature gradient ºC
at rating specified

12 Flux density in iron at


normal voltage and
frequency and at normal
ratio - (no load)
(A) Cores Tesla
(B) Yokes Tesla
(C) Volts/turn V
13
Magnetising current (approx)
at nominal ratio and
at 0.9 x nominal voltage %
at 1.0 x nominal voltage %
at 1.1 x nominal voltage %
at 1.2 x nominal voltage %

14 Harmonic component of magnetising current


at rated voltage as percentage of fundamental
(A) Fifth harmonic %
(B) Seven harmonic %

15* No-load loss (excluding


cooling plant losses) at rated kW
voltage, ratio and frequency

16* Copper loss ( excluding cooling plant losses) at 75 C kW


and at rated voltage, ratio (nominal tap),frequency
17* Auxiliary loss kW
(Total power input to fans for
operation of total installed
cooling capacity)

18 Total loss at 75ºC and


normal ratio (Sl. No.15+16+17) kW
19 Regulation at 75ºC and
normal ratio -
(A) At unity power factor % %
(B) At 0.8 lagging power factor %

20 (i) Impedance voltage at 75ºC and


CMR between HV & LV windings

(A) At extreme minus tap %


normal tap %
extreme plus tap %

(B) Maximum Impedance over %


tapping range.
Corresponding tap

SE-12
Sl. Description Unit Bidder’s data
No.

(C) Minimum Impedance over %


tapping range.
Corresponding tap

(ii) Impedance voltage at 75 C and CMR


between HV & LV at normal tap.

21 Equivalent circuit zero sequence impedance: %


HV-LV
22 Maximum current density in windings at C.M.R.
(A) HV winding A/mm2
(B) LV winding A/mm2
(C) SV winding A/mm2

24 Noise level dB

25 Types of transformers (shell or core)

26 Core steel
(a) Type
(b) Grade

27 Types of winding -
(A) HV
(B) LV
28 Insulation of
(a) HV windings
(b) LV windings
29 Insulation of -
(A) Yoke bolts
(B) Side plates

31 Safe working temperature of core plate insulation


ºC

32 Winding connections brazed or crimped

33 For fault with zero impedance external to the


transformer and infinite system
(a) Maximum axial force
kN
(b) Maximum tensile stress in winding
N/m2

34 Is facility provided for adjustment


of axial pressure on windings Yes/No

35 Thickness of transformer
tank
(A) Sides mm
(B) Bottom mm

36 Material used for gaskets


for oil tight joints

Radiators, Valves, Fans


mm

SE-13
Sl. Description Unit Bidder’s data
No.
37 Thickness of radiator plates

38 Valve type/material:
(A) 100mm and below
(B) Above 100mm

39 Equipment for ONAF +


cooling state (A) –
(A) Radiators on main tank
40 Number of coolers/radiators
or cooler banks per
transformer

41 Number of air blowers per


transformer

42 Speed of air blowers rpm

43 Rating of each air blower motor kW


44 Rated Current air each blower motor A

45 Starting current of each air


blower motor A

Oil Volumes and Weights**

46 Total oil required including litres


cooler system

47 Volume of oil to fill litres


transformer to above
the top yoke

48 Total volume of conservator litres

49 Weight of active copper tonnes

50 Weight of active iron in core tonnes

51 Weight of core and winding assembly tonnes

52 Weight of each cooler


bank complete with oil if
mounted separately from
transformer tonnes

53 Total weights of complete


transformers, including
attached coolers, voltage
regulating equipment, all
fittings and oil tonnes
tonnes
54 Weight of transformer
arranged for transport
55
Manufacture, type and class of oil to IEC 60296
Transformer Parts Subject To Short-Circuit Test

Brief description of transformer or parts thereof

SE-14
Sl. Description Unit Bidder’s data
No.
56 subjected to short-circuit test
Transformer Bushing Insulators 420kV 145kV 36kV

57 Manufacturer

58 Insulator material (solid,


oil-paper etc)

59 Maker's type reference and


rated voltage

60 Rated current
61
BCT particulars

i) HV Side:
Core 1,2 & Core 3:
ii) LV Side:
Core 1,2 & Core 3:
iii) Neutral:
Core 1:

62 Manufacturer of porcelain mm
63
Length of insulator (overall) kg

64 Weight of insulator pF

65 Electrostatic capacity of
complete bushings

66 Dry lightning impulse voltage withstand (1.2/50 wave)


kV
67
50Hz wet withstand voltage kV
without arcing horns
68 Total creepage distance of
mm
outdoor shedding
Protected creepage distance
69
of shedding
mm

* Guaranteed values subject to deduction from Contract Price


**These values are required for Foundation design & shipping purpose only. During detail design, these values may vary from Bid
value due to attaining desired electrical output.

SE-15
2.2 33/0.415 kV EARTHING/AUXILIARY TRANSFORMERS

Sl. No. Description Unit Bidder's Data

1 Rated short time (10 second) current at neutral A

2 Current density in the interconnected star winding at rated


short time current A/mm2

3 Current density in the


interconnected star winding
-at CMR and A/mm2
-10 second fault rating simultaneously A/mm2

4 Maximum flux density in


core iron at normal
voltage and frequency Tesla

5 CMR of lower voltage star winding kVA

6 No load losses kW

7 Load losses at 75ºC at CMR


of lower voltage winding kW

8 Impedance voltage at CMR


of lower voltage winding %
between HV and LV winding
Total range of variation of off load
9
ratio .......
ratio ......
Size of step plus %
minus %

10 Resistance of higher voltage ohms per


winding at 75ºC phase

11 Zero phase sequence impedance at 75ºC with LV windings ohms per


open circuited phase

12 Total oil required litres

13 Weight of complete transformer (including oil) tonnes

14 Height from base to bottom of neutral bushing insulator


mm

SE-16
PART-3
3.1 XLPE POWER CABLES
(Schedule to be completed if manufacture not to BS.6346)

Sl. N Bidder’s Data


o. Description Unit
33 kV
1 Manufacturer
2 Type
3 Rated system voltage kV
4 Max. permissible system voltage kV
5 Rated frequency Hz
6 Max. operating current A
7 No. of cable
8 Nominal cross sectional area mm2
9 Impulse withstand voltage kV
10 Power frequency withstand voltage kV
11 Shape of conductor
12 Nominal cross section of Cu-screen mm2
13 Thickness of outer sheath mm
14 Insulation thickness mm
15 Min. bending radius D
16 Max. pulling force
17 Max. DC resistance at 20℃ ohm/km
18 Max. AC resistance at 20℃ ohm/km
19 Max. reactance in single configure mH/km
20 Operating capacitance µF/km
21 Charging current (phase) A
22 Charging load (phase) A
23 Earth fault current kA

Short circuit rating for 1 sec kA


24

Three phase symmetrical fault current for 1 sec kA


25
Current rating kA
26 - in soil A
- in air A
27 standard

SE-17
3.2 AUXILIARY POWER AND MULTICORE CONTROL CABLES

Item 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15
Number of core
Core section mm2
Core diameter mm
Conductor insulation mm
Type of filler
Type of tape
Sheath thickness mm
Sheath outer diameter mm
Armour wires no.
Armour wires diameter mm
Outer covering type
Outer covering thickness
Completed cable:
diameter mm
weight per metre kg
maximum drum length m
Minimum installed bending
radius mm
Maximum conductor temperature C

SE-18
PART 4 - DC EQUIPMENT

4.1 110 V BATTERIES AND CHARGERS

Sl. No
Description Unit Bidder’s Data
.
Battery For 400kV System For 132kV System
1 Manufacturer
2 Type
3 Electrolyte
4 Nominal voltage V
5 Capacity at 5 hour rate Ah
6 Number of cells
7 Float voltage per cell V
8 Boost voltage per cell V
9 Battery voltage at end of the duty cycle V
10 Normal charging rate A
11 Maximum charging rate A
12 Ampere-hour efficiency at five hour rate %
13 Ampere-hour efficiency at one hour rate %
14 Dimensions of cells mm
15 Dimensions of battery complete mm
16 Weight of cell complete with electrolyte kg
17 Internal resistance per cell when fully charged ohms
18 Material of battery case
Charger
19 Manufacturer
20 Type
21 AC input voltage and range V
22 DC output of charger kW,A
23 Type of DC voltage control
24 Range of DC voltage V
25 Output current sharing facility
(for parallel operation of chargers)
26 Regulation %
Charger Cubicle Complete
27 Manufacturer
28 Overall dimensions mm
29 Total weight Kg
DC Switchboard
30 Manufacturer
31 Type
32 Busbars:
- maximum current rating A
- dimensions mm
33 Boost charge contactors:
- manufacturer

Technical particulars & Guarantees SE-19


Sl. No
Description Unit Bidder’s Data
.
- maximum current rating
- coil rating
- method of interlocking
34 Alarm relays:
- manufacturer
- type and reference
- power consumption:
a) quiescent A
b) operating mA
35 Number and rating of distribution circuits
36 Overall dimensions mm
37 Total weight kg

4.2 48 V BATTERIES AND CHARGERS

Sl. No
Description Unit Bidder’s Data
.
Battery
1 Manufacturer
2 Type
3 Electrolyte
4 Nominal voltage V
5 Capacity at 5 hour rate Ah
6 Number of cells
7 Float voltage per cell V
8 Boost voltage per cell V
9 Battery voltage at end of the duty cycle V
10 Normal charging rate A
11 Maximum charging rate A
12 Ampere-hour efficiency at ten hour rate %
13 Ampere-hour efficiency at one hour rate %
14 Dimensions of cells mm
15 Dimensions of battery complete mm
16 Weight of cell complete with electrolyte kg
17 Internal resistance per cell when fully charged ohms
18 Material of battery case
Charger
19 Manufacturer
20 Type
21 AC input voltage and range kVA
22 DC output of charger kW
23 Type of DC voltage control
24 Range of DC voltage V
25 Output current sharing facility
(for parallel operation of chargers)

Technical particulars & Guarantees SE-20


Sl. No
Description Unit Bidder’s Data
.
26 Regulation %
Charger Cubicle Complete
27 Manufacturer
28 Overall dimensions mm
29 Total weight Kg
DC Switchboard
30 Manufacturer
31 Type
32 Busbars:
- maximum current rating A
- dimensions mm
33 Boost charge contactors:
- manufacturer
- maximum current rating
- coil rating
- method of interlocking
34 Alarm relays:
- manufacturer
- type and reference
- power consumption:
c) quiescent A
d) operated mA
35 Number and rating of distribution circuits
36 Overall dimensions mm
37 Total weight kg

Technical particulars & Guarantees SE-21


PART 5 - LV AC EQUIPMENT

Sl.No. Description Bidder's Data

5.1 Distribution Board

1 Manufacturer

2 Manufacturer’s type designation

3 Rating Amps

4 Fault Rating for 1 sec kA

5 Voltage Volts

5.2 Miniature Circuit Breakers

1 Manufacturer
2 Type

3 Rating Amps

4 Fault Rating for 1 sec kA

PART 6
Digital Fault and Disturbance Recorder [DFDR]

SL. Description UNITS BIDDER’S DATA


No.
(A) GENERAL

1 Manufacturer’s name & address


2 Type
3 Power Supply VDC
-power Supply for printer VAC

(B) ANALOGUE INPUTS

1 Number of Channel For


Gopalagnj :
-Expandability
2 Nominal Current Amp
3 Nominal voltage Vac/Vdc
- Current mA/Amp
4 Frequency response
5 Cut-off frequency
(a) Bandwidth dB
(b) Attenuation at dB
(c) Auto adjusted anti-aliasing filters for chosen Yes/No
sampling rate
(d )Simultaneously programmable sampling rate
for all feeders/inputs
-Locally Changeable Yes/No

Technical particulars & Guarantees SE-22


SL. Description UNITS BIDDER’S DATA
No.
-Remotely Changeable Yes/No

(e ) Possible sampling rates Samples/sec


Samples/sec
Samples/sec
6 DC coupled inputs Yes/No
7 Resolution bits
8 Accuracy %
9 Burden
1. Current Circuit at IN VA
2. Voltage Circuit VA
10 Over load
1. Current % In
2. Voltage circuit % Vn
(C) DIGITAL INPUTS

1 Number of Channel
-Expandability (Without and time skew)
2 Selectable input level Vdc
3 Type
4 Resolution ms

(D) MEMORY
1 Size MB
2 Type
3 Pre-fault time (fast scanning rate) sec
4 Post-fault (fast scanning rate sec
5 Pre and Post-fault time (slow scanning rate) sec
6 In-Built hard disk (auto-maintained GB
(E) SENSORS/ TRIGERRING CRITERIA
All sensors/trigerrs are preferable Yes/No
Programmable and Virtually recordable
1. Logical combination sensor Yes/No
2. Three phase over or under Voltage / Current Yes/No
3. Mono phase over or under Voltage / Current Yes/No
4. *du/dt, dp/dt, dq/dt, [Single/3 Phases], df/dt. etc. Yes/No
5. RMS [Voltage / Current] Yes/No
6. Zero Sequence Yes/No
7. Negative, Positive Sequence Yes/No
8. Frequency Yes/No
9. DC Step Yes/No
10. Pendling / Swing Yes/No
11. Digital level and edge Yes/No
12. Sensor trigger Yes/No
13. Event Trigger Yes/No
14. Manual Trigger Yes/No
15. Remote Trigger Yes/No

(F) CLOCK SYSTEM

1. Internal Clock Yes/No


2. Accuracy
3. External Synchronization Yes/No
4. Time resolution between 2 synchronized pulses

(G) OUTPUT ALARM RELAY CONTACT

1. Max. operation Voltage DC/AC Vac / Vdc


Technical particulars & Guarantees SE-23
SL. Description UNITS BIDDER’S DATA
No.
2. Make and carry for 0.5 sec A
3. Carry Continuously A
4. Break ( DC ) – resistive W

(H) INTERFACE FOR DATA COMMUNICATION

1. Full definition compression Yes/No


2. Maximum transmission rate bits / Sec
3. Standard serial port ( EIA-232-D) Yes / No
4. Printer Port Yes/No
5. Dedicated serial port for modem Yes/No

(I) PRINTER DATA

1. Printer amplitude (scaling peak to peak)


2. Time Scal (mm / s )
3. Printer resolution mm
4. Auto printing Yes/No

(J) Fault Priority transmission Yes/No

(K) Fault location (distance calculation) Yes/No

(L) Test certificates from internationally recognized Yes/No


Laboratories
(M) COMMUNICATION AND REMOTE ANALYZING
UNIT

1. Processor Pentium (MHz) Yes/No


2. Co-Processor pentium Yes/No
3. Main memory capacity (Mb) Yes/No
4. Color graphics board S-VGA Yes/No
5. Screen S-VGA Yes/No
6. Hard disk unit Yes/No
7. Printer Yes/No
8. Modem Yes/No
*Note: du/dt=Change of voltage, dp/dt=Change of active power, dq/dt=change of reactive power, df/dt=Change of frequency.

PART 7 - SUBSTATION AUTOMATION SYSTEM

Sl. No.
Description Unit Bidder’s Data

1 General Requirement:
Standards to be complied with Substation Automation system
Test Ca. Damp heat steady state
Test Db and guidance; Damp heat cyclic
Digital I/O, Analogue I/O dielectric Tests
Digital I/O, Surge withstand test
Radio interference test
Transient fast burst test
Static Discharge
Electromagnetic fields
Temperature range (min/max) ℃
Relative humidity %

Technical particulars & Guarantees SE-24


Sl. No.
Description Unit Bidder’s Data

Intelligent Electronic Devices (IED’s)


- serial communication interface included?
- Protection & Control IED’s connected same bus?
- self monitoring
- display of measured values
- remote parameterization
- disturbance record upload and analysis
Availability Calculation shall be furnished for each
equipments as well as for the entire system

Main system, HMI, Gateway, IEC have dual communication port

SNTP server provide GPS time synchronization to HMI, Gateway, IED

System topology
2 Detailed Requirements:
Manufacturer of Substation Automation System
Name and type of product in supplier’s catalogue
Origin of manufacturer
Number of years of proven field experience of offered system. Yrs
(Note: proof of experience should be furnished. The
components used in the offered system and those with
field experience should be the same)
Design life of substation Automation System Yrs
Manufacturers quality assurance system
Dimensions of cubicle:
- Width mm
- Depth mm
- Height mm
- Floor load N/㎡
3 Station Level Equipment:
Station Controller
MTBF (Mean time between Failures)
MTTR (Mean time to repair)
Station computer dual connection to Ethernet
Dual wide screen monitor inch
Dual Station Computers Provided in redundant hot
Standby
Hot standby take over time
Annunciator for Station PC system software
Number of years of proven field experience of offered
Yrs
software
Operating System
All standard picture as per spec included in HMI
Process Status Display & Command Procedures
Event processing as per spec
Alarm processing as per spec

Technical particulars & Guarantees SE-25


Sl. No.
Description Unit Bidder’s Data

Reports as per spec


Trend Display as per spec
Graphical Fault l information receiving function
Disturbance & Fault recording and analysis with graphical format
User Authority levels as per spec
System supervision & monitoring as per spec
Automatic sequence control as per spec
4 Gateway to National Load dispatch Center
Manufacturer
Name and type of product in supplier’s catalogue
Origin of manufacturer
Number of years of proven filed experience of offered unit Yrs
Insulation tests
Fast disturbance tests
Industrial environment
Industrial grade hardware with no moving parts
(PC based gateway is not accepted)
Design life of offered equipment Yrs
Redundant communication channel
Redundant CPU
Redundant DC/DC Supply
MTBF (Mean time between Failures)
MTTR (Mean time to repair)
Dual connection to Ethernet
5 Station Bus:
Type of bus/protocol
Physical Medium
Dual connection
Transfer rate/bus speed
6 Interbay Bus
Type of bus/protocol
Physical Medium
Transfer rate/bus speed
7 Printer server
Manufacturer
Name and type of product in supplier’s catalogue
Origin of manufacturer
MTBF
8 Event Printer
Manufacturer
Name and type of product in supplier’s catalogue
Origin of manufacturer
Print speed
Paper feed/width
Character set
MTBF

Technical particulars & Guarantees SE-26


Sl. No.
Description Unit Bidder’s Data

9 Hard Copy colour Printer


Manufacturer
Name and type of product in supplier’s catalogue
Origin of manufacturer
Print speed
Colours
Resolution
Character set
MTBF
10 Master Clock GPS (Global Positioning System) Receiver:
Manufacturer
Name and type of product in supplier’s catalogue
Origin of manufacturer
Stability
MTBF
11 Bay control Unit – HV
Manufacturer
Name and type of product in supplier’s catalogue
Origin of manufacturer
Number of years of proven field experience of offered unit Yrs
Separate Bay controller unit provided for each bay & feeder
Type of bay controller offered HV/MV
Select Before Operate with Open Execute & Close Execute
Single bit dependence
Interlocking, bay & Station wide
Dual connection to Ethernet sw
Synchrocheck function:
- Maximum Voltage difference
- Maximum Frequency difference
- Maximum Phase difference
Double command blocking
Independent settable parameter groups
Local Display Unit
Sequence of event recorder:
- Events
- Time resolution
Disturbance recorder function
Disturbance record transfer function
Comtrde file generation
Comprehensive self-supervision
Battery free backup of events and disturbance records
Insulation tests
Fast disturbance tests
MTBF
MTTR

Technical particulars & Guarantees SE-27


Sl. No.
Description Unit Bidder’s Data

Temperature range: IED’s


- Operation ℃
- Transport and storage ℃
Relative humidity:
- Operating max./min. %
- Transport and storage %
12 Back up control mimic -HV
Manufacturer
Name and type of product in supplier’s catalogue
Origin of manufacturer
Control functionality:
Control of breaker as well as all isolators/earthing switch
(Control functionality should not be affected if bay controller fails)
Key-Locked
Interlock override function
Separate backup control mimic provided for each bay & feeder
13 Bay Control Unit - MV
Manufacturer
Name and type of product in supplier’s catalogue
Origin of manufacturer
Number of years of proven field experience of offered unit Yrs
Separate Bay controller unit provided for each bay & feeder
Control functionality implementation in software:
Select before Operate with Open Execute & Close Execute
Interlocking, Bay & Station Wide
Dual connection to Ethernet sw
Synchrocheck function
- Maximum Voltage difference
- Maximum Frequency difference
- Maximum Phase difference
Local Display Unit
Sequence of event recorder
- Events
- Time resolution ms
Disturbance recorder function
Disturbance record transfer function
Comtrde file generation
Comprehensive self-supervision
Insulation tests
Fast disturbance tests
MTBF
MTTR
Temperature range: IED’s
- Operation ℃
- Transport and storage ℃

Technical particulars & Guarantees SE-28


Sl. No.
Description Unit Bidder’s Data

Relative humidity:
- Operating max./min. %
- Transport and storage %
14 Back up control mimic - MV
Manufacturer
Name and type of product in supplier’s catalogue
Origin of manufacturer

Control functionality:
Control of breaker as well as all isolators/earthing switches
Separate backup control mimic provided for each bay & feeder

15 Bay Control Unit - LV


Manufacturer
Name and type of product in supplier’s catalogue
Origin of manufacturer
Number of years of proven field experience of offered unit Yrs
Separate Bay controller unit provided for each bay & feeder
Control functionality implementation in software:
Select before Operate with Open Execute & Close Execute
Interlocking, Bay & Station Wide
Dual connection to Ethernet sw
Synchrocheck function
- Maximum Voltage difference
- Maximum Frequency difference
- Maximum Phase difference
Local Display Unit
Sequence of event recorder
- Events
- Time resolution ms
Disturbance recorder function
Disturbance record transfer function
Comtrde file generation
Comprehensive self-supervision
Insulation tests
Fast disturbance tests
MTBF
MTTR
Temperature range: IED’s
- Operation ℃
- Transport and storage ℃

Technical particulars & Guarantees SE-29


Sl. No.
Description Unit Bidder’s Data

Relative humidity:
- Operating max./min. %
- Transport and storage %
16 Back up control mimic - LV
Manufacturer
Name and type of product in supplier’s catalogue
Origin of manufacturer
Control functionality:
Control of breaker as well as all isolators/earthing switches
Separate backup control mimic provided for each bay & feeder
17 System Performance:
Exchange of display (First reaction) s
Presentation of a binary change in the process display s
Presentation of an analogue change in the process display s
From order to process output s
From order to updated of display S
18 Deviations
Please state all deviations from specification

PART 8 - FIBRE OPTIC MULTIPLEXER EQUIPMENT

SL.
Description Unit Bidder’s Data
No.
1 GENERAL:
Manufacturer
Model No.
Type
Type of multiplexer
Complying to ITU-T rec.
Transmission Capacity Mbit/s
Access capacity on 64 kbit/s channels
Access capacity on 2 Mbit/s channels
Redundant central processor
Digital cross connect function
2 Available AGGREGATES:
Optical aggregates (ITU-T G.957)
3 Available TRUNK INTERFACES:
HDB3, 2 Mbit/s interfaces per module No.
Complying to ITU-T rec.
HDSL, 2Mbit/s interface: no of copper wires No.
- Capacity on 2Mbit/s or on 1Mbit/s ch
- Capacity selectable ch / pair of wire
4 Available USER INTERFACES
5 Voice interfaces for trunk lines:
1 + 1 com path protection, available for all
Analogue, 4wire with E&M: Input level dBr
Output level dBr
Analogue, 2wire with E&M: Input level dBr
Output level dBr
Digital, 2Mbit/s CAS or PRI
Technical particulars & Guarantees SE-30
SL.
Description Unit Bidder’s Data
No.
6 Voice interfaces for remote Subscriber:
2wire, subscriber side dBr
2wire, PABX side dBr
7 Integrated teleprotection

8 Interface for Commands:


Number of independent commands No.
Transmission time max. ms
Signal voltage Vpeak
1 + 1 com path protection
9 Interface(s) for Differential Protection:
Electrical interface: G.703 kbit/s
Optical Interface kbit/s
10 Data: channels per module
1 + 1 com path protection, available for all
V.24/V.28 (RS-232): up to 38.4kbit/s No.
V.11/X.24 (RS-422): 64kbit/s No.
V.35: 64kbit/s No.
V.36 (RS-449): 64kbit/s No.
G.703: 64kbit/s No.
Ethernet: 10/100 BaseT No.
WAN capacity Mbit/s
Protocols Mbit/s
11 Integrated alarm gathering module:
Number of external alarms per module No.
Auxiliary power supply for ext. contacts
12 Network Management System
Type/Name of configuration tool
For fault / configuration management
For local / remote operation
Data communication network (DCN)
13 Ambient Conditions:
Storage: ETS 300 019-1-1, class 1.2 °C / % hum
Transport: ETS 300 019-1-2, class 2.2 °C / % hum
Operation: ETS 300 019-1-3, class 3.1E °C / % hum
14 Power Supply
Operation VDC
Fully redundant power supply

Bidder shall provide all necessary information which deem to be necessary to complete the project in
all respects.

PART 9 – DIGITAL PABX EQUIPMENT

SL.
Description Unit Bidder’s Data
No.
1.0 GENERAL:
1.1 Manufacturer
1.2 Type
1.3 Complying to ITU-T rec.
1.4 Analogue Trunk Connectivity
1.5 Digital Trunk Connectivity(E1/T1)
1.6 10/100 BaseT Ethernet Connection
1.7 No of Subscribers No.
2.0 Trunk Connectivity
Technical particulars & Guarantees SE-31
SL.
Description Unit Bidder’s Data
No.
2.1 Analogue Trunk
2.1.1 - Loop Start/Ground Start(Via peripheral)
2.1.2 - E&M
2.1.3 - DID(Direct Inward Dial)
2.2 Digital Trunk
2.2.1 - T1
2.2.2 - E1
2.2.3 - ISDN Connectivity using BRI/PRI
2.3 IP Trunk
2.3.1 - 10/100 Mbps Ethernet(IEEE 802.3)
2.3.2 - TCP/IP, H.323, T.38(Switching)

2.3.3 - Voice Compressor : G.711, G729


2.3.4 - QoS(Quality of Signal) : 802.1
2.3.5 - SIP(Session Initiation Protocol): RFC 3261
3.0 Main Features
3.1 - Ring Back
3.2 - Call Forwarding, park, waiting, pick-up
3.3 - Call/Message waiting lamp
3.4 - Hands Free operation
3.5 - Speed Calling, Stored number redial
3.6 - Account Code
3.7 - Automatic Attendant, Auto Answer
3.8 - Automatic Route Selection
3.9 - Call-by-call Service, Call Duration Display
3.10 - Call Transfer, Direct Outward Dialing
3.11 - Hunt Group, Music on Hold
3.12 - Night Service, Off-hook Alarm, Redial
4.0 Network Management System
4.1 Type/Name of configuration tool

4.2 For fault / configuration management


4.3 For local / remote operation
4.4 Data communication network (DCN)

5.0 Ambient Conditions:


5.1 Storage: ETS 300 019-1-1, class 1.2 °C / % hum
5.2 Transport: ETS 300 019-1-2, class 2.2 °C / % hum
5.3 Operation: ETS 300 019-1-3, class 3.1E °C / % hum

PART 10 – PROTECTION

10.1 400 kV Line Distance Protection for Payra, Rampal & Aminbazar –I & II (Main 1)

SL.
Description Unit Bidder’s Data
No.
1 Manufacturer
2 Type designations
3 Phase switched
4 Zone switched
5 Number of zones
Shape of impedance characteristic:
6
Zone 1/Zone 2/Zone 3
Reverse looking element
7
(blocking signal initiation)
Technical particulars & Guarantees SE-32
SL.
Description Unit Bidder’s Data
No.
8 Sensitivity:
Minimum operation current:
8.1 A
Earth faults/Phase faults
Minimum necessary voltage for fault at Zone 1 reach point
8.2 (if applicable): V
Earth faults/Phase faults
Minimum Zone 1 ohmic impedance to which relay can be
8.3 ohms
set
Maximum Zone 1 ohmic impedance to which relay can be
8.4 ohms
set and maintain accuracy
Minimum Zone 2 ohmic impedance to which relay can be
8.5 ohms
set
Maximum Zone 2 ohmic impedance to which relay can be
8.6 ohms
set and maintain accuracy
Maximum Xone 3 ohmic reach:
8.7 ohms
Forward reach/Reverse reach
Arc forward and reverse reach setting independent of each
9 Yes/No
other?
Can resistance and reactance reaches be set
10 Yes/No
independent of each other
11 Directional sensitivity V
12 Current transformer requirements
13 Voltage transformer requirements
14 Back up Zone time ranges: Zone 2/ Zone 3 sec.
15 Method used to clear close-in faults:
which occur when line is already energized in
service
which exist upon line energisation
Has distance protection previously been used in
the type of blocking scheme offered for this
16 contract? Yes/No
If yes:
number of scheme in service/year first in service
Approximate number of years distance relay in service (A c
omplete reference list should be
17
submitted stating client, system voltage and
year of going into service).
18 Zone 1 operating times on fault position:
Earth faults: 0, 50, 90% of relay setting ms (min./max.)
Phase to phase faults: 0, 50, 90% of relay setting ms (min./max.)
Three phase faults: 0, 50, 90% of relay setting ms (min./max.)

10.2 400kV Line Directional Earth Fault Protection (Main 1 BU)


SL.
Description Unit Bidder’s Data
No.
1 Manufacturer
2 Type designations
Current setting range:
3 A
Forward element/Reverse element
Minimum polarizing quantity required for
4
correct directional decision:
Voltage: Forward element/Reverse element V
Current: Forward element/Reverse element V
5 Characteristic angle Degree
6 Time ranges: Blocking scheme/Back up sec
Has protection previously been used in the
7 Yes/No
blocking scheme offered for this contract?

Technical particulars & Guarantees SE-33


8 Current transformer requirements

10.3 400kV Line Distance Protection for Payra, Rampal & Aminbazar –I & II (Main 2)

SL.
Description Unit Bidder’s Data
No.
1 Manufacturer
2 Type designations
3 Range of operating coil settings % of CT rating
4 Range of bias coil settings % of CT rating
5 Recommended operating coil setting % of CT rating
6 Recommended bias coil settings % of CT rating
7 Number of bias coils
8 Minimum sensitivity: Earth faults/Phase faults % of CT rating
Maximum through fault at which the protective equipment i
9 s stable with recommended settings: % of CT rating
Earth faults/Phase faults
10 Inter trip: Operating time/Reset time ms
11 Permissive inter trip:
Time delay setting ms
Operating time after delay setting ms
Reset time ms
Maximum time delay between initiation of fault and
12
emerging of breaker trip circuit
13 Current transformer requirement

10.4 132kV Distance Protection for Madaripur : 1, 2, 3 & 4 , Gopalganj (Old):1 & 2 and
Faridpur: 1 & 2 (Main 1)
SL.
Description Unit Bidder’s Data
No.
1 Manufacturer
2 Type designations
3 Phase switched
4 Zone switched
5 Number of zones
Shape of impedance characteristic:
6
Zone 1/Zone 2/Zone 3
Reverse looking element
7
(blocking signal initiation)
8 Sensitivity:
Minimum operation current:
8.1 A
Earth faults/Phase faults
Minimum necessary voltage for fault at Zone 1 reach point
8.2 (if applicable): V
Earth faults/Phase faults
Minimum Zone 1 ohmic impedance to which relay can be
8.3 ohms
set
Maximum Zone 1 ohmic impedance to which relay can be
8.4 ohms
set and maintain accuracy
Minimum Zone 2 ohmic impedance to which relay can be
8.5 ohms
set
Maximum Zone 2 ohmic impedance to which relay can be
8.6 ohms
set and maintain accuracy
Maximum Xone 3 ohmic reach:
8.7 ohms
Forward reach/Reverse reach
Arc forward and reverse reach setting independent of each
9 Yes/No
other?

Technical particulars & Guarantees SE-34


SL.
Description Unit Bidder’s Data
No.
Can resistance and reactance reaches be set
10 Yes/No
independent of each other
11 Directional sensitivity V
12 Current transformer requirements
13 Voltage transformer requirements
14 Back up Zone time ranges: Zone 2/ Zone 3 sec.
15 Method used to clear close-in faults:
which occur when line is already energized in
service
which exist upon line energisation
Has distance protection previously been used in
the type of blocking scheme offered for this
16 contract? Yes/No
If yes:
number of scheme in service/year first in service
Approximate number of years distance relay in service (A c
omplete reference list should be
17
submitted stating client, system voltage and
year of going into service).
18 Zone 1 operating times on fault position:
Earth faults: 0, 50, 90% of relay setting ms (min./max.)
Phase to phase faults: 0, 50, 90% of relay setting ms (min./max.)
Three phase faults: 0, 50, 90% of relay setting ms (min./max.)

10.5 132 kV Line Distance Protection for Madaripur : 1, 2, 3 & 4 , Gopalganj (Old):1 &
2 and Faridpur: 1 & 2 (Main 2) ----- Not Applicable

SL.
Description Unit Bidder’s Data
No.
1 Manufacturer
2 Type designations
3 Phase switched
4 Zone switched
5 Number of zones
Shape of impedance characteristic:
6
Zone 1/Zone 2/Zone 3
Reverse looking element
7
(blocking signal initiation)
8 Sensitivity:
Minimum operation current:
8.1 A
Earth faults/Phase faults
Minimum necessary voltage for fault at Zone 1 reach point
8.2 (if applicable): V
Earth faults/Phase faults
Minimum Zone 1 ohmic impedance to which relay can be
8.3 ohms
set
Maximum Zone 1 ohmic impedance to which relay can be
8.4 ohms
set and maintain accuracy
Minimum Zone 2 ohmic impedance to which relay can be
8.5 ohms
set
Maximum Zone 2 ohmic impedance to which relay can be
8.6 ohms
set and maintain accuracy
Maximum Xone 3 ohmic reach:
8.7 ohms
Forward reach/Reverse reach
Arc forward and reverse reach setting independent of each
9 Yes/No
other?
Technical particulars & Guarantees SE-35
SL.
Description Unit Bidder’s Data
No.
Can resistance and reactance reaches be set
10 Yes/No
independent of each other
11 Directional sensitivity V
12 Current transformer requirements
13 Voltage transformer requirements
14 Back up Zone time ranges: Zone 2/ Zone 3 sec.
15 Method used to clear close-in faults:
which occur when line is already energized in
service
which exist upon line energisation
Has distance protection previously been used in
the type of blocking scheme offered for this
16 contract? Yes/No
If yes:
number of scheme in service/year first in service
Approximate number of years distance relay in service (A c
omplete reference list should be
17
submitted stating client, system voltage and
year of going into service).
18 Zone 1 operating times on fault position:
Earth faults: 0, 50, 90% of relay setting ms (min./max.)
Phase to phase faults: 0, 50, 90% of relay setting ms (min./max.)
Three phase faults: 0, 50, 90% of relay setting ms (min./max.)

10.6 132kV Line Directional Earth Fault Protection for Madaripur : 1, 2, 3 & 4 , Gopalg
anj (Old):1 & 2 and Faridpur: 1 & 2 (Main 1, BU)

SL.
Description Unit Bidder’s Data
No.
1 Manufacturer
2 Type designations
Current setting range:
3 A
Forward element/Reverse element
Minimum polarizing quantity required for
4
correct directional decision:
Voltage: Forward element/Reverse element V
Current: Forward element/Reverse element V
5 Characteristic angle Degree
6 Time ranges: Blocking scheme/Back up sec
Has protection previously been used in the
7 Yes/No
blocking scheme offered for this contract?
8 Current transformer requirements

10.7 400 kV Busbar Protection

SL.
Description Unit Bidder’s Data
No.
1 Manufacturer
2 Type designations
3 Operating principle, e.g. high impedance
4 Minimum relay setting A
Sensitivity of scheme (allowing for CT
5
magnetizing current, etc.)
Maximum through fault current at which
6 A
protection is stable
7 Current transformer requirements
Technical particulars & Guarantees SE-36
8 Estimated magnetizing current at relay setting A
9 Operating time at twice relay minimum setting ms
Operating time at ten times relay minimum
10 ms
setting

10.8 132 kV Busbar Protection

SL.
Description Unit Bidder’s Data
No.
1 Manufacturer
2 Type designations
3 Operating principle, e.g. high impedance
4 Minimum relay setting A
Sensitivity of scheme (allowing for CT
5
magnetizing current, etc.)
Maximum through fault current at which
6 A
protection is stable
7 Current transformer requirements
8 Estimated magnetizing current at relay setting A
9 Operating time at twice relay minimum setting ms
Operating time at ten times relay minimum
10 ms
setting

10.9 400/135/33 kV Transformer Biased Differential Protection (87)

SL.
Description Unit Bidder’s Data
No.
1 Manufacturer
2 Type designations
3 Range of operating coil settings % of CT rating
4 Range of bias coil settings % of CT rating
5 Recommended operating coil setting % of CT rating
6 Recommended bias coil setting % of CT rating
7 Number of bias coils
8 Minimum sensitivity: Earth faults/Phase faults % of CT rating
Maximum through fault at which the protective equipment i
9 s stable with recommended settings: % of CT rating
Earth faults/Phase faults
Maximum time delay between initiation of fault and
10 ms
emerging of breaker trip circuit
11 Current transformer requirements

10.10 400/135/33 kV Transformer Restricted Earth Fault Protection


SL.
Description Unit Bidder’s Data
No.
1 Manufacturer
2 Type designations
3 Operating principle, e.g. high impedance
4 Minimum relay setting A
Sensitivity of scheme (allowing for CT
5
magnetizing current, etc.)
Maximum through fault current at which
6 A
protection is stable
7 Current transformer requirements
8 Estimated magnetizing current at relay setting A
9 Operating time at twice relay minimum setting ms
10 Operating time at ten times relay minimum ms
Technical particulars & Guarantees SE-37
setting

10.11 400/135/33 kV Inversed Time Overcurrent and Earth Fault Protection

SL.
Description Unit Bidder’s Data
No.
1 Manufacturer
2 Type designations
3 Inversed time element
Range of current settings:
A
Overcurrent/Earth Fault
Range of operating times at highest timing
sec.
setting at ten times current setting
Range of operating times at highest timing
sec.
setting at twice current setting
High set instantaneous element range of settings:
4 A
Overcurrent/Earth Fault
5 Transient overreach at X/R=10
Operating time with Maximum offset current at
6 ms
five times current setting
Burden of relay on minimum inverse time
7 element current setting at a current ten times VA
setting: Overcurrent/Earth fault

10.12 400/135/33 kV Directional Overcurrent and Earth Fault Protection


SL.
Description Unit Bidder’s Data
No.
1 Manufacturer
2 Type designations
Current setting range:
3 A
Forward element/Reverse element
Minimum polarizing quantity required for
4
correct directional decision:
Voltage: Forward element/Reverse element V
Current: Forward element/Reverse element V
5 Characteristic angle degrees
6 Current transformer requirements

10.13 Breaker Failure Protection


SL.
Description Unit Bidder’s Data
No.
1 Manufacturer
2 Type designations
Setting of current elements:
3 A
Phase faults/Earth faults
4 Timer setting range sec.
Burden of relay at minimum current setting at
5 ten times CT secondary rated current during: VA
Phase faults/Earth faults
6 Operating time/Reset time ms
10.14

Technical particulars & Guarantees SE-38


10.15 33kV Over current and Earth Fault Protection
SL.
Description Unit Bidder’s Data
No.
1 Manufacturer
2 Type designations
3 Inversed time element
Range of current settings:
A
Overcurrent/Earth Fault
Range of operating times at highest timing
sec.
setting at ten times current setting
Range of operating times at highest timing
sec.
setting at twice current setting
High set instantaneous element range of settings:
4 A
Overcurrent/Earth Fault
5 Transient overreach at X/R=10
Operating time with Maximum offset current at
6 ms
five times current setting
Burden of relay on minimum inverse time
7 element current setting at a current ten times VA
setting: Overcurrent/Earth fault

10.16 Tripping Relays


SL.
Description Unit Bidder’s Data
No.
1 Manufacturer
2 Type designations
3 Nominal operating voltage V
4 Minimum operating voltage V
5 Operation indicator
6 Operating time at nominal voltage ms
Contact rating:
Make and carry continuously VA
7 Make and carry for 3 sec. VA
Break: resistive W
inductive VA

10.17 Overall Fault Clearance Times


SL.
Description Unit Bidder’s Data
No.
1 400 kV Busbar Faults:
Main protection relay operating time ms
Auxiliary and tripping relay time (where used) ms
Circuit breaker time ms
Total ms
2 132 kV Busbar Faults:
Main protection relay operating time ms
Auxiliary and tripping relay time (where used) ms
Circuit breaker time ms
Technical particulars & Guarantees SE-39
SL.
Description Unit Bidder’s Data
No.
Total ms
4.1 400/135/33 kV Transformer Faults:
Main protection relay operating time ms
Auxiliary and tripping relay time ms
Circuit breaker time ms
Total ms
5 Gopalgonj-Pyra 400 kV Line Faults
5.1 Fault Clearance at Gopalgonj
Distance protection maximum operating time ms
Permissive scheme time delay ms
Auxiliary relay time (where used) ms
Circuit breaker time ms
Total ms
5.2 Fault Clearance at Pyra
Distance protection maximum operating time ms
Permissive scheme time delay ms
Auxiliary relay time (where used) ms
Circuit breaker time ms
Total ms
Gopalgonj-Aminbazar 400 kV Line Faults
5.3 Fault Clearance at Gopalgonj
Distance protection maximum operating time ms
Permissive scheme time delay ms
Auxiliary relay time (where used) ms
Circuit breaker time ms
Total ms
5.4 Fault Clearance at Aminbazar
Distance protection maximum operating time ms
Permissive scheme time delay ms
Auxiliary relay time (where used) ms
Circuit breaker time ms
Total ms
Gopalgonj-Rampal 400 kV Line Faults
5.5 Fault Clearance at Gopalgonj
Distance protection maximum operating time ms
Permissive scheme time delay ms
Auxiliary relay time (where used) ms
Circuit breaker time ms
Total ms
5.6 Fault Clearance at Rampal
Distance protection maximum operating time ms
Permissive scheme time delay ms
Auxiliary relay time (where used) ms
Circuit breaker time ms
Total ms
6 Gopalgonj-Madaripur 132 kV Line Faults:
6.1 Fault Clearance at Gopalgonj
Distance protection maximum operating time ms
Permissive scheme time delay ms
Auxiliary relay time (where used) ms
Circuit breaker time ms
Total ms
6.2 Fault Clearance at Madaripur
Distance protection maximum operating time ms
Permissive scheme time delay ms
Auxiliary relay time (where used) ms
Circuit breaker time ms
Technical particulars & Guarantees SE-40
SL.
Description Unit Bidder’s Data
No.
Total ms
Gopalgonj-Faridpur 132 kV Line Faults:
6.3 Fault Clearance at Gopalgonj
Distance protection maximum operating time ms
Permissive scheme time delay ms
Auxiliary relay time (where used) ms
Circuit breaker time ms
Total ms
6.4 Fault Clearance at Faridpur
Distance protection maximum operating time ms
Permissive scheme time delay ms
Auxiliary relay time (where used) ms
Circuit breaker time ms
Total
Gopalgonj-Gopalganj (old) 132 kV Line Faults:
6.5 Fault Clearance at Gopalgonj
Distance protection maximum operating time
Permissive scheme time delay
Auxiliary relay time (where used)
Circuit breaker time
Total
6.6 Fault Clearance at Gopalganj (old)
Distance protection maximum operating time
Permissive scheme time delay
Auxiliary relay time (where used)
Circuit breaker time
Total

PART 11– SHUNT REACTOR

SL Description Unit Bidders Data


1. Name of manufacturer
2. Model
3. Service conditions:
- External cooling medium -
- Altitude not exceeding m
- Air temperature not exceeding C
Average air temperature in any
one year not exceeding:
- In any one day C
- Average in one year C
4. Rated voltage kV
5. Rated lightning impulse withstand voltage
- HV kV
- Neutral
6. Rated switching impulse withstand voltage
- HV kV
- Neutral
7. Rated power Frequency withstand voltage kV
- HV

- Neutral
8. Rated Capacity
9. Vector Group
10. Method of Earthing
11. Maximum temperature Rise
Technical particulars & Guarantees SE-41
SL Description Unit Bidders Data
- windings
- Top oil
- Hot spot of Core
12. Total Losses at rated voltage & frequency
- Core Loss kW
- Cupper Loss
- Total
13. Cooling
14. Rated Power at Rated voltage & frequency MVar
15. Rated Current A
16. Rated reactance/phase Ω
17. Zero sequence reactance Ω
18. Mutual Reactance Ω
19. Linearity Range of magnetic circuit percent to rated voltage %
20. Reactance during saturation percent to rated reactance %
21. Harmonics %
- Even
- Total
22. Core Design Gapped/Air
Core
23. No. of Core No’s
24. Material & type of Core
25. Type of winding
26. Winding Connection brazed or crimped
27. Type of Insulation Non/Uniform
- HV side
- Neutral side
28. Flux Density at Rated voltage & frequency
- Core T
- Yokes
29. Volts per turn
30. Efficiency %
31. Regulation
- At unity power factor %
- At 0.8 lagging power factor
32. Bushing Current Transformer
-Ratio --
-Class --
-Burden VA
33. Maximum Sound Pressure level dB
34. Oil Type
35. Weight of Active part kg
36. Weight of Oil* kg
37. Total weight* kg
38. Heaviest part for shipment kg
*These values are required for Foundation design & shipping purpose only. During detail design, these values may vary
from Bid value due to attaining desired electrical output.

PART 12– OTHERS

Sl. No.
Description Unit 420kV 145kV 36kV

1 Structural Steel
Type and standard specification
Manufacturer and country
Minimum yield strength Kg/ mm

Technical particulars & Guarantees SE-42


Sl. No.
Description Unit 420kV 145kV 36kV
2

Kg/ mm
Ultimate tensile strength 2

2 Copper Conductors for Earthing system


Type and standard specification
Manufacturer and country
Conductor material
Size of conductors
mm2
(Solid copper rods)
Size of conductors (Flat copper bars)
mm
(Width×Thickness×Bundles)
Rated current A
Short time withstand current kA rms
Peak withstand current kA pk
3 High Voltage Bus Work
3.1 Switchyard Conductor
3.1.1 Tubular Conductors for Busbar
Type and standard specification
Manufacturer and country
Inner diameter mm
Outer diameter mm
Rated continuous current (site rating) A rms
Temperature rise at rated current ℃
Rated short time current kA rms
Peak withstand current kA pk
Weight kg/m
Moment of inertia kg-m2
3.1.2 Busbar conductor for Baybus
connetion
Type and standard specification
Manufacturer and country
Conductor type
Conductor size
Standing
- No. of Al wires
- Dia. Of each wire mm
Overall conductor dia. mm
Cross-sectional area mm2
Rated continuous current (site rating) A rms
Temperature rise at rated current ℃
Rated short time current kA rms
Peak withstand current kA pk
Rated ultimate tensile strength kN
Mass, nominal kg/m
No. of conductors per bundle
Bundle configuration

Technical particulars & Guarantees SE-43


Sl. No.
Description Unit 420kV 145kV 36kV

Bundle spacing
3.1.3 Flexible Bus Conductor
Type and standard specification
Manufacturer and country
Conductor type
Conductor size
Standing
- No. of Al wires
- Dia. Of each wire mm
Overall conductor dia. mm
Cross-sectional area mm2
Rated continuous current (site rating) A rms
Temperature rise at rated current ℃
Rated short time current kA rms
Peak withstand current kA pk
Rated ultimate tensile strength kN
Mass, nominal kg/m
No. of conductors per bundle
Bundle configuration
Bundle spacing
3.1.3 Shield Wire
Type and standard specification
Manufacturer and country
Dia. of galvanized steel wire mm
Stranding
- No. of Al wires
- Dia. Of each wire mm
Grade of wire
Weight of wire kg/km
Minimum breaking strength of wire kN
3.2 Insulators
3.2.1 Station Post Type (for rigid Busbar)
Type and standard specification
Manufacturer and country
Insulator unit, length/height mm
No. of units in each insulator
Power frequency flashover voltage
- Dry kV
- Wet kV
Impulse flashover voltage
- Positive kV
- Negative kV
Power frequency withstand voltage
- 1 min. dry kV
- 10 sec. wet kV
Power frequency puncture voltage kV

Technical particulars & Guarantees SE-44


Sl. No.
Description Unit 420kV 145kV 36kV

Switching impulse withstand voltage, wet kV pk


Lightning impulse withstand voltage kV pk
Radio interference voltage
- Test voltage to ground
kV rms
- Max. RIV at 1.1xUr//3 line to ground volta
micro V
ge, when tested as per IEC 60694
Leakage distance mm
Mechanical values, failing load (min.)
- Cantilever strength N
- Tensile strength N
- Torsional strength N-m
- Compressional strength N
- Combined electrical and mechncal st N
rength
- Impact strength N-m
3.2.2 String Type
Type and standard specification
Manufacturer and country
Insulator unit, length mm
No. of units in each insulator
No. of insulator strings per conductor
(at each end)
Dia. of disc mm
Disc spacing mm
Power frequency flashover voltage
- Dry kV
- Wet kV
Impulse flashover voltage
- Positive kV
- Negative kV
Power frequency withstand voltage
- 1 min. dry kV
- 10 sec. wet kV
Power frequency puncture voltage kV
Switching impulse withstand voltage, wet kV pk
Lightning impulse withstand voltage kV pk
Dry arcing distance mm
Radio interference voltage
- Test voltage to ground
kV rms
- Max. RIV at 1.1xUr//3 line to ground volta
micro V
ge, when tested as per IEC 60694
Leakage distance mm
Mechanical values, failing load (min.)
- Tensile strength N
- Torsional strength N-m
- Compressional strength N
- Combined electrical and mechncal st N

Technical particulars & Guarantees SE-45


Sl. No.
Description Unit 420kV 145kV 36kV

rength
- Impact strength N-m

3.3 Clamps and Fittings


Type and standard specification
Manufacturer and country
Maximum working stresses
All accessories for installation
(bolts, nuts, etc.)

PART -13

12.0 POWER LINE CARRIER EQUIPMENT

12.1 Line Trap 400kV

1.
Manufacturer/model

2. Type

3. Rated continuous current

4. Coil inductance

5. Air temperature operating range

6. Weight of trap

7. Type of protective device

8. Temperature rise at normal rating

9. Dynamic short circuit rating

10. Temperature rise at short circuit rating

11. Working tension of strain (mounted units)

12. Bandwidth blocked band

13. Minimum impedance in working bandwidth

14. Compatibility with IEC Recommendation 353

15. Mounting details

16. MTBF

17. Design Life

18. Equipment technical description

Technical particulars & Guarantees SE-46


12.2 HF Coupling Unit 400kV

1.
Manufacturer/model

2. Type

3. Working temperature range

4. Available bandwidth

5. Tuning range

6. Composite loss over tuning range

7. Line side impedance range for phase/phase coupling

8. Equipment side impedance

9. Drain coil current carrying


 continuous
 for 1 second
 for 3 seconds

10. Isolation transformer voltage withstand for 1 minute

11. Main arrestor voltage

12. Earth switch interlock with door

13. Compatibility with IEC Recommendation 481

12.3 High Frequency Cable


400 kV

1. Manufacturer

2. Type

3. Coaxial or quad

4. Surge impedance

5. Voltage withstand:
 between conductors
 between cores and armouring

Attenuation per km:


 at 50 kHz
 at 400 kHz

12.4 Digital PLC Terminal

1. Manufacturer/model

2. Type

3. Compliance with relevant parts of IEC 495

4. DC voltage working range

5. Service conditions (temperature and RH)

6. Power consumption

Technical particulars & Guarantees SE-47


7. Design life

8. Carrier frequency range

9. Gross bandwidth

10. Teleprotection equipment mounted within the PLC units

11. Technical description of the equipment

12. Type of coupling (phase/phase or inter circuit)

13. Return loss within the carrier frequency band

14. Transmission rate of the digital signal

15. Output impedance

16. Dynamic range of receiver for digital signal

17. Means of RF frequency selection

18. frequency spacing for parallel connections


 between two digital PLCs
 between a digital and an analogue PLC

19. Output power (before hybrid at coaxial cable)

20. Channel terminal power at output to coupling equipment

21. Type of digital modulation available/proposed

22. Calculations to justify operation of the PLC over the transmission lines

23. Any limitations in parallelling of terminals (to digital or analogue PLCs)

24. Required minimum SNR for minimum BER

25. Switching off of parallel PLCs, not to cause interference with working PLCs

26. Spurious emissions

Digital PLC Terminal (Terminal)

27. Maximum transmitting level for parasitic signals:


 0-4 kHz from the band limits
 4-8 kHz from the band limits
 >8 kHz from the band limits

28. Voltage withstand

29. Capacity options available for various services equipped within the digital bit
stream

30. Capacity allocation proposed for this project

31. Speech channel 2W/4W interface

32. Speech channel impedance/levels

33. “Long line” telephone facility

34. Speech channel interfaces available (E&M etc.)

Technical particulars & Guarantees SE-48


35. Service telephone

36. Type of speech codec

37. Compatibility with analogue speech bands

38. Method of telephone signalling

39. Frequency response of speech channel (Ref 800 Hz)

40. Data channel interface

41. Synchronous/asynchronous data channel availability

42. Data signalling transmission rates which can be accommodated

43. FSK Interface

44. VFT signal levels (2W and 4W)

45. Frequency response of VFT channel (Ref 3 kHz)

46. Test facilities

47. Alarm facilities

48. Equipment technical description

49. Terminal MTBF

50. Single or duplicated PSU


Teleprotection Equipment

1. Manufacturer/model

2. Type

3. DC voltage working range

4. Service conditions (temperature and RH)

5. Power consumption

6. Configured for analogue or digital communications media

7. Design life

8. Suitable for direct, permissive, blocking signalling

9. Single/duplication of teleprotection signals

10. VFT channel allocation and bandwidth

11. Frequency or coded signalling

12. Use of guard channel

13. Signal transmission time

14. Modem programmability

15. Means of monitoring communications channel

16. Transmission of “trip/send” signal at increased level

17. No. of signals per terminal

Technical particulars & Guarantees SE-49


18. Facility to hold on output signal

19. Trip extension facility/time

20. Minimum/maximum input pulse and corresponding output

21. No. of receive output contracts

22. Provision of counters

23. Voltage withstand

24. Transmitter level output range

25. Receiver sensitivity range

26. Receiver alarm level or BER referred to nominal

27. Minimum alarm contact closure time

28. No. of alarm contacts

29. 19"/ETSI rack mounting practice

Teleprotection Equipment (Continued)


30. Information to be submitted with the Tender
(a) Technical description
(b) MTBF calculations
(c) Performance graphs/details

12.6 PAX Telephone Equipment and Subscriber Equipment

(a) Exchange equipment

1. Type reference

2. Manufacturer

3. Dimensions of cubicle

4. Rack width

5. Literature reference for typical layout of cubicle

6. Operating temperature range

7. Operating relative humidity

8. Power requirements

9. Mean time between failures

10. Maximum number of local extensions

11. Maximum number of remote extensions

12. Maximum number of trunk lines

13. Maximum number of connecting circuits

14. Method of signalling


 Local extensions 2W
 Remote extensions 4W

Technical particulars & Guarantees SE-50


 Trunk lines 4W
Frequency of audible tones
15.
 Dial tone Hz
 Busy tone Hz
 Ringing tone Hz
 Ringing current Hz
 Ringing current Hz

16. Ring voltage

17. Type of processor

18. Type of memory

(b) Subscriber telephone

1. Type reference

2. Manufacturer

3. Type of dial (rotary/pushbutton)

4. Operating voltage

5. Outdoor bell

6. Type reference

7. Manufacturer

8. Operating voltage

Technical particulars & Guarantees SE-51


POWER GRID COMPANY OF BANGLADESH LIMITED

BIDDING DOCUMENT
FOR

DESIGN, SUPPLY, ERECTION, TESTING & COMMISSIONING OF


400/132 kV AIR INSULATED SWITCHGEAR (AIS) SUBSTATION
AT GOPALGANJ ON TURNKEY BASIS

SCHEDULE F

DEPARTURES FROM THE SPECIFICATION

Bidders are to list all departures from the requirements of the specification in this schedule.

All departures whether they be commercial, financial, technical or of a contractual nature are to be
included and shall be submitted with the Technical proposal

Any item that does not have a departure listed in this schedule will be deemed to be in full accordance
with the requirements of the specification.

No other document or detail accompanying the tender will be considered in evaluating departures.
Bidders are not permitted to offer any alternative to this schedule.

Item Volume Clause Detail of Departure from Specification

Schedule F: Departure from Specification


SF-1
POWER GRID COMPANY OF BANGLADESH LIMITED

BIDDING DOCUMENT
FOR

DESIGN, SUPPLY, ERECTION, TESTING & COMMISSIONING OF


400/132 kV AIR INSULATED SWITCHGEAR (AIS) SUBSTATION
AT GOPALGANJ ON TURNKEY BASIS

SCHEDULE G

PROPOSED ALTERNATIVE STANDARDS TO WHICH


EQUIPMENT SHALL BE PROVIDED

The bidder shall list below all the alternative engineering and design Standards, which he proposes to
use in his design, manufacture and testing of equipment to be supplied. Should these standards differ
from the specified standard in any respect, the bidder shall detail the differences between the proposed
and specified standard.

Compliance with any standard equal or superior to those specified will be considered acceptable.

In the absence of any listed alternative standard, it is deemed that the standards specified in the
Tender documents are fully complied with.

Specified Standard Alternative Standard


Number Title

Schedule G: Proposed Alternative standards SG-1


POWER GRID COMPANY OF BANGLADESH LIMITED

BIDDING DOCUMENT
FOR

DESIGN, SUPPLY, ERECTION, TESTING & COMMISSIONING OF


400/132 kV AIR INSULATED SWITCHGEAR (AIS) SUBSTATION
AT GOPALGANJ ON TURNKEY BASIS

SCHEDULE H

PROPOSED CONTRACT & SITE ORGANISATION

Personnel

Bidders should provide the names of suitably qualified personnel to meet the requirements specified in Section 3
(Evaluation and Qualification Criteria) of Volume 1 of 3 of the Bidding Document. The data on their experience should be
supplied using the Form below for each candidate.

Form PER – 1: Proposed Personnel

1. Title of position*

Name

2. Title of position*

Name

3. Title of position*

Name

4. Title of position*

Name

*As listed in Section 3 (Evaluation and Qualification Criteria).

Schedule H: Proposed contract & site organization and site resources SH-1
Form PER – 2: Resume of Proposed Personnel

Position

Personnel information Name Date of birth

Professional qualifications

Present employment Name of employer

Address of employer

Telephone Contact (manager / personnel officer)

Fax E-mail

Job title Years with present employer

Summarize professional experience in reverse chronological order. Indicate particular technical and managerial experience
relevant to the project.

From To Company / Project / Position / Relevant technical and management experience

Schedule H: Proposed contract & site organization and site resources SH-2
POWER GRID COMPANY OF BANGLADESH LIMITED

BIDDING DOCUMENT
FOR

DESIGN, SUPPLY, ERECTION, TESTING & COMMISSIONING OF


400/132 kV AIR INSULATED SWITCHGEAR (AIS) SUBSTATION
AT GOPALGANJ ON TURNKEY BASIS

SCHEDULE I

DRAWINGS AND DOCUMENTS TO BE SUBMITTED WITH TENDER

The following drawings/documents shall be submitted with the Tender:

1. Typical single line, layout & sectional drawings of substation showing details of construction
and dimensions.

2. Outline drawings of all switchgear equipment:-

(a) Showing installed components, dimensions and weights;


(b) Showing transport dimensions and weights;

3. Outline drawings of all power transformers, auxiliary transformers and Shunt Reactor (if any):-

(a) Showing installed components, dimensions and weights;


(b) Showing transport dimensions and weights;

4. Typical drawing of transformer remote control panel.

5. Following type test certificates of the equipment of similar or higher specifications (higher
voltage & higher capacity) required by the bid shall be submitted as per relevant IEC.

A) Power Transformer & Shunt Reactor

(i) Test of temperature rise


(ii) Lightning impulse test,
(iii) Switching impulse test,
(iv) Long duration induced AC voltage test
(ACLD) and
(v) Separate source AC withstand voltage test
(vi) Acoustic Sound Pressure Level Measurement
(vii) Short-circuit tests or Short-circuit Calculations

Schedule I: Drawings and Documents SI-1


(Note: the Short circuit calculation, it shall be certified from independent Certifying
Authority)

B) GIS Switchgear

Deleted

C) AIS Switchgear

1) Circuit Breaker

(i) Lightning impulse voltage withstand dry test.

(ii) Temperature rise test.

(iii) Power frequency withstand test

(iv) Short time withstand & Peak withstand current test.

(v) Mechanical operation tests.

(vi) Short circuit Current making & breaking test.

(vii) Out of phase making & breaking test.

2) Disconnector & Earthing Switch

(i) Lightning Impulse voltage withstand dry test.

(ii) Power frequency voltage withstand dry test.

(iii) Short time withstand current test.

Note: The Post Insulator (PI) of disconnector (DS) shall preferably be from

DS main part (Contact blade) manufacturer. However, if the PI

manufacturer is different from DS main part manufacturer, the type test of

the DS must be with the same type PI to be supplied alongwith the DS

under this project; that is, the complete DS assembly, including PI, to be

supplied under this project must be type tested.

3) Current Transformer

Schedule I: Drawings and Documents SI-2


(i) Short time current test.

(ii) Impulse voltages withstand tests for current

(iii) Measurement of Errors

(iv) Power frequency voltage withstand test.

(v) Temperature rise test.

4) Voltage Transformer

(i) Temperature rise test.

(ii) Impulse voltages withstand tests for voltage transformers for

service in exposed installation.

(iii) Short circuit test

(iv) Short time over voltage test

(v) Measurement of errors

(vi) Measurements of partial Discharge level.

5) Surge Arrester

(i) Insulation withstand tests


(ii) Residual voltage test
(iii) Long duration current impulse withstand test
(iv) Operating duty test
(v) Internal partial discharge test

6) Wave trap

(i) Impulse voltage test


(ii) Power frequency voltage test
(iii) Temperature rise test
(iv) Radio interferance test
(v) Short time current test
(vi) Measurement of tapping loss & tapping los based on the
blocking resistance

D) Capacitor

Schedule I: Drawings and Documents SI-3


(i) Thermal stability test
(ii) Tangent of dielectric loss angle at elevated temperature
(iii) Voltage test between terminals
(iv) Impulse voltage test between terminals and container
(v) Short circuit discharge test
(vi) Disconnecting test on internal fuses
(vii) Endurance test (special test in accordance to IEC 60871-2)

E) Power Cable

(i) Bending test followed by partial discharge test


(ii) Tan Delta measurement
(iii) Heating cycle voltage test
(iv) Impulse withstand test followed by power frequency test
(v) Short Circuit Capability Test

F) Cable Joint & termination kit ( Cable Accessories)

(i) Partial discharge test at ambient temperature & high temperature


(ii) Heating cycle voltage test
(iii) Impulse withstand test followed by power frequency test
(iv) Short Circuit Capability Test

G) Insulator
a) Post Insulator
(i) Dry lightning-impulse withstand voltage test
(ii) Dry or wet switching-impulse withstand voltage tests
(iii) Dry power-frequency withstand voltage test ( Indoor PI)
(iv) Wet power-frequency withstand voltage test (Outdoor PI)

b) Disk/String Insulator
On insulator unit

(i) Dry lightning impulse voltage withstand test;


(ii) Wet power frequency voltage withstand test;
(iii) Electro-mechanical failing load test;
(iv) Thermal mechanical performance test;
(v) Impulse voltage puncture test;
(vi) Power arc test.

On Complete set

(i) Dry lightning impulse withstand voltage,

Schedule I: Drawings and Documents SI-4


(ii) Wet switching impulse withstand voltage and the power frequency withstand
voltage as appropriate
(iii) Radio Interference & Corona test
(iv) Power Arc Test

H) DC System

1) Battery

(i) Test for capacity.


(ii) Test for retention of charge.
(iii) Endurance Test.
(iv) Ampere-hour ( at 5 hour rate) and watt-hour efficiency test.
(v) Test for voltage during discharge.

2) Battery Charger

(i) Measurement of voltage regulation / AVR regulation at


a) No Load
b) Half Load
c) Full Load

(ii) Efficiency and power factor measurement test


(iii) Temperature rises test so as to determine the temperature rise of SCR,
Transformer primary, Secondary and core, Diode, capacitor, choke and
cabinet etc.

(iv) Measurement of insulation resistance.


a) AC input to earth.
b) AC input to DC output.
c) DC output to earth

(v) DC voltage current characteristic


(vi) High Voltage Tests.
(vii) Determination of regulation
(viii) Measurement of ripple at
a) No load
b) Half load
c) Full load

(ix) Reverse leakage test.

3) DC Distribution Board

Schedule I: Drawings and Documents SI-5


(i) Temperature rise limit
(ii) Dielectric Strength test
(iii) Short Circuit withstand Capability Test
(iv) Clearances and creepage distances Test
(v) Resistance to rusting and to humidity
(vi) Degree of protection

All the offered above equipment except Power Transformer & Shunt Reactor must be
type tested (for the above mentioned type tests) in from independent testing laboratory.
Such type test reports are required to be submitted with bid.

Type test certificates or reports of Power Transformer & Shunt Reactor shall be from
independent testing laboratory or manufacturer's own testing laboratory. Test carried
out at manufacturer's own testing laboratory must have been witnessed by any one or
more of the following persons:

- A representative from an independent testing authority/ laboratory.


- A representative from independent inspection agency.

6. Quality Assurance Certificate ISO9001/9002 Certification (or equivalent) and Quality


Assurance Programme & Typical Quality Plan for the work from the manufacturers of the
following equipment:

(i) Power transformer


(ii) Switchgears (CB, DS/ES, CT, PT)
(iii) Relays & substation automation system
(iv) Fibre Optic Multiplexer Equipment for protection and communication
(v) Under ground power cables
(vi) Surge arrester
(vii) Wave trap
(viii) Shunt Reactor
(ix) DFDR
(x) Battery & charger

Schedule I: Drawings and Documents SI-6


POWER GRID COMPANY OF BANGLADESH LIMITED

BIDDING DOCUMENT
FOR

DESIGN, SUPPLY, ERECTION, TESTING & COMMISSIONING OF


400/132 kV AIR INSULATED SWITCHGEAR (AIS) SUBSTATION
AT GOPALGANJ ON TURNKEY BASIS

SCHEDULE J

PROPOSED SUBCONTRACTORS

The bidder shall propose a list of the Sub-contractors in the following table as per sub-clause 2.7, Item
2, Civil Subcontractors, Section-3, Evaluation and Qualification Criteria, Volume 1 of 3 of the Bidding
Document.

Sl. No. Name and Address of the Subcontractor

Signature ----------------------------------
Date ----------------------------------

Schedule J: Proposed Subcontractor SJ-1


POWER GRID COMPANY OF BANGLADESH LIMITED

BIDDING DOCUMENT
FOR

DESIGN, SUPPLY, ERECTION, TESTING & COMMISSIONING OF


400/132 kV AIR INSULATED SWITCHGEAR (AIS) SUBSTATION
AT GOPALGANJ ON TURNKEY BASIS

SCHEDULE K

COEFFICIENT AND INDICES FOR PRICE ADJUSTMENT

Value on Stated Dates


Coefficient Country of Origin; Source of Index;
Scope of Index Currency of Index Title/Definition Value Date

For Transformer:

a=0.15
b=0.22
c=0.25
d=0.15
e=0.03
f=0.2

Schedule K: Coefficient and Indices for Price Adjustment SK-1