GREENSHIP NET ZERO Presentation For NZH Masterclass
GREENSHIP NET ZERO Presentation For NZH Masterclass
38%
INDONESIA
COMMITMENT
In COP 21 Y2015
“REDUCE GHG 29%”
(41% with international
support) 54%
www.esdm.go.id
PATHWAY TO NET ZERO
2050
100% Net Zero
Carbon
Buildings
Deploying
renewables to
Improving power energy
energy demands - on
Reducing efficiency site, off site or
energy (yielding offsets
demand / higher
consumption outcomes from
fewer
resources)
FRAMEWORK
GREENSHIP NETZERO The certification To be able to meet the There are 2 levels of
eligibility
what
measurement
output
certification apply for system evaluates requirements of GREENSHIP NETZERO
new building and buildings on annual GREENSHIP NETZERO, certification:
existing building that performance-based green building •NET ZERO
has implemented approach. certification is not a REA DY
energy efficient mandatory, but the •NET ZERO
building and eligibility documents CER TIFIED
compensates the and some basic Re-certification in 3
carbon from energy requirements years
consumed with regarding green
renewable energy on- building must be
site, off-site and fulfilled.
carbon offsets.
CERTIFICATION
SCHEME
1. Permit Compliance (Building
Construction Permit): Spatial
Planning, UKL-UPL, Fire Fighting
System , Earthquake Resistance,
Accessibility;
2. Sharing Commitment for Building
Buildings with NB Eligibility Data with GBC Indonesia
GREENSHIP Criteria
Certification
New Buildings
Existing Buildings
Buildings without
EB Eligibility
GREENSHIP
Criteria 1. Permit Compliance (Building
Certification Occupancy Permit): Spatial
Planning, UKL-UPL, Fire Fighting
System , Earthquake Resistance,
Accessibility;
2. Sharing Commitment for Building
Data with GBC Indonesia
Start Registration
NB EB
Registered Project
optional
Pre-Assessment
Workshop
Assessment
Verification*
Verification:
1. Submitted document verification
2. On-site verification Certified Finish
NB CERTIFICATION STEP Start NZ CERTIFICATION STEP
Registration
SKEMA 2 NB
NB Eligibilty Check
Registered Project
optional
DR Award
Pre-Assessment
Assessment Verification*
Registration
SKEMA 2 EB
EB Eligibilty Check
Registered Project
optional
Pre-Assessment
EB Assessment Workshop
Assessment Board
Process
NZ Assessment Verification*
Registered Project
SKEMA 3
optional
Pre-Assessment
Workshop
Assessment
Verification*
Certified Finish
* Verification:
1. Submitted document verification
CERTIFICATION
PROCESS
Tahap Registrasi
Tahapan dengan menyerahkan form registrasi pernyataan minat untuk melakukan sertifikasi Net Zero
dan menyerahkan dokumen pemenuhan kelayakan bangunan (eligibility).
Tahap Assessment
Tahapan yang dilaksanakan apabila dokumen dan bukti pendukung telah disiapkan tim proyek. Tahapan
ini mengulas dokumen dan bukti pendukung untuk memverifikasi apakah proyek bangunan sertifikasi
telah memenuhi per kriteria prasyarat dan per kriteria sertifikasi, serta secara keseluruhan evaluasi dari
level sertifikasi yang ingin dicapai..
Verification
Tahapan yang dilaksanakan untuk mengulas semua dokumen, bukti pendukung, dan verifikasi
lapangan dari proyek sertifikasi yang dilakukan oleh mitra sertifikasi GBC Indonesia.
Energi
2 Ti pe Ba nguna n Ka ntor
Gros s Fl oor Area (m ) 500.00 n
Ti pe Ba nguna Sekol a h
Lua s a n ya ng da pa t di i ns ta l PLTS a ta p (m 2) Kontra k Da ya PLN (kVA) 82
Kontra k 50.00
Da ya PLN (kVA) 197 Mengumpul ka n da ta kons ums i l i s tri k 1 ta hun tera khi r Checklist
Kons ums i Li s tri k/ta hun (kWh/ta hun) 250,000.00
LPD s i s tem penca ha ya a n (W/m 2)
Kons ums i Li s tri k/ta hun (kWh/ta hun) 125,000,000.00 Mengumpul ka n da ta performa s i s tem HVAC exi s ti ng Checklist
Ta gi ha n l i s tri k/ta hun (Rp/ta hun) Rp 6,000,000,000,000.00
IKE ba nguna n (kWh/m 2) 500
Ta gi ha n l i s tri k/ta hun (Rp/ta hun) Ta ri f PLN (Rp/kWh)
Rp 295,000,000,000.00 Mengumpul ka
Rpn da ta s i s24,000,000.00
tem penca ha ya a n exi s ti ng Checklist
Summary: Ta ri f PLN (Rp/kWh) Rp 2,360.00 Ti pe Ba nguna n Ka ntor; GFA > 10.000 m2
Gros s Fl oor Area (m 2)
Energi
500.00
IKE bel um s es ua i s ta nda r, l a kuka n l a ngka h penghema ta n da n peni ngka ta n efi s i ens iGros
s i s tem
s Flpa
oordaArea (m 2)n
ba nguna ta p (m 2)
Lua s a n ya ng da pa t di i ns ta l PLTS a2,100,000.00 Kontra k Da ya PLN (kVA)
50.00 197
LPD s i s tem penca ha ya a n (W/m 2)
Energi
Guna ka n LPD Ca l cul a tor untuk mengeta hui LPD tel a h s es ua i denga n s ta nda r SNI Lua s a n ya ng da pa t di i ns ta l PLTS a ta p (m 2) 5,000.00 Kons ums i Li s tri k/ta hun (kWh/ta hun) 125,000,000.00
*) Apa bi l a ma s i h pa da ta ha p des a i n da pa t mengguna ka n da ta kW/TR da ri dokumen
Jeni s Si s tem HVAC RKS Ai rCool ed Screw <150TR Ta gi ha n l i s tri k/ta hun (Rp/ta hun) Rp 295,000,000,000.00
IKE ba nguna n (kWh/m 2) 500
Performa ns i kWh/TR s i s tem HVAC 0.5 Ta ri f PLN (Rp/kWh) Rp 2,360.00
Checklist
Summary:
Buka a n di ti a p rua nga n da pa t di opera s i ka n s eca ra beba s ol eh penghuni 2 Gros s Fl oor Area (m 2) 2,000,000.00
LPD s i s tem penca ha ya a n (W/m )
IKE bel um s es ua i s ta nda r, l a kuka n l a ngka h penghema ta n da n peni ngka ta n efi s Lua
i enssi asni s ya
temngpada
dapabat nguna n l PLTS a ta p (m 2) 5,000.00
Checklist di i ns ta
Energi
Buka a n di ti a p rua nga n ti da k terha l a ng da ri da l a m a ta upun l ua r rua nga n IKE ba nguna n (kWh/m 2) 59.52
Guna ka n LPD Ca l cul a tor untuk mengeta hui LPD tel a h s es ua i denga n s ta nda r SNIJeni s Si s tem HVAC Ai rCool ed Screw <150TR
Lua s net buka a n > 4% da ri l ua s NLA rua nga n Luas net bukaan = luas bukaan – luas louvre Checklist
Result: Performa ns i kWh/TR s i s tem HVAC
0.5
*) Apabila masih pada tahap desain dapat menggunakan data kW/TR dari dokumen RKS
Checklist
Kesehatan Kenyamanan
Untuk rua nga n denga n buka a n s i ngl e s i de, ja ra k terja uh denga n buka a n ≤ 2H IKE ba nguna n s es ua i s ta nda r ba nguna n Net Zero 2
LPD s i s tem penca ha ya a n (W/m )
H = tinggi ceilling Buka a n di ti a p rua nga n da pa t di opera s i ka n s eca ra beba s ol eh penghuni Checklist
*) Apabila masih pada tahap desain dapat menggunakan data kW/TR dari dokumen RKS
Performa kW/TR s i s tem HVAC tel a h s es ua i s ta nda r
IKE ba nguna n (kWh/mChecklist
Buka a n di ti a p rua nga n ti da k terha l a ng da ri da l a m a ta upun l ua r rua nga n 2
Untuk rua nga n denga n buka a n doubl e s i de, ja ra k terja uh denga n buka a n ≤ 5H ) 62.5
H = tinggi ceilling Checklist
Guna ka n LPD Ca l cul a tor untuk mengeta hui LPD tel a h s es ua i denga n s ta nda r SNI Checklist
Untuk rua nga n denga n buka a n bera da di 2 di ndi ng berdeka ta n, ja ra k terja uh da ri
Lua s net buka a n > 4% da ri l ua s NLA rua nga n Result:
Luas net bukaan = luas bukaan – luas louvre
Kesehatan Kenyamanan
H = tinggi ceilling
Checklist
Kesehatan Kenyamanan
Ti ngka t penca ha ya a n (l ux) memenuhi SNI 03-6197 Set poi nt s uhu pa da termos ta t 24±1oC Checklist Performa kW/TR s i s tem HVAC tel a h s es ua i s ta nda r
Untuk rua nga n denga n buka a n doubl e s i de, ja ra k terja uh denga n buka a n ≤ 5H
Checklist
Set poi nt RH 55 ± 5% H = tinggi ceilling Checklist Guna ka n LPD Ca l cul a tor untuk mengeta hui LPD tel a h s es ua i denga n s ta nda r SNI
Perga nti a n uda ra per uni t wa ktu s es ua i IHC P GREENSHIP NB (bi l a a da mecha ni ca l venti l a ti on) Checklist
Untuk rua nga n denga n buka a n bera da di 2 di ndi ng berdeka ta n, ja ra k terja uh da ri
Checklist
Perga nti a n uda ra per uni t wa ktu s es ua i IHC P GREENSHIP NB Checklist
buka a n ≤ 5H, di ta ri k da ri ti ti k terja uh buka a n
Survey pengguna ba nguna n menya ta ka n >80% nya ma n s eca ra terma l da n kebi s i nga n Checklist
Ti ngka t penca ha ya a n (l ux) memenuhi SNI 03-6197
H = tinggi ceilling Checklist
Set poi nt s uhu pa da Checklist
termos ta t 24±1oC Checklist
Kesehatan Kenyamanan
Terpenuhi nya s i mul a s i kenya ma na n pa da rua nga n denga n venti l a s i a l a mi
Survey pengguna ba nguna n menya ta ka n >80% nya ma n s eca ra terma l da n kebi s i nga n Checklist
Ti ngka t penca ha ya a n (l ux) memenuhi SNI 03-6197 Set poi nt RH 55 ± 5% Checklist Checklist
Emisi Dokumen renca na kegi a ta n pengura nga n emi s i Checklist
Perga nti a n uda ra per uni t wa ktu s es ua i IHC P GREENSHIP NB Checklist
Perga nti a n uda ra per uni t wa ktu s es ua i IHC P GREENSHIP NB (bi l a a da mecha ni ca l venti l a ti on) Checklist
Ti ngka t penca ha ya a n (l ux) memenuhi SNI 03-6197 Checklist
Emisi Dokumen renca na kegi a ta n pengura nga n emi s i Checklist
SUMMARY Survey pengguna ba nguna n menya ta ka n >80% nya ma n s eca ra terma l da n kebi s i nga n Checklist
Survey pengguna ba nguna n menya ta ka n >80% nya ma n s eca ra terma l da n kebi s i nga n Checklist
*) Perlu dilakukan apabila gedung telah masuk 1 tahun operasi
Ketentuan Persyaratan dan Dokumen-Dokumen yang diperlukan telah terpenuhi dan sesuai. Bangunan dapat
dilanjutkan ke Sertifikasi Net Zero. SUMMARY Emisi Dokumen renca na kegi a ta n pengura nga n emi s i Checklist
Ketentuan Persyaratan dan Dokumen-Dokumen yang diperlukan telah terpenuhi dan sesuai. Bangunan dapat Emisi Dokumen renca na kegi a ta n pengura nga n emi s i Checklist
SERTIFIKASI
Dokumen pernya ta a n renca na penera pa n energi terba ruka n di l ua r ta pa k da n/ aDokumen
ta u ca rbonpernya
offs et ta a n renca na penera pa n energi terba ruka n da l a m ta pa k Checklist
Dokumen pernya ta a n renca na penera pa n BMS
*)Apa bi l a l ua s GFA ti da k s a ma a ta u l ebi h da ri ba ta s l ua s a n, ma ka ti da k perl ua s i penca pa i a n renca na ca rbon Checklist
eva lu Checklist
SERTIFIKASI
Dokumen ba l a nce da l a m 1 ta hun opera s i Dokumen pernya ta a n renca na penera pa n energi terba ruka n di l ua r ta pa k da n/ a ta u ca rbon offs et Checklist
SUMMARY KRITERIA SERTIFIKASI di contreng
Dokumen pernya ta a n renca na penera pa n BMS
Dokumen kriteria sertifikasi telah lengkap, silahkan proses ke assessment *)Apa bi l a l ua s GFA ti da k s a ma a ta u l ebi h da ri ba ta s l ua s a n, ma ka ti da k perl u Dokumen eva l ua s i penca pa i a n renca na ca rbon ba l a ce da l a m 1 ta hun opera s i
Checklist
Checklist
di contreng
Dokumen pernya ta a n renca na penera pa n BMS
SUMMARY KRITERIA SERTIFIKASI
*)Apa bi l a l ua s GFA ti da k s a ma a ta u l ebi h da ri ba ta s l ua s a n, ma ka ti da k perl u Checklist
Dokumen kriteria sertifikasi telah lengkap, silahkan prosesSUMMARY
ke assessment
KRITERIA SERTIFIKASI
di contreng
1. Energy Section
Gros s Fl oor Area (m 2) 2,000,000.00
2
Lua s a n ya ng da pa t di i ns ta l PLTS a ta p (m ) 5,000.00
Energi Jeni s Si s tem HVAC Ai rCool ed Screw <150TR
Performa ns i kWh/TR s i s tem HVAC
0.5
*) Apabila masih pada tahap desain dapat menggunakan data kW/TR dari dokumen RKS
2
LPD s i s tem penca ha ya a n (W/m )
*) Apabila masih pada tahap desain dapat menggunakan data kW/TR dari dokumen RKS
2
IKE ba nguna n (kWh/m ) 62.5
Result:
Guna ka n LPD Ca l cul a tor untuk mengeta hui LPD tel a h s es ua i denga n s ta nda r SNI
Emission Section
Survey pengguna ba nguna n menya ta ka n >80% nya ma n s eca ra terma l da n kebi s i nga n Checklist
*) Perlu dilakukan apabila gedung telah masuk 1 tahun operasi
3. Pre-Requisite Summary
SUMMARY
Ketentuan Persyaratan dan Dokumen-Dokumen yang diperlukan telah terpenuhi dan sesuai. Bangunan dapat
dilanjutkan ke Sertifikasi Net Zero.
4. Certification Section
SERTIFIKASI
Dokumen pernya ta a n renca na penera pa n energi terba ruka n di l ua r ta pa k da n/ a ta u ca rbon offs et Checklist
5. Certification Summary
SUMMARY KRITERIA SERTIFIKASI
Dokumen kriteria sertifikasi telah lengkap, silahkan proses ke assessment
SECTION 1 SOLAR PV OPTIMIZATION
PRE-ASSESSMENT
Data Terikat Instruksi RESULT SECTION 1
TDL 1,467.30 Rp User Input Berikut hasil dari 3 skenario yang telah memenuhi syarat:
Kenaikan TDL per tahun
Tax
0.50 %
88.04 Rp
Calculated Value
Fixed Value
(1) Luas lahan dibutuhkan <= Luas lahan tersedia
(2) Daya Inverter < Kontrak Daya PLN
PV Capacity Optimization
TDL + Tax 1,555.34 Rp
Minimum charge hour PLN 40 jam/bulan
Minimum charge power PLN 94,560.00 kWh/tahun
Minimum charge cost PLN 147,072,950.40 Rp Skenario 1: Proporsi PV < 100%
Keterangan Memenuhi syarat (1) dan (2)
NOTE :
DIHARUSKAN kapasitas PV investasi di bawah Batas Kapasitas PV dan
DISARANKAN kapasitas PV Investasi di bawah Kapasitas PV Saturasi
1. Pergantian Udara
a. Ruangan dengan ventilasi alami memenuhi kriteria bukaan dan kriteria pergantian udara sesuai dengan ASHRAE 62.1-2016
sesuai dengan kriteria EEC 4 New Building 2.0
b. Ruangan dengan pengkondisian udara memenuhi kriteria pergantian udara sesuai ASHRAE 62.1-2016 sesuai dengan kriteria
IHC P New Building 2.0
2. Kenyamanan Termal
a. Ruangan dengan ventilasi alami memenuhi standar kenyamanan termal ASHRAE 55-2017 Adapative Thermal Comfort sesuai
dengan kriteria EEC 4 New Building 2.0.
b. Ruangan dengan pengkondisian udara memenuhi kondisi termal pada 24±1oC DB dan 55±5 % RH sesuai dengan kriteria IHC 6
New Building 2.0
3. Kenyamanan Visual
Menggunakan pencahayaan dengan iluminansi (tingkat pencahayaan) ruangan sesuai dengan SNI 03-6197 edisi terbaru sesuai
dengan kriteria IHC 5 New Building 2.0
CRITERIA P1A
Studi Kasus Adaptive Comfort
Metode:
RESULT: Plot monthly indoor operative temperature dan prevailing outdoor temperature harus masuk pada 80% acceptability
(pada garis batasan) sesuai ASHRAE 55
Melakukan survei (Post Occupancy Survey) kenyamanan termal dan akustik pengguna gedung setidaknya sekali dalam 6 bulan
terakhir dan menunjukkan bahwa >80% pengguna gedung puas.
NOTE
Jenis survey kenyamanan termal terbagi menjadi 2 bagian yaitu survey penerimaan kondisi termal ruangan (acceptability survey) dan survey
kepuasan kondisi termal ruangan (satisfaction survey).
Survey penerimaan kondisi termal ruangan menggambarkan penerimaan atau persepsi penghuni terhadap kondisi termal pada saat survey itu
dilakukan, sementara survey kepuasan kondisi termal ruangan menggambarkan kepuasan penghuni terhadap kondisi termal dalam span waktu
tertentu (biasa tiap 6 bulan, namun dapat dilakukan 1 tahun sekali karena Indonesia tidak mengalami musim dingin dan musim panas yang
mengakibatkan perubahan dari operasional bangunan)
80%
f. La i n (tul i s ka n jeni s a kti vi ta s )
8. Apa ka h ya ng s eri ng a nda a tur/uba h a pa bi l a a nda ti da k mera s a nya ma n (bol eh l ebi h da ri s a tu):
a . s ha de a ta u bl i nd jendel a Checklist
b. s uhu termos ta t Checklist
c. Pi ntu ke a ra h rua nga n i nteri or Checklist
d. Pi ntu ke a ra h eks teri or Checklist
e. Ki pa s porta bl e Checklist
5. Sel a ma menghuni rua nga n, es tima s i ka n da ri s ka l a 1 -5 i ntens i tas s umber kebi s i nga n di ba wa h i ni
Form Kenyamanan Akustik
*) 1 = intensitas tidak berarti; 5 = intensitas sangat berarti
a . Sua ra s i s tem AC 1 2 3 4 5
b. Sua ra ora ng berbi ca ra da l a m rua ng 1 2 3 4 5
c. Sua ra ora ng berbi ca ra di l ua r rua ng 1 2 3 4 5
d. Sua ra pera l a tan (mes i n fotocopy, tel ephone, ds b) 1 2 3 4 5
e. Sua ra La l u l i ntas di l ua r ba nguna n 1 2 3 4 5
f. Sua ra bi s i ng da ri l ua r ba nguna n (buka n l a l u l i ntas 1 2 3 4 5
80%
g. La i n s ebutka n ……………………………………………………………………….. 1 2 3 4 5
6. Es tima s i ka n da ri s ka l a 1-5 a pa ka h kebi s i nga n da l a m rua nga n a nda mengga nggu ki nerja ?
9. Apa bi l a terus bekerja denga n tingka t kebi s i nga n ya ng a da da l a m rua nga n a nda s eka ra ng, geja l a a pa ya ng
s eri ng muncul ? (bol eh l ebi h da ri s a tu pi l i ha n)
a . Ti da k a da Checklist
b. Kura ng kons entra s i Checklist
c. Sa ki t kepa l a Checklist
d. Berkura ngnya pema ha ma n da l a m komuni ka s i Checklist
e. La i n s ebutka n: ………………………………. Checklist
10. Seca ra kes el uruha n a pa ka h a nda nya ma n denga n kondi s i a kus tik di rua nga n a nda ?
*) 1 = Sangat tidak nyaman ; 5 = sangat nyaman 1 2 3 4 5
CRITERIA P2A
Memperlihatkan besar Intensitas Konsumsi Energi (IKE) bangunan selama 1 tahun terakhir sesuai Tabel IKE
NOTE
Perhitungan & record berdasarkan IKE bangunan setelah masuk 1 tahun operasi dengan pembagi GFA
CRITERIA P2B
Memperlihatkan besar Intensitas Konsumsi Energi (IKE) bangunan selama 1 tahun terakhir sesuai pada
batas maksimal
NOTE
Besar IKE bangunan ventilasi alami ≤ 55 kWh/m2
Perhitungan & record berdasarkan IKE bangunan setelah masuk 1 tahun operasi dengan pembagi GFA
CRITERIA P2C
COP (Coefficient of Performance) dari Sistem HVAC memenuhi SNI 03-6390-edisi terbaru.
NOTE
Proses testing/pengukuran dilakukan setelah masuk 1 tahun operasi bangunan
Pengukuran dilakukan pada kapasitas pendinginan 100% pada beban pendinginan sesungguhnya.
CRITERIA P2D
LPD (Lighting Power Density) dari Pencahayaan Buatan (Artificial Lighting) memenuhi SNI 03-6197-edisi terbaru
NOTE
Proses perhitungan dilakukan setelah masuk 1 tahun operasi bangunan (kondisi actual bangunan)
Perhitungan dapat menggunakan kalkulator LPD GBCIndonesia
CRITERIA P2D
B. LPD Calculator
Perhitungan LPD Desain dan Baseline
Menyerahkan dokumen kegiatan-kegiatan pengurangan emisi karbon dan perhitungan pengurangan karbon
yang telah dicapai.
NOTE
1. Perhitungan Sektor Energi
a. Penurunan IKE bangunan dari baseline
b. Penggunaan RE untuk operasional bangunan
c. Subtitusi Auxiliary energi
3. Carbon OFFSET
CERTIFICATION LEVEL
>> re-certification in 3 years (*) The project should submit following documents:
• Rooftop PV electricity generation
BAS to collect building performance data & digital (*) Carbon Balance could come from RE On-site, RE Off-site
and Carbon Offset
representation
Carbon Offset is the last stage after project implement RE
On-site and RE Off-site
Carbon Caused – Carbon Balance * ≤ 0
RE SCHEME
NET ZERO READY 2. Not -Enough Space RE ≥ 0,5% Energy Consmp
2b AND
2a Moderate Energy Consumption
the density > 119 Wp/m2
2b High Energy Consumption
N
RE Requirement
? 2a
Start ≥ 2,5% Y
2
1 Proceed Finish
1. Enough Space
RE SCHEME
NET ZERO CERTIFIED
N
RE Requirement 100% of
Employ RE Offsite RE Purchasing Sum up to 100% ?
Energy Consumption
Meet EUI standard and Comfort compliance (**) Tool to calculate optimum solar PV generation will be
provided
Compliance of RE generation
BAS to collect building performance data & digital *) Mandatory only for specific building GFA
representation
Carbon Caused – Carbon Balance ≤ 0 (*) Carbon Balance could come from RE On-site, RE Off-site
and Carbon Offset
Healthy requirement compliance * Carbon Offset is the last stage after project implement RE
On-site and RE Off-site