0% found this document useful (0 votes)
59 views5 pages

Control Charts

This document contains 6 questions related to statistical process control charts. Various control charts like P, C, U, EWMA and moving average charts are constructed and analyzed. For most charts, the process is found to be in control as the points fall within control limits. However, for some charts like the C and U charts, certain points are found to be more than 3 standard deviations from the center line, indicating the respective processes are not in statistical control.

Uploaded by

suhasnu dey
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
59 views5 pages

Control Charts

This document contains 6 questions related to statistical process control charts. Various control charts like P, C, U, EWMA and moving average charts are constructed and analyzed. For most charts, the process is found to be in control as the points fall within control limits. However, for some charts like the C and U charts, certain points are found to be more than 3 standard deviations from the center line, indicating the respective processes are not in statistical control.

Uploaded by

suhasnu dey
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

SUHASNU DEY

INDIAN STATISTICAL INSTITUTE, NEW DELHI,

MBB Batch 2018

Exercises on Control Charts

Question 1 : Monitoring effectiveness of repair group by monitoring requests that require a second
call to complete the repair.

P Chart of Second visit required


0.07

0.06

0.05 UCL=0.05005
Proportion

0.04

0.03
_
P=0.02213
0.02

0.01

0.00 LCL=0

1 3 5 7 9 11 13 15 17 19
Sample
Tests performed with unequal sample sizes

Interpreting the results

Because the points fall in a random pattern, within the bounds of the 3s control limits, we
conclude the process is behaving predictably and is in control.

Question 2 :

C Chart of No of non conformities


9
Test Results
1
8 for C Chart
7 UCL=6.969 of No of
6
non
Sample Count

conformities
5

3
_
C=2.36
2

0 LCL=0

1 3 5 7 9 11 13 15 17 19 21 23 25
Sample
SUHASNU DEY

INDIAN STATISTICAL INSTITUTE, NEW DELHI,

MBB Batch 2018

TEST 1. One point more than 3.00 standard deviations from center line.
Test Failed at points: 13

Interpreting the results

The control chart shows one point that is more than 3 standard deviations away from the
center line. The process producing the plates is not in statistical control

Question 3 : A paper mill uses a control chart to monitor the imperfections in finished rolls
of paper

U Chart of Total number of imperfections


1.6 1

UCL=1.485
1.4

1.2
Sample Count Per Unit

1.0

0.8 _
U=0.718
0.6

0.4

0.2

0.0 LCL=0

1 3 5 7 9 11 13 15 17 19
Sample
Tests performed with unequal sample sizes

Test Results for U Chart of Total number of imperfections

TEST 1. One point more than 3.00 standard deviations from center line.
Test Failed at points: 20

Interpreting the results

The control chart shows one point that is more than 3 standard deviations away from the
center line. The process producing the rolls is not in statistical control

Recommended values :
SUHASNU DEY

INDIAN STATISTICAL INSTITUTE, NEW DELHI,

MBB Batch 2018

Centre Line - 0.718 , UCL - 1.485 , LCL - 0

Question 4 : Workmanship nonconformities in the final inspection of disk -drive assemblies

U Chart of Total number of non conformitie


16
UCL=14.94
14

12
Sample Count Per Unit

10

8 _
U=7
6

0 LCL=0

1 2 3 4 5 6 7 8 9 10
Sample
Tests performed with unequal sample sizes

Interpreting the results

Because the points fall in a random pattern, within the bounds of the 3s control limits, we
conclude the process is behaving predictably and is in control.

Question 5 : Construct EWMA control chart

λ = 0.2 , L = 3 , σ = 0.05
SUHASNU DEY

INDIAN STATISTICAL INSTITUTE, NEW DELHI,

MBB Batch 2018

EWMA Chart of X
UCL=8.0825
8.08
+3SL=8.0825

8.06

8.04
EWMA

__
X=8.0325

8.02

8.00

-3SL=7.9825
7.98
LCL=7.9825
1 3 5 7 9 11 13 15 17 19 21 23
Sample

Question 6 : Moving average control chart

w = 6 , target value for molecular weight 1050 , standard deviation 25

Moving Average Chart of Molecular weight


1200

1150
Moving Average

1100

UCL=1080.6
__
1050 X=1050

LCL=1019.4

1000

1 3 5 7 9 11 13 15 17 19
Sample

Test Results for Moving Average Chart of Molecular weight


SUHASNU DEY

INDIAN STATISTICAL INSTITUTE, NEW DELHI,

MBB Batch 2018

TEST 1. One point more than 3.00 standard deviations from center line.
Test Failed at points: 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20

Interpreting the results

The moving average chart shows 11 points that are more than 3 standard deviations away
from the center line. You should closely examine the processes to improve control over the
molecular weight