s
rs. 614.590 Maton
Contract Amount ne
Date of Commencement we |
Date of Commseton june 08, 2022
Comsieton Pores 304 days
4 Teme Etapses 207 days te
pranned Financial Progress: ae at5.189 Millon based on BA8 TN cash flow ©
ubmited by Contractor on AUGUS OO 2021
no. are
£ Actual Financial Progress: re 18,686 milion (IPC no. 3. gross Work done, PC no. 1&2
fag 2% part of Mobilization Advances Fe 92.180 Million
{Planned Physical Progress: 67.85% (As per Base Line Cash FIOW Estimate)
4. Actual Physical Progress: Approx. Rs.41.37 Million (6.73%)
§ Percentage Time Elapsed. 56.86%
3. PROJECT LOCATION
sector G-14/2, Islamabad and
This project site (Sub Sector-G-15/3 Phase-1) is located ‘adjacent to Sub S
Fae cccessible from Kashmir Highway. trough Service Road ‘West of Sector G-13 and Service
Road North of Sub Sectors G-14/3 and G-14/2.
4, WORKS PROGRESS
Page 4 of 28ww aroor2024
nat Service Road Nor was Ct eH, Work Rrsumad on OctoPer
im stopped upd Mean axcavation work compared ee enact
ea ae ta 9, 10 & 11 vill be compl
f iayor at Stroot # 8,6
Iogiade a
i base unr © rer comploted from AD: 0400 to RD: 13
uD baseAWater Bound Macadam 27d (ay tn Fs
wt Sorvico Fload East (FV/s) AO-13+ rere,
ju base Water Bound M ond layer eomploted at Service Road East
ib basoAWVater Bound Macadam 2nd Ia
Service Road
ace Oe rogress at Service
voato Baso Course/Wator Bound Macadam 1st fayer In proa!
East (L/s) RD-150 10 8+50
RCC Drain work in progr
vii RCC Drain work in progres:
at Sorvice Road
Construction of Rain water Collection Chambors in progre
‘4 RID-150 to 8460 (FVS)
Road E
4 North RD-14400 to RO-
‘ast RID-00 to RD: 18+45
48+00
ess at Service Road East (L/s)
no. 4, 5, 6,7 &9
Sie
x Laying of Sewerage Network Work is in Progress: _
Xi Stoo! Fixing of Sewerage manhole in progress at Street no. 4.6.6 &
4.2 Progress Status since the Start of Works:~
Progress
Sage
Activity Base line | Base line | Achieve
1D Activity name Start Date | End Date_|d Remarks of NESPAK
Service Roads North, Street 4 to
Project Manager has left the
| Job at the end of this
| | December 2021. Electrical
| | Inspector /Supervisor not
| hired yet. Also. Material
| Expert (ME) not provided
| yet. Quantity “surveyor is
‘working on multiple projects.
| | Site, staff is” insufficient to
| meet the requirements of the
Ai000_{ Mobilization at Site | 08-Jun-21 | 17-Jun-21 $0__| ongoing works.
] Works at Service Road
| North & culvert C-1 were
| | stopped by the Employer on |
| 14-08-2021. Works resumed |
A1020 _| Earthwork Cutting 06-Jul-21 | 23-Oct-21 80
| on October 13, 2021| : = 02-Nov
| ~ ‘ 6-Jul-2) 9-Oct-21
Culvert Selected | 7
pee | stauger | 26-060-21|
‘Sub base
1070
| Tack Coat, wearing
1090 _| Coarse
| RCC Sewer Pipe line,
| Water Pipe Line, LT
ornov.21 | 19an22|
|pgroga sass couse | ooecei| a1-reza|
23-Feb-22 | 14:
»__ | Work
100 ;
5 at Service Fload
Work 5a
| With and Culvert tw =
ary tno Employer Of ;
if Instructions to
| {400-2021
sume Works were 1ssued,
| {e'Contractor on October 13.
Boe! but Contractor
| progress of Works at culvert
aa _| Cats very slow
| po (oad
e I St ad
st_| 00. —arerare aT 1 :
rength of culvert and L/s Toe a
15 | wailhas been constructed
3o__| Do.
oa_| pe
00 =
| Sewerage RCC Pipe jointing
and laying work is in
| progress Water supply pipe
laying work not yet started
Contractor has placed HM}
| orders for procurement of f
| HDPE pipe for Water supply ys
| Works. These activities are Uy
under delay. Notice issued
17_| to Contractor
onstruction of RCC
| manholes for sewerage work
is in progress, but progress
of this activity is very slow
12 | Notice issued to expedite |
[RCC drain work started a
Service road Nortt
Line | 22-Aug-24
Sand Back Filing Of |
| Water Pipe Line,
Atii0_| Sewerage etc. | 27-Aug-21 0
|
| |
| Sewerage LT, Water
Supply Manholes, etc
41120 _| construction. 29-Aug-21 works.
|
A1130_| ACC Drain 01-Aug-21 2 | Cont
Got 2Bue 11-Apr-22
3 and Link 01 A
Earthwork cutting oF
Road Ea
Abubakar Road, Umar |
oad (RD- 750 to 1232) has |
been completed. Whereas
possession of st
and some portion of Si
| road East has not bee!
e Employer’
granted by "The Employer |
Employer has to expedite
clearance of land disputes
and issues related to BUPS
| o3-cct21| 96 _| without further delay
Abu Bakar, Umar (RO 800 to 1250) . street t real
‘eas
|
Ai190_| Eanrwork Curing __|_26-Jun
|
Earthwork Embankment |
(A1200_| filing rsuu21| 10-0021 | _60_| 00 :
Sub grade, Sub base,
| Aggregate Base Course |
Ai2i0_| etc. Quarry Approvals _| 06-Jul-21 | 23-Oct-21 | 100
‘Ai220_| Sub grade 15-Juk21 | 11-Nov-21
A120 _| Sub base 28-Sep-21 | 16-Dec-21| 82 |
‘i240 _| aggregate Base Course | o7-Now.2t | 10-Jan-22,
| Tack Coat, wearing
A1260_| Coarse | 11-Jan-22 | 04-Feb-22 |
i Procurement of RCC pipe
| | for Sewerage and HDPE
pipe for water supply is in
progress Water supply pipe
| | | ying work not yet started
| FOO Seat Eeetige | These activities are unde
| 2 ine, delay. Notice issued to
41270 _| Water Pipe Line Of-Aug-2t | 28-Nov.21| 03 _ | Contractor-_ tuna +_caec:tt : | ace drain work i
Prodi etd no work of rain
yaiskenimanabvoovar |
Yond, Umar road
Convactor resources
Goployed on FCC drain are
ineutiient. This work nee
€ bra | easu.or| 10-Nov-21 | 49 | tobe takon up expediously
Pavement Narkings and ; f
" 15-Mar-22 | 29-Mar-22 =
concert under walkway
and ting and Tutt
ai320_| Pavers of Walkway ar ec
L ervico road All, South, Usman (RO 0 10 800) and Street 12 to 30 Link 18.A to 29A
s , Possession of these roads
| | | not granted by the Employer
yet. Employer has to
| expedite clearance of land
| | See ee aes
clearing Grubbing & — | | to BUPs without further
3390 _| Dismanting 01-Sep-24 | 10-Sep-21 dolay
BRR Earinwork Cuting sosep2t| o1Fon22 {00
| Earthwork Embankment |
1350_| filing 15-Sep-21 |_06-Feb-22 Do
] Sub grade, Sub base, |
| Aggregate Base Course
1960 _| etc. Quany Approvals | 06-Jul-21 |
19-Oct-21 -Do.
A1365_| Culvert Excavation 20-Sep-21 |_03-Nov.2 | Do:
| Culvert Selected |
A1366__| material til, Bottom slab | _ 15-Oct-21 |_03-Dec-21 Do-_
A1367_| Culverts wall, Siab | 22-Nov-2
| t9-Feb-22
A1370_| Sub grade | 30-Sep-21 | 26-Feb-22 | Do
|
A1380_| Sub Base 25-Nov-21 | 14-Mar-22
Aggregate Base Course | 20-Dec-21 | 29-Mar-22
| Tack Coat, wearing
Ai4io | Coarse |
ACC Sewer Pipe line,
A1420_| Water Pipe Line, LT _|
Mar-22 | 18-Apr-22
5-Sep-21
Jan-22 Do.20-apr-22 | 14-May-22
615.4 Nullah Channelization works ; Sah CRESTS
Works cannot be tak
because most a the a
pula tals in and 6
Breas and thus Contractor
ont nave enough
possession to star this
| Bcinly Employer nasto |
| expedite clearance of and
disputes and issues related
| | to BUPs without further
inte
| |
[Araso_| pcc. acc ef B-May-22| 0 _| -Do
Elevated water tank (Civil & Plumbing)
7 Possession of area having
| | | UGWT, elevated water tank
and tube well, not granted
| | by the Employer. Employer
| has to expedite clearance of
| | Soil Investigation and | land disputes without further
p20 test Revo 01-Sep-21 | 30-Sep-21
| | Issuance of Str
ture |
A1520_| Drawing 01-0ct21 | 30-Oct-21 | Do
f j
A1530_| Excavation __| 31-Oct-21 | 19-Nov-21 _| -Do- -
| Technical Submittals |
A1595 | and Approval | 01-Dec-21 ‘eb-22
| y
A1540_| Bottom slab | 20-Nov-21 | 14-Dec-2pret
work experionci
By Me. Rai Jv
— ‘Survey Certificate
f wietberionce
inimum relevant
02 Mr, Oty
‘work euparicss Provided yer” Surveyor nek
| toil Expert
il
wa 1 Not available
“T assistont ri ‘ if |
Material \
1 |engineertechnic | ®Sc: Geology 1 Malik Qasim Tariq \
jan |
{Availabili rs it =
yéten he Contactor deployed following staf, siled and unskilled labor a ste ding th mono
Project Manager Replacement not
provided yet)
Civil Supervisor 00
Surveyor o1
Site Engineer 00
Survey Helper 02 it
Lab Technician POMS.
Computer Operator 00
Safety Officer 90
‘Admin Manager / Assistant Admin ee \
Store Keeper/Assistant Store keeper | OO \
1
5t07
Page 1A-4, CBR 19%
sifleati
and quality test?”
Ad, CAR =19%
Sample collected mixed
with 30% sand
ample collected mixed
uth 30 % atone dust
LA® 20.74%, SpGe260,
‘Water Absorp 0.59% ,
Sample Collected From
Site,
Flakine:
Reinforcing Stee!
Yield Strength =74,132 pi
Ultimate Strength=98,175 psi,
Elongation= 14.06%, Weight
Ib/ft=0.382 & Bend=ok
Sample Collected From
Site.
Proctor = 2.147 gico, P. = NP,
Gradation = ok
Sample Collected From
Site,
R.C.C Pipe 12 Inch
Dia=¥2inch
Pipe Length = 7.79 f,
No of Ring Bars = 25,
Dia of Ring Bar (inch) = 0.187,
No of Spiral ring in Collar = 02,
Dia of Spiral ring in Collar (Inch)
= 0.264,
No of Longitudinal Bars = 5,
‘Water Absorption (%) = 3.78
Pipe Bearing Length = 6.125,
Wall Thickness = 2.125,
Pipe Bearing Length = 6.125,
Ultimate Load (Lbs/Lfv{t of Dia) =
3749Testing And
Commissioning o
work and
| Etectrical Ne
5.1 General
The Contractor submitted Programme of Works
of Conditions of Contract.
Approve’
| op.nay-22 | 22-May-22
works
and Cash Flow Est
Programme of We
forks and Cash Flow Ora
timate under Sub-Clause
441 and 143
jh are given below,Sub Base Water an, . . -
Flakinesss 52" _
Yield &
forcing Stee!
Rein % ample Collect
| stone Dust
| Pipe Length 7.75 »
| No of Ring Bars = 25
| Dia of Ring Bar (inchy'= 0
| No of Longitudinal Bars = §
| Water Absorption (%6)= 378
% Pipe Bearing Length = 6.125
| Wall Thickness = 2.128,
Pipe Bearing Length = 6.125.
Ultimate Load (Los/Livt of Dia) =
| 3749 \
| | :98/12/2021
49/12/2021 Sunny t
20/12/2021 Sunny 1
2412/2021 Sunny {
2211212021 ‘Sunny |
23/12/2021 ‘Sunny {
2411212021 Sunny [
25/12/2021 ‘Sunny {
2514272021 Sunny {
27212021 ‘Sunny |
28/12/2021 ‘Sunny |
Sunny |
Sunny \6.2 Work Progress Vs Programmed
The Contrector’s Baseline Programme of Works and Cash Flow Estimate submitted on |
July 10, 2021 are used for the purpose of comparison at this stage. \
As per original Cash Flow Estimate, the Contractor has to achieve financial progress of Rs.415.16
Million by the end of December 2021; which is 67.55% of the Project cost, and can be taken as the
planned physical progress. So far, total estimated Work done of Rs. 41.37 Million has been
achieved which is almost 6.73% of the Project cost and can be taken as up-to-date physical
progress of Works. Taking into consideration the fact, that only possession of 22% area have been
yanted by the Employer.
6.3 Delays
Contractor can't execute Works at the areas where Employer has not given the Possession of
Site, So far, possession of only 22 % area has been granted by the Employer. In order to
complete the Works in time, Employer has to expedite the clearance of land issues with due
expedition and without further delay. Moreover, Contractor has to expedite the works of
‘Sewerage line, storm water drainage, water supply pipe line works, and culvert C1 works, where
possession of site (22%) area is in hand of the Contractor. The Contractor has so far managed to
Page 15 of 28Repo
os Report.
oniny Progr eng pec 2024
of the
tre round Fo. 41.87 sation weet? only approx. 6.73%
ion of Time
6.4 Extensarge of the
snpletion period has been elapsed:
conrmAcTOns’ RECORDS:
a
fe1 contactors Site Personn
=
oe
Minimum Mandatory Staff Required ] mea
Se | Nae] conmacmnyremats |
ea ene |
8 So. cil wt val
PEC Registration |
Mr. Zubair Ahmad (Project
Manager) has left the Job at
| finimum
ot _| the end of December 2021
| Seaane 6 Currently replacement not
years provided yet
B.Sc. Civil, wth valid
PEC Registration
Constructisi# | Muhammad thsan has been
Biicctscor ceo | vari or | hted'as Conetucton
troreet” | een’ so Nneger
years | |
| | hr. Rayaz has been deputed
site | DAE (eivi) | on other Project, and
Minimum relevant replacement not provided yet.
| InspectoriSuper work experienc 02 | Currently there is no site
| 8 years | inspector/supervisor provided
| | at site
ai |
DAE (Electrical)
F Minimum relevant |
Site Inspector | Work experienc 01 _| Notavailable not provides
| Byears |
| \
Page 16 of 28per
oan ses eat |
rr Peover ie
Carpenter / Scaffold
4 Plant & Equipment
& Equipment
As per Contract, the Contractor is required to ensure sufficient arrangement of Plant i
{at ste for timely completion of the Werke However, a8 per Appendix-G to Bid, the Contractor is
required to deploy minimum Plant and Equipment detailed hereunder:
Asphalt Plant 01 No
2 | Concrete Batching Plant 01. No
4 | Vibratory road Roller (10 ton) | 04 Nos. 1
5 As the earthwork ed
i ‘Vibrator
| Sheep Foot Roller (10 Ton) 04 Nos. Con at otal eels
roller not deployed yet
Excavation work of Service
Road North is getting
delayed and quantity of
excavators is not sufficient..
Only one grader provided,
03 Nos. 1 which is often not found in |
working condition. \
Quantity of Dumpers should |
oe Nc Z be increased \
04 Nos, Oto2
02 Nos. 0
Used on Multiple
03 Nos. Atos. «| Sacecrn
Used on Multiple
04 Nos. sia eh ceo
eee
Page 18 of 28savail
pe
jnciAL PROGRESS
AN
jablity of Eaulpmentai
rough installed |
wo by Contractor
41 Monthly Payment Certificates:
i
6.3 Claims
MSKIFEGHA/G-15/40 dated
QUALITY CONTROL
Contractor has raised query/clal
fo, 104-9 vide his letter no.
September 22, 2021. Whereas,
claim vide our letter no. 4156/3:
4156/321/09/ARBI37 dated September 25, 2021
iy | Submission | ve
ea ssion | Verification cross. Cumulative
Ks
ant | Sate date Amount | qmeunt (Re) | “T=”
; sy | oreo
7 August 6, ‘
pAno.1 | August 5, 2024 sort 44 0net7ay. | R5-44.090 1741- | Mobilization
ae 090, | advance
2 October | Acar \
BeAne.2 | Sosa | tas. 46,090,174 | Mobilization |
= | Sas _ "| Advanee |
| November 1, | November 9, Be \
IPAno.3 | 2021 2021 | 18:886.949 | 18,886,949 | Approved
| | | '
7.1; List of IPCs
6.2 Contract Variations
No Variation Order processed as yet.
MSK/FGEHAIG-15/28 dated August 23, 2021 and
O1/09/ARBI27 dated September 15, 2021 and
im for extra lead/ cartage of sand over PWD Schedule 2012 item
letter no.
E.R (NESPAK) has rejected the
letter_no
Page 19 of 28wi 28
ngth = 6 4
88 = 1.25,
Yield Strength
Utimate Strength
longation=14.06%, Weight
IDM =0.384 & Ben ai
Visitors to Site
Chief Engr. FGEHA along with December 21 , 2021
Progress Review
PD FGEHA visited the site
Almost every day
except holidays Progress Review
of Site VisitorsSub Engineer (civin
Material Expert
‘Surveyor
Lab. Technician
Consultants Staff Deployment
gr, NESPAK provided back offce support through its Design and Project Management Section
gn and Contract Management Support Services, ‘i
Consultant's Remarks
Contractor has only 22 % site area, where he can work. Possession of rest ofthe site area has
tot been given by the Employer.
has been taken up on Service Road North (RD- 6+50 to RD- -20+07), Service Road East
(RD- 00 to RD-18+50), Umar road (RD- 7+50 to RD-12+32) , Abu-Bakr road , Street no.
4567,8,9,10,11,12, some part of 13 & 14.
Possession of Ali Road, Usman Road, Service Road South, some part of Umar Road (RD- 00 to
RD- 7450), some part of Service Road North (RD- 0+00 to RD-6+50) and internal streets no.
423, 13(Partial),14 (partial), 15 to 31, has not been granted by the Employer
F ined progress of 67.55%
far 6.73 % physical Progress has been achieved against plan
lear all th without
; * water supply and storm water drainage, culvert
Seed ae oreo enable to Conver. ERIRE NESPAK as gered noes
1 Work, where possession of site is available to
expedite these worksRoad East RD 16460 TO 10460 5
ant; Sub basds* layer Water Bound Macedem at Servicegre 9.4: Concrete Pouring of Sewerage Manhole in progress at Street # 7.
19.5: Visit of CHIEF ENGINEER FGEHA along with other officials of FGEHA, R.E/E.R NESPAK on
25, 2021.
Page 26 of 28ss at Street #7.
te Pouring of Sewerage Manhole in progre
7: Concret. TED
NATIONAL ENGINEERING SERVICES PAKISTAN wel Lime
Nespak House, Sector G-5/2, Istamabad-Pakis!
January 5, 2022
4156/32 1/0S/ARBV62
Project Director! Dy. Director (Technical)
Federal Gover mployees Housing Authority,
40-Mauve Area, Sector G-10/4,
Islamabad
INFRASTRUCTURE DEVELOPMENT WORKS FOR SUB-SECTOR G-15/3,
ISLAMABAD (PHASE-!)
Progress Report for the Month of December 2021 (Progress Report No.7)
ber 2021. This is for your
Dear Sir,
Enclose please find Progress Report for the month of Decemt
information and necessary action please.
Very Truly Yours,
Thanking you,
for National Engineering Services Pakistan Pvt. Ltd,
© $ ae
(Ali “Reka ‘Baloch)
Engineer's Representative!
Resident Engineer
Encl: Two(2) copies of Progress Report
Ceo:-
1. Mr. Salman Shahid, Chief Engineer/Project Manager. NESPAK House, Islamabad
2. M/s MSK International, Office no. 1, 2 Floor, Hassan Arcade, Hillal Road, F-11
Markaz, Islamabad
Phe (92-51) 9221910-13, 9207247-48 —
Fax (92-51) 9221914 TUV
Emait:
[email protected] pk hnente
Website: wow nespak.com.pkRNMENT EMPLOYERS
Yy ISLAMABAD
FEDERAL G
HOUSING AU
INFRASTRUCTURE DEVELOPMENT woRKS FOR SUB-SECTOR
G-15/3, ISLAMABAD (PHASE-1)
oe
PROGRESS REPORT
Report No- o7
Period: End Dec 2021
ITO
[M/S MSK International, Office No.
1, 2nd Ploor, Hassan Arcade,
| Islamabad. ree ei \
Phone: +92-51-9221910-13Fax:+92-81- |
on2i91s
Ph, No. :051-4718994
|: Islamabad @inespak.com,ph
a hntp://www.nespak.com.ph