Technical Guidance For Groundwater Protected Areas in Dubai
Technical Guidance For Groundwater Protected Areas in Dubai
1 Introduction.................................................................................................................................................................................... 5
5.3.2 Well depth, casing diameter, Pump capacity and abstraction volume......................................... 25
List of Appendices
Page 2 of 39
Definitions
Project Any activity, process or developmental plan leading to change the natural existing
features, environmental conditions etc.
Project description is a document that describes the extent, limit and scale of a project. It also provides data
of project location, area coverage, and details of its components, activities and processes
involved. It also provides the information of waste generation and discharges expected
from the project implementation.
Hydrogeological environment
This term is used in this document refers to aspects of groundwater, soil, surface water
and geological environments found in the Emirate of Dubai.
EIA Report (EIA) is the methodical appraisal of the environmental aspects and impacts of a proposed
project. The EIA process also review options and determines appropriate mitigation and
enhancement measures that are needed to minimize, if not to eliminate, any adverse
impacts due to project development.
Project Area Any activity, process, premises or development regardless of scale or magnitude, which
has impact, whether significant or not, on the environment
Area of influence possible influence from project during construction & post construction phase
Groundwater Water occupying all voids within a geologic stratum, which can be extracted, through a
Groundwater well.
Vadose zone is the unsaturated horizon starting from earth surface till first appearance of water level.
Page 3 of 39
Water level Level of groundwater within a dug/open well is termed as water level.
Aquifer Geological formation with significant extents, which can hold and transmit water to the
groundwater wells.
Perched aquifer Geological formation of limited extents usually at shallower depth underlain (or
separated) by impervious layer.
Groundwater protected basins
Protected area demarcated by government for the protection and conservation of
groundwater resources
Dewatering Groundwater extraction to drain and dry the land till certain depth for construction works.
Drawdown Water level decline during pumping is termed as drawdown.
Landfill is the site to be allocated and the approval of its area and limits by the specialized
department for the final disposal of non-hazardous and hazardous waste according to
Dubai Municipality approved standards.
Leachate Means any liquid and suspended materials which it contains, which has percolated
through or drained from municipal solid waste disposal facility..
Leachate plume Means contaminated soil or groundwater, beyond the limits of the deposit waste, which
has been contaminated by leachate from the landfill site.
Contaminant Means a chemical compound, element, or physical/biological parameter, resulting from
human activity, or found at elevated concentrations, that may have harmful effects on
human health or the environment.
Infiltration is the entry into soil or solid waste of water at the soil or solid waste surface
Abbreviations
Page 4 of 39
Introduction
Groundwater is an important resource for irrigation, industrial development & selected ecosystem. Groundwater
constitutes approximately between 20-30% of the total water balance of entire Emirate of Dubai. Increasing
demand and high aridity of the region pose pressure on limited groundwater resources. Hence, the Protection of
groundwater quality is imperative to ensure the protection of healthy ecosystems and maintenance of
environmental values as well as for future economic and population growth. The guidelines document is intended
to support protection of the Environmental media (mainly groundwater & soil) from any undesirable impact borne
out of human activities e.g. recreational, commercial and developmental activities. Hereinafter, project developers,
consultants, contractors, sub-contractors and establishment shall be called as the project.
The main objective of this document is to provide a regulatory framework and technical basis for, and a description
of, the minimum requirements for Groundwater Protected Area (herein after called as GPA) in the Emirate of
Dubai. Most of the developed and developing countries have developed Wellhead Protection Programs and
regulations or guidelines for delineation of wellhead protection areas.
GPAs are the lands necessary for protecting drinking water sources wells and recharge areas. The term “wellhead
protection area” is used to describe the area needed to protect groundwater supplies. It is utmost important to
know how much of an aquifer is affected by a well, because in addition to drawing water to the well, pumping will
also pull any contaminants to the well that might be leaching from the land surface. Therefore, by defining the
wellhead protection area as precisely as possible, one can focus your protection program on the land that is most
critical and that affects the groundwater quality meant for drinking water supply. Fine-tuning of delineation
program for areas that have a direct impact on a resource would strengthen the policy. The process of wellhead
delineation is extremely important, but it can also be difficult and expensive, depending on the needs of the
community. Accuracy becomes important if management tools, such as land-use restrictions, are adopted to
protect the water supply. In such cases, it is important to have a delineated wellhead protection area that can
stand up to potential legal challenges by landowners. In the light of available legislations, DM develop Wellhead
Protection Programs to enhance protection of the Emirate’s drinking water supplies during emergency times.
Page 5 of 39
1.1 Regulatory framework
The groundwater law No 15 (2008) provides a sound legal framework and comprises a description of policies,
principles and guidelines for the end users and water sources. As part of the groundwater management policies,
the Guidelines for Groundwater Protection in Dubai Emirate were developed. The importance of groundwater, the
higher risk of water quality impacts and the improved understanding of groundwater management in recent years
has provided the impetus for having specific guidelines for the protected area. The Groundwater water law No. 15
of 2008 supports the implementation of the various initiatives; demarcation of the protected areas being one of
them. Article 04 of local law no. 15 (2008) provides the legal basis to delineate groundwater-protected basin
within Emirate of Dubai. The article clearly empower DM to allow or restrict groundwater withdrawal. Dubai
Groundwater policy (2015) placed this initiative within the list of strategic programs. DM strategic plan (2016-
2021) defines City Environment sustainability as one of the 5 pillars for developing a happy & sustainable city.
Environment protection and the sustainability of natural resources is one of such main initiative under this pillar,
which drives & strengthen existing groundwater management programs.
Law No (15) of 2008 concerning Groundwater resources protection and management in Emirate of Dubai
Law No (11) of 2003 on Nature Reserves within the Emirate of Dubai.
Federal Law No. (24) of 1999 on the Protection and Development of the Environment.
Local Order No (61) of 1991 on the Environment Protection Regulations in the Emirate of Dubai.
Dubai Supreme council of Energy (DSCE) is working towards Implementation of Integrated Water Resource
Management (IWRM) strategy 2030 to achieve maximum overall cycle efficiency for all uses of water in Dubai.
One of main objective is to bring clarity & accuracy in city’s overall water budget estimates. Based on high
percentage share in total water budget of Dubai Emirate, Integrated Water Resources Management Strategy 2030
advocates effective groundwater monitoring via up to date techniques vis-à-vis classification of groundwater as a
strategic reserve.
A prior knowledge of legal framework and existing groundwater conditions would enable the stakeholders i.e.
Project, planners or individuals to work in better coordination with Emirate policy concerning protection of
groundwater resources. To align with Emirate Groundwater policy, the stakeholders anticipated to be well
informed of existing groundwater legislation, guidelines, baseline groundwater status and various policy within
Emirate of Dubai. The primary focus of Emirate Groundwater policy is to achieve management and sustainability
in continuously decreasing groundwater resources.
Page 6 of 39
1.2 Groundwater Management
According to local Law No. 15 (2008), DM is mandated with the responsibility of groundwater resources
management and protection within Dubai Emirate. Environment Department of Dubai Municipality is primarily
responsible for groundwater management within Dubai Emirate. The groundwater resources managed by NRCS-
ED through the following activities;
Periodic Groundwater Monitoring Programs
Groundwater Permitting System-Issuing drilling permit for Groundwater well/test-monitoring
well/License of groundwater use
Registration of existing (unlicensed) wells
Registration of Groundwater well drilling companies
Emergency complains related to groundwater issues
Groundwater Inventory, Research & Developmental Projects
Technical review of Environmental Impact Assessment (EIA) studies, Hydrogeological studies
Data gathered from groundwater monitoring & research programs, enables NRCS-ED to demarcate Wellhead
protection boundaries through the integration of hydrogeological information.
The intent of Delineation of protected groundwater basin or the wellhead protection program is to prevent
contamination of fresh groundwater resources that have potential to be use as potable water, thus protecting the
health of people using groundwater for potable purpose. A wellhead protection area is defined as the surface and
subsurface area surrounding a well or well field that contaminants are likely to pass through and eventually reach
the water well(s).
With the growing need to sustainably manage our natural resources, increased emphasis has been placed on
holistically managing water resources. This includes consideration of the significant role of groundwater in
maintaining growing demands due to manmade environment and climate variability. High aridity and low rainfall
can be stated as main reason for groundwater scarcity in Dubai Emirate. Groundwater quality requires careful
Page 7 of 39
management due to our increasing reliance on the resource, the high risk of contamination from uncontrolled
sources, and for management of groundwater-dependent ecosystems (GDE). The typically slow-moving nature of
groundwater presents a key management challenge, as impacts can be difficult to predict and may occur over a
long timescale. Key hazardous events or activities include uncontrolled urban and industrial discharges, the cross-
contamination of aquifers, and seawater intrusion caused by excessive use in coastal areas. Sand dunes and sandy
veneers facilitates pollution attenuation if introduced, due to high permeability of sand.
GPA can be defined as the protected area demarcated by competent government authority for groundwater
protection and conservation of fresh quality groundwater based on scientific study where stringent regulations
are applicable. Construction Projects or other anthropogenic activities like farming, recreational, or any other
intrusive activity in close proximity with groundwater-protected area should be in accordance to the provisions
given in this document.
Groundwater resources protected areas have been demarcated using calculated fixed radius technique.
Groundwater within the protected area is considered strategic reserves protected by law no. 15 (2008) and hence
to be protected from any deterioration, pollution, over exploitation etc. Groundwater permits, allocation limits,
number of wells is restricted and based upon strict adherence to permissible limits.
Any proposed activity/project/establishment irrespective of its physical scale, should analyze possible impact on
groundwater resources with the help of hydrogeological study including calibrated mathematical models. Project
proponents, the consultants and the contractors are required to undertake pre-consultation with NRCS to confirm
the scope of the required technical study for assessment of the impact. The groundwater-protected zones are
described below and presented in Appendix-1.
(1) The Inner Protection Zone (Zone A) is drawn to protect existing DEWA supply well fields and provides
protection against contamination. Fixed radius criteria has been employed with 5-year travel time from potable
supply wells, together with other hydrogeological parameters like hydraulic conductivity, hydraulic gradient,
effective porosity etc. This constitute a wellfield or part of sub-basin i.e. relatively smaller in comparison to the
entire wellhead basin. It is very significant in terms of public health and since it is relatively small, implementation
and enforcement are more readily achieved. Its extent is usually defined by groundwater travel time, whereby a 5-
10 year radius is most commonly applied. In the present study, 5-year radius has been adopted. This zone is more
or less characterized by Fresh groundwater water with some exceptions like west of the Lahbab well field where
Page 8 of 39
salinity increases most probably due to upcoming from deeper aquifer. The general water level in this zone is 30
to 60 m below ground level. Groundwater abstraction through pumping wells influence the water levels.
(2) The intermediate Protection Zone (Zone B) (or total source capture area) encompasses the entire recharge
zone of the groundwater catchment area. It provides protection against persistent contaminants. In situations of
intensive groundwater exploitation, it is also significant in terms of resource conservation for potable water supply.
In some cases, the zone is further sub-divided to allow gradational land-use controls beyond the microbiological
protection zone. The selection of travel-time criteria for this subdivision is somewhat arbitrary and the 10-50 year
iso-chrone is most common, to provide attenuation of slowly degrading contaminants or give time for remedial
action to control the spread of pollutants. This zone is more or less characterized by groundwater water having
TDS 2000 mg/L with some exceptions. The general water level in this zone is 30 to 60 m below ground level.
Groundwater abstraction through pumping wells has influenced the water levels and quality.
The groundwater protection zones restrict and manage different landuse activity with respect to its likelihood to
contamination or deteriorate the prevailing groundwater environment. The review of existing landuse pattern
reveals that the agriculture farms are the main landuse type within the protected area that poses threat to
groundwater sustainability. While, unregulated groundwater-pumping, lack of wellhead protection and traditional
irrigation methods are the main groundwater stresses, closely spaced farms add to the state of over-abstraction.
City environmental sustainability advocated in DM strategy 2021 requires that the landuse planning should
consider restriction laid for groundwater-protected area while allocating lands within Zone A & B.
Page 9 of 39
2-Underlying principles for guideline
The main objective of this section is to discuss importance of groundwater as natural resource and provide a
technical basis for, and a description of, the minimum requirements for working within defined groundwater
protected basin in the Emirate of Dubai, in a manner without posing any threat for the Groundwater resources.
The understanding and management of groundwater has improved considerably in recent decades. Using this
improved knowledge and approach, the challenge is to adequately address the assessment of potential water
quality impacts at local and regional scales. Management of potential water quality impacts to groundwater can
be achieved by the application of underlying principles:
Understanding of existing environmental condition
These principles combine fundamental economic and social rationales for the protection of groundwater resources,
incorporating consideration of the current and future value of the groundwater, management or prevention that
is proportional to contamination risk, and responsibilities of the current generation to provide equitable access to
resources for future generations. The Project scope of works shall contain groundwater & soil study including
baseline status and addressing to the effects that are anticipated from said activity. The scope or the objectives
should be framed employing best environmental ethics.
Groundwater protected zone A & B restrict some landuse types, which can pose hazard for the health of
groundwater resources. While some of landuse categories, allocation shall base upon feasibility studies. A general
landuse allocation criterion within groundwater-protected zones is presented in Appendix-2. The feasibility study
or pre-EIA study shall examine the appropriateness of the proposed landuse in a logical manner. More specific
landuse allocation should base on in-situ groundwater dynamics or vulnerability models. The appropriateness of
specific landuse should validated through groundwater modeling studies. Vulnerability models often provide more
Page 10 of 39
insight approach for appropriate landuse classification based on the response of the area for a specific landuse
type. A detailed categorization of the projects subjected to Environmental Impact Assessment (EIA) is given in
DM-ED “Guidance of the Environmental Clearance (EC) Requirements for development and Infrastructure Projects
in the Emirate of Dubai”. For projects within GPA’s, Hydrogeological study serve as additional requirement of the
EIA for Projects with potential effect on soil and groundwater environment. The purpose of the EIA or
Hydrogeological study is that if an activity is permitted within the Groundwater Protected Area, it must be carried
out in such a manner that it will not release contaminants into the groundwater or aquifer, or adversely affect
public groundwater to uphold article 13 & 14 of Dubai law No. 15 (2008) concerning Groundwater protection. In
addition, it must comply with applicable federal, provincial and municipal regulations, orders.
Protected areas contain good quality groundwater resources in the Emirate of Dubai. These groundwater
resources are strategic importance for a variety of reason. The main stress on the Dubai’s groundwater resources
can be categorized as;
The results of rapid urbanization on groundwater quality and quantity are now fairly well documented and include
complex relationships between land cover, runoff and aquifer recharge, contaminant type and load and
unsustainable over-abstraction. Foster et al (1998) also show that rapid urban expansion can result in the loss of
groundwater resources as the upper aquifer suffers from over-abstraction; becomes too polluted for use and is
therefore lost as a resource. Changes in groundwater level, because of urbanization, can also affect the existing
building stock in terms of subsidence and waterlogging of foundations – this problem may become more acute
with climate change. There is increasing recognition of the importance of landuse planning and sustainability of
natural environment. Landuse planning has long been the means through which public infrastructure and services
have been delivered in both the developed and developing world. Relating the landuse development that causes
groundwater degradation and the need to provide sustainable groundwater resources for the people who live and
work in that development is where integrated environmental management is required. In this context, integrated
environmental management of groundwater would require the integration of groundwater protection policies,
waste management policies, pollution prevention policies, and land use planning. Sustainable landuse planning with
respect to Wellfield protected areas has been documented in many developed countries.
Page 11 of 39
2.2-Environmental Quality Standard for Groundwater
The protected groundwater areas management provide safeguard for the strategic groundwater resources. These
areas (especially Zone A) reserved to use as storage and supply of groundwater for potable use during emergency
time. DEWA is harnessing possibilities to enhance strategic groundwater storage through desalination water
injection. Both the Margham and the Al Maha site were evaluated with regard to their suitability for Aquifer
Storage Recovery (ASR). The criteria for evaluating both sites include aquifer geometry (available storage volume,
lithology, etc.), geo-hydraulic parameters (hydraulic conductivity, transmissivity, storativity and yield), aquifer
hydraulics (groundwater levels, flow direction and flow velocity), well performance, requirements for well field
infrastructure (wells, pipelines), existing landuse (limiting ASR size and storage capacity) and operational aspects
during emergencies.
This probably makes management of protected areas extremely important for the Emirate where sustainable
landuse allocation have to be followed strictly. Owing to the anticipated use of groundwater drinking water
standards should be used for the assessment of groundwater quality. In absence of national guidelines for drinking
water values, standards from WHO, USEPA and European legislation have been applied to the characterization
list of parameters.
The protection of the groundwater resources should be based on recent data collected from the area of interest
sufficiently covering the project boundary and outside (preferably). The report should address possible impacts of
construction activities as well as future scenario in relation to groundwater quality and quantity. Specifically, the
baseline study should ensures that the basic components sufficient to address groundwater environment and its
response be taken into consideration. The main components of hydrogeological study are as follows;
Walkover survey & updating land use pattern
Geological, Geotechnical investigation,
Groundwater & Soils investigation (water quality, depth to water level, local & regional
Groundwater flow direction, water balance, dewatering related issues)
Conceptual groundwater model
Likelihood of groundwater impact (contamination/depletion etc)
Groundwater trend (rise) current, during construction & post project
Proximity with Groundwater protected basin
Groundwater flow modeling
Page 12 of 39
Handling hazardous materials
Impact assessment, Mitigation plan & Environmental enhancement (solutions)
Use of modeling results in Impact assessment, Mitigation plan & Environmental enhancement
(solutions) Reporting
Follow up and monitoring
Interpretative cross sections through the proposed development site should be constructed,
at right angles to one another and at a vertical scale that places the proposed development
site in the context of the local geological and hydrogeological regimes. This cross section
should describe the geology and indicate the position of the water table at the proposed
development site. The cross sections should include available borehole information. Where a
conservation site, a groundwater abstraction, or a
groundwater discharge location is located within 2 km of the proposed development site at
least one cross section will pass through these features.
The project location should be identified in relation to protected groundwater areas. Risk
Assessment should be carried out identifying all possible component expected during
initiation, construction and operational phase.
Impact Assessment should be carried out identifying all possible project activities and
expected threats during initiation, construction and post completion phase.
The groundwater monitoring/tests requirement for the project will be required from the time
of initial project plan, constructional phase, following an environmental incident etc.
The project nearing a surface water body and other sources of pollution should include in
their impacts assessment. The project should give expected water requirements of the project.
Also water consumption statistics should be added in periodic or monitoring reports.
The project should consider the likelihood of groundwater rise in futuristic scenario and adopt
permanent solution to alleviate groundwater rise within the area of interest.
Relevant person having educational/professional background in the field of groundwater
hydrology should carry the groundwater study/EIA reporting /EMP. For groundwater
sampling, standard techniques viz. US-EPA should be adopted while for chemical analysis
American Public Health Association (APHA) guidelines should be adopted.
The Standard content of a Hydrogeological report is given in Appendix-3.
Page 13 of 39
The project should not undertake any activity that directly causes or induce chances of
groundwater pollution; and project should ensure this by having a groundwater-monitoring
program.
Projects should consider vertical and horizontal movement of groundwater and consider
monitoring the impact of project related activities accordingly.
The project’s groundwater program should consist of periodic monitoring of water quality and
water levels.
NRSC reserves the right for additional information from project, amend or update this
document as deemed necessary.
The project should consider impact assessment if any surface water is present or has a plan
for lake, pond, and water recreational activities within the project boundary.
Modeling studies often require seeing complex environment behavior in totality of course with applied threats
(stresses). Base this specific requirement upon project components like geographical extents, intrusive character,
distance from groundwater-protected basin, impact on groundwater environment etc. Consultant may add
groundwater-modeling study considering the project impact of the hydrogeological environment.
2.4.1-Conceptual modeling
Preparation of conceptual model involves identification of the study area, identifying nature of boundary
conditions, estimate groundwater budget, hydraulic properties of vadose zone, aquifer parameters with the
consideration of all sources and sinks. One of the important sources, especially for phreatic aquifer, is groundwater
recharge. Unconfined sandy aquifers are more vulnerable to surficial activities. Model should consider impacts of
all possible component of to imitate expected impacts borne out of any activity/project etc.
A suitable modelling technique employing Numerical or analytical methods should be adopted with proper
rationale. The model should be validated and calibrated with known data set and realistic scenarios be adopted to
show case the problem domain. MODFLOW is the most popular groundwater/transport code based on block-
centered Finite Difference Method. Modeling study requires that the conceptual model be detailed with all input
data.
Page 14 of 39
2.4.3-Aquifer Vulnerability modeling
For specialized project, where, landuse allocation appropriateness for specific project/activity is in question,
Aquifer vulnerability model should be prepared to logical analysis of the likelihood of contamination with special
reference to the area and regional scale too. DRATIC is the most popular aquifer vulnerability model.
Artificial recharge is defined as the practice of artificially increasing the amount of water that enters a groundwater
reservoir. An artificial recharge installation may serve more than one purpose. In certain areas, for example,
artificial recharge not only adds water to the available groundwater supply, but also is a means of disposing of
storm water runoff. In another instance, artificial recharge to control salt-water intrusion from deeper aquifer is
also increasing the available supply of fresh water and alleviating a ground subsidence condition that has been in
progress for years. Some of relevant purposes for which artificial recharge is practiced are given below;
This requires a detailed hydrogeological and groundwater modeling study to discuss appropriateness, suitability,
effectiveness and impact assessment associated with artificial groundwater recharge.
Everything that influence groundwater storage quantity form a part of groundwater budget. The evaluation of
groundwater budget employing widely applicable techniques is mandatory is large-scale project/activity (by size
or by impact). A precise budget is a prerequisite of hydrogeological and groundwater modeling study.
Page 15 of 39
3- Risk Assessment, Mitigation and Environmental enhancement
Integrate information given in Section 2 to generate an effective risk impact assessment for the project/activity.
The objectives of the impact assessment exercise may differ, as may the intended end user of the information.
This summary provides a simple overview of key issues and approaches. The purpose of mitigation measures is to
avoid, reduce or minimize undesirable impacts and enhance beneficial impacts on the environmental media.
Environmental scientists are required to utilize high professional ethics to select, gather and execute information
concerning relevant impacts, mitigation and enhancement. The list of possible activities should not be considered
as comprehensive and the practitioner must use professional judgment to identify other hazards associated with
the activities present with their framework and where there is any doubt, should adopt the precautionary principle.
The generic Activities identified are outlined below
Earthworks
Dewatering Works
Storage / Transmission of leachable or hazardous materials
Excavations of materials above & below the water table
Infiltration from surface water features & utilities (all types of water use)
Change in area physiography, abutting Storm water flow
Pre & post construction water usage & possible impact
The process for managing the protection of groundwater quality is one of risk assessment that identifies where
action is required, followed by implementation of management measures to protect groundwater quality so that
it continues to meet all its identified environmental value categories. These risk assessment techniques can be
easily translated into a land use policy approach that draws on the traditions of zonal planning, can be used in
development control, is pragmatic and flexible while providing for safeguards for groundwater resources. This is
the ‘suitable for use’ approach. In many respects, the suitable for use approach to land use planning has its origins
in Environmental Impact Assessment whereby the impacts of a development project are assessed against existing
and potential environmental conditions of a site. The principles underlying this
Page 16 of 39
Fig.1 Risk assessment model
3.1-Impact Assessment
The proponent must provide an assessment of potential impacts. The impact assessment will vary depending on
the trigger of the hydrogeological assessment (e.g. a significant recharge area may require a water balance). The
assessment of potential development impacts may include, but is not limited to, a description of the following
potential impacts;
Changes to water table elevation (including seasonal fluctuations)
Changes in groundwater flow direction
Alterations to infiltration/recharge/discharge rates and volumes on varying time scales (i.e., daily monthly
or annual depending upon proximal environmental features)
Impacts on water quality and quantity
Impacts to nearby receiving surface waters (wetlands, watercourses or other significant features)
Impacts to environmental features
Change in local storm water flow
Effective risk management will enable protection of the groundwater as well as minimizing the costs of corrective
measures. A risk-based approach could include a fully quantified risk assessment or it could consist of a more
qualitative approach to estimating risk with a lower reliance on detailed baseline data. The key objective of
Page 17 of 39
adopting a risk-based approach is to guide investment in groundwater quality protection that is commensurate
with the level of risk to the assigned environmental value for the groundwater system. It allows governments,
service providers, industries and communities to prioritize investment in the areas that face the greatest risk.
Gather all information given in Section 2 to integrate hydrogeological characteristic and project activities to
identify potential impacts. Identify the environmental receptors within the estimated Zone Of Influence or
downstream of the discharge, which may be affected through the project dewatering. Identify data gaps in the
baseline information and potential mechanisms of impact. Undertake an analysis of the likelihood and significance
of impacts to each environmental receptor to determine EMP decision matrix. The likelihood of impact is based on
probability where low is unlikely (less than 10%), medium is possible (10% to less than 50%) and high is more
likely than not (50% or greater). Identify and report relevant project specific factors that could be considered
when evaluating the significance of impact. Potential Environmental Impacts can be divided into the following
parts.
Page 18 of 39
3.1.2-Impacts during Operational (Post project Phase)
This section should cover (and not limited to) post project impacts;
Impact of different types of waste disposals
Total water use and resultant leakages
Likelihood of groundwater level rise
Impact of groundwater level rise
Impact of recreational water/irrigation features
Storm water generated
Residual risk, which is the remaining risk after preventative and management measures have been applied
3.2-Mitigation measures
Preventative measures to mitigate risks need to be identified for all hazards for which the risk is medium or high.
If the residual risk is not acceptable, further mitigating measures are considered in a multi-barrier approach until
the residual risk is low. Uncertainty is managed through monitoring, review and adaptation of groundwater
protection measures where necessary, recognising that the costs of remedial measures are generally many times
the costs of prevention. The section should include recommendation(s) for actions to mitigate potential impacts
identified through the hydrogeological studies. Specific measures should be described to mitigate the potential
impacts identified in Section 3.1. Mitigation recommendations shall address both the anticipated long-term and
short-term impacts. To this end, a monitoring program to address potential impacts prior to, during and post-
development may be requested by the Conservation Authority at its discretion. In this case, a contingency plan
may also be required (see contingency plans). Mitigation measures are case variant therefore should include but
are not limited to;
Recharge or infiltration basins for urban runoff
Page 19 of 39
Preservation of protected groundwater areas from undesirable recharge/discharge areas
Sedimentation control plans to prevent siltation of recharge/discharge areas
Re-orientation of local surface water drainage
Provisions for land use and site control plans (e.g., tree cutting restrictions, soil use related conditions,
prohibition of use or storage of specified contaminants, access restrictions, etc.)
Safe handling of waste and chemicals and Contingency plan
Page 20 of 39
3 Construction Environment Management Plan
The Environmental Management Plan is an action-oriented document for environmental safeguard from project
activities. It summarizes the results of the studies undertaken in section 2 and section 3. The CEMP provides
detailed mitigation, monitoring, and contingency plans, and provides a detailed plan for reporting and
communications for implementing the CEMP based on adaptive management principles.
Page 21 of 39
3-4 Reporting Requirements
The CEMP should outline procedures for reporting requirements, including the frequency and content of required
reports, such as the following:
Page 22 of 39
4 Sampling, Monitoring & Well drilling Requirements
Monitoring reports should consist of the summary of continuous or periodic monitoring of planned groundwater
monitoring program. The sampling and monitoring is required in the Environmental reports and later required to
be submitted periodically (as approved) for review and approval as outlined in a permit during Construction
Environmental Management Plan (CEMP), Operation Environmental Management Plan (OEMP) or as stated
otherwise by NRCS-ED.
Based on evaluation of initial groundwater data and the nature of the project, a Monitoring Program
should be prepared detailing frequency and sampling parameters.
Page 23 of 39
Representative soil sampling should be done following standard techniques. The baseline soil tests are
given in Appendix-6.
Representative soil & groundwater sampling means that it should cover important influence from or
to the project activities.
Sampling frequency should sufficient account environmental/climatic response and validation of
proposed/ongoing/future activities.
The Lower detection limit (LDL) of parameters should be less than standard guidelines limit of World
Health Organization (WHO) and DIV 2000 as applicable for groundwater quality criteria.
The laboratory conducting required tests should have Emirates International Accreditation Centre
(EIAC) approval to carry out requested parameters.
Page 24 of 39
DM reserves the right to suspend the drilling permit/license of groundwater use temporarily or permanently
based on violations of general terms and conditions or any other specific reason deemed appropriate to
permitting authority.
Appendix-7 present groundwater use related allocation limits within Groundwater protection zones. Well
permits/licenses issues by DM-ED manage the groundwater allocation criteria.
Page 25 of 39
Casing diameter (conductor and screen) shall not exceed by the limit criteria set by Environment Department,
Dubai Municipality.
The abstraction volume per day per well is defined for its maximum limit, this shall not exceed in any case.
Further, the allocation of abstraction volume will be based on specific requirement of user and general
groundwater conditions in that region.
Keeping high power pump capacity un-necessarily is waste of money and energy. For sustainability issue, Pump
capacity should be in accordance with daily abstraction volume and should withstand future groundwater
decline.
The high power pumps will put negative impact on groundwater resources. Whilst high capacity pumps are
unhealthy for the groundwater environment, same time they are violating the rights of rest of the users mainly
in the neighborhood.
Page 26 of 39
concrete foundation, and the top well cap or metal cover box. The metal cover box is fixable through four (04)
screw at the corners and can be removed easily at the time of well repairing.
The flow meter should be installed on production well as per the design outlay.
Groundwater wells which are no longer in use or have left half way during drilling exercise should be abandon
in a manner that prevent any kind of contamination from these wells. The proper abandoning of such wells is
crucial as they may act as a pathway for the groundwater contamination.
Article (4 & 14) of Dubai law number (15), 2008, concerning protection of Groundwater in the Emirate of
Dubai, exposing groundwater resources to any kind of pollution is considered as violation of groundwater use
policy and subject to penalty. A groundwater well will qualify for abandonment if
o Dry
o temporary wells after requested time duration
o cancellation of well permit due to any reason
o yield reduced to a level not acceptable for users
o Physico-chemical water quality criteria makes it unsuitable for use
o presence or indication of any material other than water
o well with unknown status
All obstructions in the well shall be removed prior to commencing to seal the well. Remove all material from
the water well, such as the pump, pipe, pump cylinder, and electric cable. Approved sealing materials consisting
of neat cement, sand cement, concrete, or bentonite should be used for sealing the well. Other approved sealing
material well-proportioned mixes of silts, sands, and clays (or cement), and native soils.
Place fill disinfected material (pea gravel, impervious clay material, or limestone chips) from the bottom of the
well to below the point where the casing is to be removed. In the upper part of the well, place the sealing
material—bentonite approved for water-well sealing, clean clay, or neat cement grout. Concrete or cement
may be used if the upper part of the well is dry.
Using proper equipment and safety devices, remove at least the top 2 meters of the well casing. The casing
will be either brick, stone, concrete block, porous tile, or other material. The remaining 1-meter deep hole is to
be filled with topsoil (Appendix 9).
Page 27 of 39
List of Appendices
Page 28 of 39
Appendix 2 : Land uses/Activities allocation status within Groundwater protected zones
Protected Basins
S.No. Items
Zone A Zone B
Not permitted.
Project for Environmental
15 Construction Projects
enhancement, protection and
management are allowed.
Page 29 of 39
Appendix 3 : Standard Table of content for Hydrogeological study for EIAR
Hydrogeological
Section Contents EIAS/EIAR
Study
Regional-Geology, Hydrogeology
Introduction
drainage & sewerage)
Identification of direct & indirect threats
from existing & proposed landuse
Local-Geology, Hydrogeology & Storm water
handling
Establish baseline Groundwater & Soil
conditions
Sampling maps (Location coordinates,
sampling photos)
Representative Groundwater levels &
Quality
Depth to groundwater, Groundwater
elevation maps
Baselines
Integration of Geotechnical finding
(Lithology, structure, permeability, water
level, SPT etc) and conclusion drawn
Additional aquifer tests to understand
aquifer behaviors
Environmental soil testing & quantitative
assessment
Page 30 of 39
Groundwater budget integrating all
influential components
Develop conceptual Gw model integrating all
Conceptual
In & OUT components (in text & as
model
schematic diagram)
Develop initial conditions with site specific
aquifer parameters and steady state model
Numerical
Modeling Transient stage-Calibration & Validation
Impact/Risk Assessments
Page 31 of 39
Appendix 4 : Standard Table of content for Environmental Monitoring Report
Project Name
Executive Summary Project Description
Reporting Requirements
Summary of EIA
Monitoring Protocols
Monitoring Protocols and Standards Monitoring Standards
Instruments & Test methods
Methods
Monitoring time & Frequency
Monitoring Programs Monitoring locations
Quality assurance/Errors
Monitoring results
General description
Exceedance comparing to applicable
Non Compliance
standard/background conc. (DIV
2000)
Conclusions & Recommendations
Page 32 of 39
Appendix 5 : Groundwater quality parameters
Page 33 of 39
31 Nickle mg/L 0.07 2.1 75
32 Zinc mg/L 3 24 800
33 Mercury mg/L 0.006 0.01 0.3
34 Oil & Grease-Free oil mg/L 0.01***
Pesticides
Alachor 0.02
Aldrine 0.00003 0.009
Chlordane 0.0002 0.02 0.2
Dieldrin 0.00003 0.1
Endrin 0.0006 0.04
35 mg/L
Lindane 0.002
Methoxychlor 0.02 9
OP-DDT 0.001 0.01
PP-DDT 0.001
Pendimethaline 0.02
Trifluralin 0.02
36 Phenols mg/L 0.2 2000
37 Benzene mg/L 0.01 0.2 30
38 Hydrogen sulphide mg/L 0.05**
39 Total Cyanide mg/L 0.3 5 1500
40 Dissolved Oxygen mg/L
41 BOD mg/L
42 1, 2 dichloroethane mg/L 0.03 7 400
43 Dichloromethane mg/L 0.02 0.01 1000
44 E. Coli No./100 ml 0
45 Total Coliform No./100 ml 0
No./100 ml @37
46 Total Bacterial Count Celceus 0
*TDS= 0.65xEC, **Threshold values, ***EU standard
Coordinates of sampling location(s)
Date/time of Sampling
Sampled after well purging by (Bailer/Pump)
Total project area
Depth (measured) to water level (m)
Base map, Depth to water level map, Water elevation contour map, piezometer photos
Page 34 of 39
Appendix 6 : Soil quality parameters
Page 35 of 39
Appendix 7 : Groundwater management allocation criteria within protected area
Protected Basins
S.No. Items Outside PA
Zone A Zone B
1 Max. Well depth (m) 70 80 90
Max. Well casing diameter
2 6 6 8
(inches)
3 Max. Discharge (l/min.) 50 60 80
Page 36 of 39
Appendix 8: Groundwater well schematic design & head protection
Page 37 of 39
Appendix 9: Criteria for Groundwater well abandoning
Page 38 of 39