1) The document reports the daily HSE activities and metrics for two contractors, PT. IndoCipta Gemilang and PT. Wifgasindo, working on the BCD Project. 2) For PT. IndoCipta Gemilang, there were 4 workers with a total of 40 manhours worked today. All lagging and leading safety indicators were reported as zero or unchanged from the previous day. 3) For PT. Wifgasindo, there were 2 workers with 20 manhours worked. Their safety indicators were also all reported as zero or unchanged. 4) No construction activities or permits to work are reported for either contractor for the day. Support for

Uploaded by

Asrarudin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
78 views1 page

HSE Daily Report May 03,2020

1) The document reports the daily HSE activities and metrics for two contractors, PT. IndoCipta Gemilang and PT. Wifgasindo, working on the BCD Project. 2) For PT. IndoCipta Gemilang, there were 4 workers with a total of 40 manhours worked today. All lagging and leading safety indicators were reported as zero or unchanged from the previous day. 3) For PT. Wifgasindo, there were 2 workers with 20 manhours worked. Their safety indicators were also all reported as zero or unchanged. 4) No construction activities or permits to work are reported for either contractor for the day. Support for

Uploaded by

Asrarudin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

PETROCHINA INTERNATIONAL JABUNG LTD

BCD PROJECT HSE DAILY REPORT


BCD Project Construction
Reported Date: 3-May-20

I. PROJECT AND CONTRACTOR DATA


I.1 PT. INDOCIPTA GEMILANG
1 Project Name : BCD-513-CA (EPCC of Gas Turbin Generator-D and WHRU)
2 Project Commenced : November 22th 2018

I.2 PT. WIFGASINDO


1 Project Name : PCJ-3078-CA (Hamilton Cable Replacement)
2 Project Commenced : October 23rd 2019

II. MANPOWER & MANHOURS


MAN POWER MAN HOURS
NO COMPANY
Previous Today Previous Today Total Manhours Safe Work Days

1 PT. IndoCipta Gemilang 4 4 223,411 40 223,451 518

2 PT. Wifgasindo 2 2 4,976 20 4,996 181


TOTAL 6 6 228,387 60 228,447
III. LAGGING INDICATOR
PT. INDOCIPTA GEMILANG
Desciption Previous Today Description Previous Today Remarks
Fatality 0 0 Fire Case 1 0
Lost Workday Case 0 0 Vehicle Incident 0 0
Restricted Workday Case 0 0 Environment Impact 0 0
Medical Tratment Cases 0 0 Property Damage 1 0
First Aid Case 0 0 Security Cases 0 0
Occupational Illness 0 0 Near Miss 2 0
PT. WIFGASINDO
Desciption Previous Today Description Previous Today Remarks
Fatality 0 0 Fire Case 0 0
Lost Workday Case 0 0 Vehicle Incident 0 0
Restricted Workday Case 0 0 Environment Impact 0 0
Medical Tratment Cases 0 0 Property Damage 0 0
First Aid Case 0 0 Security Cases 0 0
Occupational Illness 0 0 Near Miss 0 0
IV. LEADING INDICATOR
PT. INDOCIPTA GEMILANG
Description Previous Today Description Previous Today
Tool Box Meeting 441 0 Safety Patrol 16 0
Observation Card 164 0 Permit To Work Audit 1 0
HSE Induction 341 0 HSE Audit 5 0
Safety Talk 33 0 Hygiene Inspection 4 0
HSE Meeting 13 0 Equipment Inspection 117 0
ERP Drill 2 0 Management Walk Through (MWT) 1 0
Driver Forum 1 0 Job Safety Analysis (JSA) 59 0
HSE Training 13 0 Safety Alert/ HSE Buletin 8 0
PT. WIFGASINDO
Description Previous Today Description Previous Today
Tool Box Meeting 0 0 Safety Patrol 0 0
Observation Card 0 0 Permit To Work Audit 0 0
HSE Induction 6 0 HSE Audit 0 0
Safety Talk 0 0 Hygiene Inspection 0 0
HSE Meeting 0 0 Equipment Inspection 0 0
ERP Drill 0 0 Management Walk Through (MWT) 0 0
Driver Forum 0 0 Job Safety Analysis (JSA) 0 0
HSE Training 1 0 Safety Alert/ HSE Buletin 0 0
V. CONSTRUCTION ACTIVITIES AND PERMIT TO WORK
PT. INDOCIPTA GEMILANG
No Description Location Type of Permit Dept In Charge

PT. WIFGASINDO
No Description Location Type of Permit Dept In Charge

VI. OTHERS ACTIVITIES


No Description

1 Involve and support company program as Covid-19 Issue

Reported by,

Asrarudin
BCD Project HSE Coordinator