100% found this document useful (1 vote)
31 views1 page

EER U2100 Layering MR

The document appears to be a material request form for an Ethio Telecom regional project. It includes fields for requestor and approver names, a material list with item codes, descriptions, quantities and functionality statuses, and sections for material facilitation and receiving details.

Uploaded by

jemal yahyaa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
31 views1 page

EER U2100 Layering MR

The document appears to be a material request form for an Ethio Telecom regional project. It includes fields for requestor and approver names, a material list with item codes, descriptions, quantities and functionality statuses, and sections for material facilitation and receiving details.

Uploaded by

jemal yahyaa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Ethio Telecom Regional 287 U2100 Layering Project

Material Requester
Project Name: - ………………………………………………. Request No: - ………………………………………………………
MR Requesting Regine: - …………………………………. MR Requested ET Regine: - ……………………………………….

Requester Name: - …………………………………………… Request Approver Name: - ……………………………………….

Position: - …………………………………………………………. Position: - …………………………………………………………………


Date: - ……………………………………………………………… Date: - ………………………………………………………………………
Signature: - ……………………………………………………… Signature: - ………………………………………………………………

Reason of Requesting: - …………………………………………………………………………………………………………………………………………....

Material List
NO Item Code Description Unit Measure Quantity Functionality Status
1 NW05.05846 1H (27010878) with It’s Bracket PC 27 Functional
2 NW03.06412 2H (27010880-001) with Its Bracket PC 8 Functional
3 NW03.00057 RF Pole With It’s Accessories PC 30 Functional
Material Facilitator
From Where house/Site: -…………………………………... To Where house/Site: -……………………………………......
Given By: - …………………………………………………………. Approved By: -: -……………………………………................
Position: - ……………………………………………………………. Position: -: -…………………………………….......................
Signature: - …………………………………………………………. Signature: -……………………………………........................
Date: - ………………………………………………………………. Date: -: -……………………………………............................
Material Receiving Body
MR Receiving Engineer Name: -………………...... MR Receiving Driver: -……………………………………...................
Ethio ID: -: ……………………………………................... Ethio ID: -…………………………………….........................................
Position: -: -……………………………………................. Car Plate Number: -…………………………………….......................
Signature: -: ……………………………………................ Signature: -…………………………………….....................................
Date: -: -……………………………………....................... Date: -…………………………………….............................................
Transported From ………………………………...Regine to ………………………………………………………………. Regine

Date of Transportation …………………………………...

140 Phase one MR Prepared by EER

Prepared By Jemal Yahyaa February 3, 2023

You might also like