Road Widening
Road Widening
B. ROADS
B.1. ROADWAY SECTION
STRAIGHT LINE DIAGRAM R-1 8
ROAD GEOMETRIC DESIGN, HORIZONTAL & VERTICAL CURVES R-2 9
DESIGN PARAMETERS & TYPICAL PLAN OF A TWO LANE PAVEMENT R-3 10
TYPICAL CROSS AND ENLARGE SECTION R-4 11
PRE-CAST CONCRETE CURB & GUTTER R-5 12
DETAIL OF REFLECTORIZED THERMOPLASTIC PAVEMENT MARKINGS R-6 13
SOLAR STREET LIGTHING DETAIL R-7 14
STRAIGHT LINE DIAGRAM FOR MISC. STRUCTURES R-8 15
DRAINAGE PLAN R-9 16
MANHOLE DETAIL - 1 R-10 17
MANHOLE DETAIL - 2 R-11 18
SCHEDULE OF REINFORCEMENT AND BAR BENDING SCHEDULE R-12 19
TRAFFIC MANAGEMENT PLAN R-13 20
ROAD SAFETY R-14 21
SANITATION PLAN R-15 22
DETAILED PLAN OF FIELD OFFICE R-16 23
PROJECT BILLBOARD R-17 24
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED AS TO DESIGN CONCEPT: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - JAY - R M. ACOB
INDEX OF DRAWINGS ENGINEER II
REGION IV-A NETWORK DEVELOPMENT- ROAD WIDENING- SECONDARY FAUSTINO MARK ANTHONY S. G 2
ROADS, QUEZON ECO-TOURISM RD, K0147+270 - K0147+650 PREPARED:
QUEZON II DISTRICT ENGINEERING OFFICE CHARLOTTE KAYE A. CONSTANTINO DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL
2 7 29
LUCENA CITY ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER OIC - DISTRICT ENGINEER
MARLO P. DE CHAVEZ
LOCATION: SARIAYA, QUEZON DATE: DATE: DATE: DATE:
ENGINEER II
LEGENDS
EXISTING TOPOGRAPHIC FEATURES NEW TOPOGRAPHIC FEATURES
CONTOUR BOX CULVERT NIPA HOUSE PROJECT ROAD TRAVERSE DIRECTION GPS STATION
3
OF FLOW
54 45
LEFT
BANANA / CORN / RIGHT PRIMARY TRAVERSE
SINGLE PIPE CULVERT WOODEN HOUSE C
L OF PROJECT ROAD DITCH FLOW DIRECTION
COCONUT PLANTS PLAN & PROFILE
POINT
PLAN PROFILE
GRASS GUARDRAIL ARTESIAN / DEEP WELL DOUBLE RC PIPE CULVERT NORTH SIGN RIGHT-OF-WAY
PLAN PROFILE
CLIFF KILOMETER POST BENCH MARK EMBANKMENT FINISHED GRADE STONE MASONRY FOR
ON PROFILE CUT SLOPES (SMCS)
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED AS TO DESIGN CONCEPT: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - JAY - R M. ACOB
REGION IV-A NETWORK DEVELOPMENT- ROAD WIDENING- SECONDARY LEGENDS AND SYMBOLS ENGINEER II
G 3
FAUSTINO MARK ANTHONY S.
ROADS, QUEZON ECO-TOURISM RD, K0147+270 - K0147+650 PREPARED:
QUEZON II DISTRICT ENGINEERING OFFICE CHARLOTTE KAYE A. CONSTANTINO DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL
3 7 29
LUCENA CITY ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER OIC - DISTRICT ENGINEER
MARLO P. DE CHAVEZ
LOCATION: SARIAYA, QUEZON DATE: DATE: DATE: DATE:
ENGINEER II
DE S I G N SYMBOLS
STRUCTURE SYMBOL (TYPE) DESCRIPTION FIGURE STRUCTURE SYMBOL (TYPE) DESCRIPTION FIGURE
ROADWAY RETAINING
PCC-A CONSTRUCTION OF NEW PCCP t1 = 250 mm SM - TYPE II-B STONE MASONRY
PAVEMENT t2 = 200 mm WALL EMBANKMENT SECTION
t1
t2
DS - Ad TRIANGULAR SECTION
W.S.
W.S.
GROUTED
RIPRAP GR GROUTED RIPRAP FOR EMBANKMENT SLOPE
NOTES:
1. ON PLAN AND PROFILE, ALL THE STRUCTURE WORKS WHICH ARE 4. ALL STRUCTURES SHALL COMPLY WITH THE REQUIRED STANDARD,
REPRESENTED SEE APPLICABLE DRAWING
BY SYMBOLS ARE SHOWN ON BOTH SIDES OF THE ROAD. 5. THE LETTER INSIDE PARENTHESIS DESCRIBED THE TYPE OF
2. STATION LIMITS AND LENGTH OF EACH WORK SHALL BE DETERMINED MATERIALS FOR ALL DRAINAGE STRUCTURES, CATCH BASIN,
IN THE FIELD AND APPROVED BY ENGINEER. RETAINING WALL, GUARDWALL, SHOULDER PROTECTION AND JOINT
3. PORTLAND CEMENT CONCRETE PAVEMENT RECONSTRUCTION (PCCP) SEAL. EXAMPLE DS-(C)-A, LETTER C REFERS TO CONCRETE.
BLOCK, STANDARD SIZE OF THE SLAB 3.05m X 4.50m. 6. ALL DIMENSIONS ARE IN METERS UNLESS OTHERWISE STATED
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED AS TO DESIGN CONCEPT: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - JAY - R M. ACOB
REGION IV-A NETWORK DEVELOPMENT- ROAD WIDENING- SECONDARY LEGENDS AND SYMBOLS ENGINEER II
G 4
FAUSTINO MARK ANTHONY S.
ROADS, QUEZON ECO-TOURISM RD, K0147+270 - K0147+650 PREPARED:
QUEZON II DISTRICT ENGINEERING OFFICE CHARLOTTE KAYE A. CONSTANTINO DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL
4 7 29
LUCENA CITY ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER OIC - DISTRICT ENGINEER
MARLO P. DE CHAVEZ
LOCATION: SARIAYA, QUEZON DATE: DATE: DATE: DATE:
ENGINEER II
PROJECT SITE
6.00m.
K E Y M A P
N O T T O S C A L E
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED AS TO DESIGN CONCEPT: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - JAY - R M. ACOB
KEY MAP ENGINEER II
REGION IV-A NETWORK DEVELOPMENT- ROAD WIDENING- SECONDARY
LAYOUT PLAN FAUSTINO MARK ANTHONY S. G 5
ROADS, QUEZON ECO-TOURISM RD, K0147+270 - K0147+650 PREPARED:
QUEZON II DISTRICT ENGINEERING OFFICE LOCATION MAP CHARLOTTE KAYE A. CONSTANTINO DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL
5 7 29
LUCENA CITY VICINITY MAP MARLO P. DE CHAVEZ
ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER OIC - DISTRICT ENGINEER
LOCATION: SARIAYA, QUEZON DATE: DATE: DATE: DATE:
ENGINEER II
GENERAL CONSTRUCTION NOTES
1.0 SPECIFICATIONS 8.0 CONCRETE 9.4 UNLESS OTHERWISE SHOWN ON THE DRAWINGS, THE CLEAR DISTANCE BETWEEN
1.1 ALL WORKS SHALL COMPLY WITH THE "DPWH STANDARD SPECIFICATIONS FOR 8.1 CONCRETE STRENGTH BY CLASS. PARALLEL BAR SHALL NOT BE LESS THAN THE NOMINAL DIAMETER OF THE BARS
HIGHWAYS, BRIDGES AND AIRPORTS", 2013 EDITION. NOT 1 - 1/3 TIMES THE MAXIMUM SIZE OF THE COARSE AGGREGATE WHEN
28 DAYS CYLINDER STRENGTH MAX SIZE OF COARSE AGGREGATE
CLASS mm. ( in ) REINFORCEMENT IN THE BEAMS OR GIRDER IS PLACED IN TWO OR MORE LAYERS.
2.0 DIMENSIONS MPa PSi
A 20.70 3,000 38 ( 1 - 1/2 ) THE CLEAR DISTANCE BETWEEN LAYERS SHALL NOT BE LESS THAN 25mm. NOR ONE
2.1 DISTANCE BETWEEN HORIZONTAL CONTROL POINTS INCLUDING REFERENCE POINTS B 16.50 2,400 50 ( 2 ) BAR DIAMETER AND THE BARS IN THE UPPER LAYER SHALL BE PLACED DIRECTLY
ARE MEASURED AND EXPRESSED IN METER. C 20.70 3,000 12.7 ( 1/2 )
ABOVE IN THE BOTTOM LAYER.
D 37.70 5,000 19 ( 3/4 )
2.2 UNLESS OTHERWISE SPECIFIED, DIMENSIONS OF PIPES, BOX CULVERTS, BRIDGES
LEAN 9.90 1,400 9.5 EXCEPT OTHERWISE SHOWN ON THE DRAWINGS, MINIMUM CONCRETE COVER SHALL
AND OTHER STRUCTURES ARE MEASURED AND EXPRESSED IN MILLIMETERS.
BE PROVIDED FOR REINFORCEMENT AS FOLLOWS.
2.3 ALL OTHER DIMENSIONS ARE EXPRESSED IN METERS. 8.2 ALL EXPOSED CONCRETE EDGES SHALL BE CHAMFERED OR AS DIRECTED
BY THE ENGINEER.
3.0 STATIONING
3.1 STATIONING OF ROADS BRIDGES, RCPC AND OTHER STRUCTURES AND ELEMENTS OF 9.0 REINFORCING STEEL MINIMUM CLEAR
MAX SIZE OF COARSE AGGREGATE mm. ( in )
HORIZONTAL AND VERTICAL CURVES SHOWN ON THE PLAN ARE RECKONED FROM 9.1 THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS TO THE ENGINEER FOR COVER, mm. (in)
THE ROADWAYS CENTERLINE. CONCRETE IN A MARINE ENVIRONMENT OR CONCRETE
APPROVAL PRIOR TO FABRICATION. SHOP DRAWINGS SHOULD SHOW DETAILS FOR CAST AGAINST AND PERMANENT EXPOSED TO EARTH. 75 ( 3 )
3.2 STATIONS ARE LOCATED AT EVERY 100.00m., AT EVERY CULVERT AND BRIDGE FABRICATION AND FOR PLACING REINFORCING STEEL. ONLY THOSE NECESSARY FOR CONCRETE EXPOSED TO EARTH OR WEATHER
APPROACH, AND AT EVERY PARTICULAR POINT OF HORIZONTAL GEOMETRY. THE PROPER LOCATION OF THE STEEL ARE REQUIRED ON THE DRAWINGS. BENDING PRIMARY REINFORCEMENT 50 ( 2 )
STIRRUPS, TIES & SPIRAL 40 ( 1 - 1/2 )
DETAILS MAY BE SHOWN ON A SEPARATE SHEET. CONCRETE NOT EXPOSED TO WEATHER OR IN
4.0 HORIZONTAL AND VERTICAL ALIGNMENT CONTACT WITH GROUND
9.2 NO MORE THAN ONE BAR IN THREE SHALL BE SPLICED AT THE SAME SECTION
4.1 NO ALTERATION / CHANGE IN ALIGNMENT SHALL BE MADE UNLESS EXISTING FIELD PRIMARY REINFORCEMENT 40 ( 1 - 1/2 )
UNLESS OTHERWISE SHOWN SPLICING SHALL BE KEPT TO A MINIMUM AND SHOULD STIRRUPS, TIES & SPIRAL 25 ( 1 )
CONDITIONS SO WARRANT AND ONLY UPON APPROVAL BY THE ENGINEER. CONCRETE DECK SLABS
BE STAGGERED AND LAPPED NOT LESS THAN 40 BAR DIAMETER UNLESS OTHERWISE
4.2 FINISHED GRADE ELEVATION SHOWN ON PLAN AND PROFILE SHEETS REFERS TO THE TOP REINFORCEMENT 50 ( 2 )
SHOWN ON DRAWING. WHERE THE CLEAR DISTANCE BETWEEN LAPPED BARS DO BOTTOM REINFORCEMENT 26 ( 1 )
FINISHED GRADE LEVEL AT CENTER AS SHOWN ON TYPICAL ROAD SECTION.
NOT MEET THE REQUIREMENTS IN ITEM 12.4 THE CONTRACTOR SHALL USED
4.3 GROUND LEVEL SHOWN ON THE PLAN AND PROFILE SHEETS REFERS TO THE
CRANKED SPLICES AS DETAILED BELOW.
ELEVATION OF ORIGINAL GROUND ALONG THE CENTERLINE OF THE PROJECT ROAD.
ALL CORRECTIONS / CHANGES IN GRADIENTS WILL BE DONE ON THE ORIGINAL 10.0 PAVEMENT DESIGN
MIN. 4
GROUND UPON THE APPROVAL OF THE ENGINEER. OFFSET 10.1 ADOPT 0.30m. thk. PCCP
MAX. d+3
5.0 ROAD CONNECTIONS AND SHOULDER IMPROVEMENT 11.0 HYDRAULIC DESIGN ANALYSIS
DIAMETER = 11.1 K0147 + 270.00 - K0147 + 540.00 ( LEFT SIDE )
5.1 APPROACHES AND CONNECTIONS SHALL BE CONSTRUCTED BY THE CONTRACTOR
AS SHOWN ON THE PLAN OR AS DIRECTED BY THE ENGINEER IN SUCH MANNER AS TO DESIGN DISCHARGE ( Q ) =0.20 cu.m./sec.
ENSURE SMOOTH CONNECTION AND GOOD RIDING QUALITY. VELOCITY ( V ) = 0.89 m./sec.
5.2 EXACT LOCATIONS OF INTERSECTING ROADS WHERE ( NO. 5.1 ) ABOVE APPLIES, CATCHMENTS AREA ( A ) = 20 sq. km
9.3 BAR SHALL BE BENT COLD, NO BAR PARTIALLY EMBEDDED IN CONCRETE SHALL BE
SHALL BE DETERMINED IN THE FIELD BY THE ENGINEER.
FIELD BENT, UNLESS SHOWN ON THE DRAWING OR ESPECIALLY PERMITTED BY THE
ENGINEER. HOOKS SHALL BE FABRICATED AS SHOWN BELOW UNLESS OTHERWISE 11.2 K0147 + 270.00 - K0147 + 540.00 ( RIGHT SIDE )
6.0 REMOVAL OF EXISTING STRUCTURE AND OBSTRUCTION
INDICATED ON THE DRAWING BAR SHALL BE BENT AROUND A PIN WITH A MINIMUM DESIGN DISCHARGE ( Q ) =0.20 CU.M./SEC.
6.1 PORTIONS OF EXISTING UTILITIES, SUCH AS WATER MAIN LINES, ELECTRICAL POWER
DIAMETER D. VELOCITY ( V ) = 0.89 M./SEC.
LINES & POLES, IRRIGATION CHANNELS, TELEPHONE POST AND TRUNK LINES. ETC.
CATCHMENTS AREA ( A ) = 20 SQ. KM
THAT MAY CAUSE OBSTRUCTION TO THE CONSTRUCTION OF THIS PROJECT SHALL BE SIZES OF 90 - DEGREE AND 180 - DEGREE HOOKS USE:
RELOCATED BY THE ENTITY OR OWNER CONCERNED. EXTREME PRECAUTION SHALL
BE EXERCISED AND DAMAGE THEREOF SHALL BE ON THE ACCOUNT OF
CONTRACTOR.
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED AS TO DESIGN CONCEPT: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - JAY - R M. ACOB
REGION IV-A NETWORK DEVELOPMENT- ROAD WIDENING- SECONDARY GENERAL CONSTRUCTION NOTES ENGINEER II
G 6
FAUSTINO MARK ANTHONY S.
ROADS, QUEZON ECO-TOURISM RD, K0147+270 - K0147+650 PREPARED:
QUEZON II DISTRICT ENGINEERING OFFICE CHARLOTTE KAYE A. CONSTANTINO DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL
6 7 29
LUCENA CITY ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER OIC - DISTRICT ENGINEER
MARLO P. DE CHAVEZ
LOCATION: SARIAYA, QUEZON DATE: DATE: DATE: DATE:
ENGINEER II
SUMMARY OF QUANTITIES
NOTE:
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED AS TO DESIGN CONCEPT: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - JAY - R M. ACOB
SUMMARY OF QUANTITIES ENGINEER II
REGION IV-A NETWORK DEVELOPMENT- ROAD WIDENING- SECONDARY FAUSTINO MARK ANTHONY S. G 7
ROADS, QUEZON ECO-TOURISM RD, K0147+270 - K0147+650 PREPARED:
QUEZON II DISTRICT ENGINEERING OFFICE CHARLOTTE KAYE A. CONSTANTINO DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL
7 7 29
LUCENA CITY ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER OIC - DISTRICT ENGINEER
MARLO P. DE CHAVEZ
LOCATION: SARIAYA, QUEZON DATE: DATE: DATE: DATE:
ENGINEER II
S T R A I G H T L I N E D I A G R A M
HORIZONTAL SCALE 1 : 1000m.
K0147+270.00
+ 280.00
K0147+ 300.00
+ 320.00
+ 340.00
+ 360.00
+ 380.00
K0147+ 400.00
+ 420.00
+ 440.00
+ 460.00
+ 480.00
K0147+ 500.00
+ 520.00
+ 540.00
+ 560.00
+ 580.00
K0147+ 600.00
K0147+ 650.00
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED AS TO DESIGN CONCEPT: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - JAY - R M. ACOB
REGION IV-A NETWORK DEVELOPMENT- ROAD WIDENING- SECONDARY STRAIGHT LINE ROAD DIAGRAM ENGINEER II
R 8
FAUSTINO MARK ANTHONY S.
ROADS, QUEZON ECO-TOURISM RD, K0147+270 - K0147+650 TYPICAL CROSS AND ENLARGE SECTION PREPARED:
QUEZON II DISTRICT ENGINEERING OFFICE CHARLOTTE KAYE A. CONSTANTINO DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL
1 17 29
LUCENA CITY ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER OIC - DISTRICT ENGINEER
MARLO P. DE CHAVEZ
LOCATION: SARIAYA, QUEZON DATE: DATE: DATE: DATE:
ENGINEER II
HORIZONTAL CURVE (CIRCULAR) VERTICAL PARABOLIC CURVE
SCALE : NTS SCALE : NTS
x VPI
I
MO - g%
PI
+ g% Yx VPT
VPC
T T
E
L/2
L/2
Lc
L
25 m.
PC PT SYMMETRICAL
SCALE : NTS
VPI
D R
R x
MO - g%
I + g% Yx
VPT
VPC
L/2 L/2
HORIZONTAL CURVE (CIRCULAR) VERTICAL PARABOLIC CURVE
LEGEND: LEGEND:
L
PI = POINT OF INTERSECTION VPI = VERTICAL POINT OF INTERSECTION
I
T
=
=
INTERSECTION ANGLE (CENTRAL ANGLE)
TOTAL TANGENT DISTANCE
VPC
VPT
=
=
VERTICAL POINT OF CURVATURE
VERTICAL POINT OF TANGENCY
UNSYMMETRICAL
R = HORIZONTAL RADIUS G = GRADE IN PERCENT SCALE : NTS
Lc = LENGTH OF CIRCULAR CURVE MO = MIDDLE ORDINATE
E = TOTAL EXTERNAL DISTANCE X = DISTANCE FROM VPC OR VPT TO ANY POINT OF CURVE
D = DEGREE OF CURVE (ARC DEFINITION) Yx = VERTICAL OFFSET IN METERS
PC = POINT OF CURVATURE A = ALGEBRAIC DIFFERENCE OF GRADES
PT = POINT OF TANGENCY
NOTE: NO HORIZONTAL CURVE IS REQUIRED WHEN THEALGEBRAIC DIFFERENCE
NOTE: NO HORIZONTAL CURVE IS REQUIRED WHEN THE IN GRADES IS LESS THAN 0.50%
INTERSECTION (CENTRAL) ANGLE I IS LESS THAN ONE
DEGREE ( 1 - 00 ) IN ANY VERTICAL PARABOLIC CURVE
SYMMETRICAL UNSYMMETRICAL
AL AL1L2
MO = MO =
8.00 200L
x2 (MO) x2 (MO)
Yx = Yx =
( L / 2 )2 ( L1)2or ( L2) 2
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED AS TO DESIGN CONCEPT: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - JAY - R M. ACOB
REGION IV-A NETWORK DEVELOPMENT- ROAD WIDENING- SECONDARY HORIZONTAL AND VERTICAL CURVE ENGINEER II
R 9
FAUSTINO MARK ANTHONY S.
ROADS, QUEZON ECO-TOURISM RD, K0147+270 - K0147+650 PREPARED:
QUEZON II DISTRICT ENGINEERING OFFICE CHARLOTTE KAYE A. CONSTANTINO DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL
2 17 29
LUCENA CITY ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER OIC - DISTRICT ENGINEER
MARLO P. DE CHAVEZ
LOCATION: SARIAYA, QUEZON DATE: DATE: DATE: DATE:
ENGINEER II
PAVEMENT DESIGN PARAMETERS NOTE:
FORMED GROVED WITH KEYWAYS
TRANSVERSE CONSTRUCTION (CONTACT) JOINT FILL WITH HOT POURED JOINT FILLER
PARAMETER DESIGN REQUIREMENT SHALL BE PROVIDED AT THE END OF ANY RUN WHERE Te = THICKNESS OF EXISTING PAVEMENT
T = THICKNESS OF NEW PAVEMENT
LAYING OF CONCRETE HAS BEENSTOPPED FOR THIRTY
1.) TRAFFIC ( FOR 20 YEARS DESIGN LIFE ) (30) MINUTES OR LONGER.
36.08
DESIGN ESAL TRANSVERSE CONSTRUCTION JOINT WHICH OCCUR
Te
AT LOCATION OF WEAKENED PLANE JOINT SHOULD BE 1/2 Te
T
2.) DESIGN CBR BUT JOINTS WITH DOWELS. IF JOINTS OCCURS IN THE
SUBGRADE CBR 26.51 % MIDDLE THIRD OF THE WEAKENED JOINT INTERVAL
SUBBASE CBR 30.00% (1500-3000mm) IT SHOULD BE KEYED JOINTS WITH T-1/2Te
TIE BARS.
3.) RELIABILITY
R 85.00% 375 375 16mm. X 0.75m. TIE BAR
@ 0.75m. O.C.
Z R 1.037
S E C T I O N
4.) OVERALL STANDARD DEVIATION CONSTRUCTION JOINT TO BE USED FOR OFF-CARRIAGEWAY
S
D 0.35
NOT TO SCALE
1.20m
(mm) (mm) (mm) (mm)
Spaced @ every 750 mm O.C.
11.) SUBBASE THICKNESS 32 250
15.00 cm
D
3.35m
CB
280 300 28 190
12.) COMPOSITE MODULUS OF SUBGRADE REACTION Longitudinal Joint
32 230
13.) EFFECTIVE MODULUS SUBGRADE REACTION
K 190.00 pci 290 295 28 170
7100 mm
25 140
14.) LOAD TRANSFER COEFFICIENT
J 3.80 32 230
300 274 28 170
15.) SLAB THICKNESS
D 30.00 cm
3.35m
25 140
32 200
STANDARD GRADIENTS OF CUT SLOPES
1.20m
310 265 28 150
SOIL SOFT ROCK COMMON SOIL @ 750 mm O.C. 25 120
CLASSIFICATION HARD ROCK RIPPABLE 32 190
EXPANSION JOINT
EXPANSION JOINT
SLOPE 320 238 28 140
0.25:1 TO 0.5:1 0.5:1 TO 1:1 1 :1 TO 1.5:1
( HOR : VER ) 4.50 m 4.50 m 4.50 m 4.50 m 4.50 m 4.50 m 4.50 m @ 150 mm O.C 25 110
32 180
STANDARD GRADIENTS OF EMBANKMENT SLOPES
EXPANSION JOINTS AT 90.00 m 330 223 28 130
25 110
SOIL CLASSIFICATION COMMON FILL MATERIAL 32 170
340 209 28 130
SLOPE ( HOR : VER ) 1.50 : 1 TO 2 : 1 PAVEMENT LAYOUT PLAN 25 100
NOT TO SCALE
NOTES:
SLOPE SHOULDER
DEFORMED DOWEL BAR
A. AT NORMAL SECTION, SLOPE OF SHOULDER SHALL
BE 3% (MIN.) SLOPPING DOWNWARDS AWAY FROM
THE EDGE OF THE PAVEMENT.
DRILLED HOLES FILLED WITH
EPOXY RESIN /HARDENED GROUT
B. IF THE SUPER ELEVATION (e) IS LESS THAN OR
EQUAL TO 3% SLOPE OF INNER SHOULDER (ei.) METAL DOWEL CAP GAUGE No. 18
TO BE PLACED ON EACH DOWEL BAR
SHALL BE 3 (MIN.) ON ALTERNATE END
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED AS TO DESIGN CONCEPT: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - JAY - R M. ACOB
REGION IV-A NETWORK DEVELOPMENT- ROAD WIDENING- SECONDARY STRAIGHT LINE ROAD DIAGRAM ENGINEER II
R 10
FAUSTINO MARK ANTHONY S.
ROADS, QUEZON ECO-TOURISM RD, K0147+270 - K0147+650 TYPICAL CROSS AND ENLARGE SECTION PREPARED:
QUEZON II DISTRICT ENGINEERING OFFICE CHARLOTTE KAYE A. CONSTANTINO DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL
3 17 29
LUCENA CITY ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER OIC - DISTRICT ENGINEER
MARLO P. DE CHAVEZ
LOCATION: SARIAYA, QUEZON DATE: DATE: DATE: DATE:
ENGINEER II
C
L
"C"
16mm. x 750 @ 750 O.C. 16mm. x 750 @ 750 O.C.
L = 750 mm @ 750 mm O.C. L = 750 mm @ 750 mm O.C. "A"
DEFORMED DOWEL BARS DEFORMED DOWEL BARS
1.50% 8% slope
SECTION SHOWING ROAD WIDENING
150300
CONCRETE SIDEWALK, MANHOLE W/ COVER, CURB & GUTTER, R.C.P.C @ BOTH SIDES
L = 270.00 m
C
L
10000 10000
1900 1200 3350 3550 3550 3350 1200 1900
EXISTING CONCRETE PAVEMENT
"A" "A"
450
C
L
10000 10000
600
1900 1200 3350 3550 3550 3350 1200-2700 "A"
EXISTING CONCRETE PAVEMENT 1.50%
"A" "A"
150 300
16mm. x 750 @ 750 O.C. 16mm. x 750 @ 750 O.C.
DEFORMED DOWEL BARS L = 750 mm @ 750 mm O.C. L = 750 mm @ 750 mm O.C. DEFORMED DOWEL BARS
L = 20.00 m
C
L
10000 10000
1200 - 2700 3350 3550 3550 3350 1200 -2700
EXISTING CONCRETE PAVEMENT
"A" "A"
L = 30.00 m
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED AS TO DESIGN CONCEPT: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - JAY - R M. ACOB
REGION IV-A NETWORK DEVELOPMENT- ROAD WIDENING- SECONDARY TYPICAL CROSS AND ENLARGE SECTION ENGINEER II
R 11
FAUSTINO MARK ANTHONY S.
ROADS, QUEZON ECO-TOURISM RD, K0147+270 - K0147+650 PREPARED:
QUEZON II DISTRICT ENGINEERING OFFICE CHARLOTTE KAYE A. CONSTANTINO DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL
4 17 29
LUCENA CITY ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER OIC - DISTRICT ENGINEER
MARLO P. DE CHAVEZ
LOCATION: SARIAYA, QUEZON DATE: DATE: DATE: DATE:
ENGINEER II
NOTES:
1.00
0.50 0.50
0.30
0.45
0.15
0.45
0.15
CONCRETE GUTTER
CURB INLET
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED AS TO DESIGN CONCEPT: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - JAY - R M. ACOB
REGION IV-A NETWORK DEVELOPMENT- ROAD WIDENING- SECONDARY PRE-CAST CONCRETE CURB AND GUTTER ENGINEER II
R 12
FAUSTINO MARK ANTHONY S.
ROADS, QUEZON ECO-TOURISM RD, K0147+270 - K0147+650 PREPARED:
QUEZON II DISTRICT ENGINEERING OFFICE CHARLOTTE KAYE A. CONSTANTINO DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL
5 17 29
LUCENA CITY ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER OIC - DISTRICT ENGINEER
MARLO P. DE CHAVEZ
LOCATION: SARIAYA, QUEZON DATE: DATE: DATE: DATE:
ENGINEER II
3.2 mm. thk.
1.40 m.
COLOR BLACK (NOTE : REFLECTORIZED)
0.10 m. width EDGE LINE
COLOR RED (ARROW & LETTERING)
3.2 mm. thk. (NOTE : REFLECTORIZED)
0.10 m. width EDGE LINE
3.35 m.
ANY TIME
0.15 m. width
3.2 mm. thk. BROKEN LINE
3.35 m.
COLOR BLACK
(NOTE : REFLECTORIZED)
SYMBOL
(FOR EVERY 50m INTERVAL) TRAFFIC
SIGNS
1.40 m.
RIGHT OF WAY
3.2 mm. thk.
0.10 m. width EDGE LINE
USE CONCRETE
K0147 + 270.00 - K0147 + 650.00 ; L = 380.00 m CLASS "A"
SECTION A
K0147 + 300.00 - LEFT SIDE
K0147 + 400.00 - RIGHT SIDE
K0147 + 500.00 - LEFT SIDE
K0147 + 600.00 - RIGHT SIDE
REFLECTORIZED THERMOPLASTIC PAVEMENT MARKINGS
SCALE: NTS
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED AS TO DESIGN CONCEPT: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - JAY - R M. ACOB
REGION IV-A NETWORK DEVELOPMENT- ROAD WIDENING- SECONDARY REFLECTORIZED THERMOPLASTIC ENGINEER II
R 13
FAUSTINO MARK ANTHONY S.
ROADS, QUEZON ECO-TOURISM RD, K0147+270 - K0147+650 PAVEMENT MARKINGS PREPARED:
QUEZON II DISTRICT ENGINEERING OFFICE CHARLOTTE KAYE A. CONSTANTINO DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL
6 17 29
LUCENA CITY ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER OIC - DISTRICT ENGINEER
MARLO P. DE CHAVEZ
LOCATION: SARIAYA, QUEZON DATE: DATE: DATE: DATE:
ENGINEER II
300.00 50.00
8.00
6.00MM LETTER
8.00 ENGRAVING DEPTH
8.00
75.00 75.00
LETTER WIDTH HEIGHT TYPE OF LETTER
10.00
D 22 30 Series "C" 10.00
P 22 30 Series "C"
W 30 30 Series "C"
H 22 30 Series "C" 15.00 10.00
10.00
10.00
LETTER DETAILS
SCALE: NTS 23.00 23.00
8.00 8.00
6.00
31.50 31.50
ENGRAVING DEPTH
15.50 15.50
TYPICAL SECTION
SCALE: 1 : 4 m.
800.00
1700.00
ROAD RIGHT OF WAY
300.00
1200 ISOMETRIC
SECTION SCALE: NTS
LOCATED AT SIDEWALK
1700
400 SIDEWALK
660
1200
800 CARRIAGEWAY
300
A
1200 SIDEWALK
400 400 400
PLAN A LIMIT OF R.O.W
SOLAR STREET LIGHTING TOP ELEVATION OF SIDEWALK R.O.W MARKER LIMIT OF R.O.W
2 POST FOUNDATION DETAILS CARRIAGEWAY TOP ELEVATION TOP ELEVATION
25.00
R 9 SCALE: 1 : 40 m.
50.00
1 SOLAR STREET LIGHTING POST DETAIL
R 9 SCALE: 1 : 40 m.
150.00
25.00
SE C T I O N A - A
SCALE: NTS
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED AS TO DESIGN CONCEPT: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - JAY - R M. ACOB
REGION IV-A NETWORK DEVELOPMENT- ROAD WIDENING- SECONDARY SOLAR STREET LIGHTING DETAIL ENGINEER II
R 14
FAUSTINO MARK ANTHONY S.
ROADS, QUEZON ECO-TOURISM RD, K0147+270 - K0147+650 ROAD MARKER DETAIL PREPARED:
QUEZON II DISTRICT ENGINEERING OFFICE CHARLOTTE KAYE A. CONSTANTINO DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL
7 17 29
LUCENA CITY ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER OIC - DISTRICT ENGINEER
MARLO P. DE CHAVEZ
LOCATION: SARIAYA, QUEZON DATE: DATE: DATE: DATE:
ENGINEER II
S T R A I G H T L I N E D I A G R A M
HORIZONTAL SCALE 1 : 1000m.
BEG. OF PROJECT
K0147 + 270.00
END OF PROJECT
K0147 + 650.00
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED AS TO DESIGN CONCEPT: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - JAY - R M. ACOB
REGION IV-A NETWORK DEVELOPMENT- ROAD WIDENING- SECONDARY STRAIGHT LINE ROAD DIAGRAM ENGINEER II
R 15
FAUSTINO MARK ANTHONY S.
ROADS, QUEZON ECO-TOURISM RD, K0147+270 - K0147+650 FOR MISC. STRUCTURES PREPARED:
QUEZON II DISTRICT ENGINEERING OFFICE CHARLOTTE KAYE A. CONSTANTINO DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL
8 17 29
LUCENA CITY ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER OIC - DISTRICT ENGINEER
MARLO P. DE CHAVEZ
LOCATION: SARIAYA, QUEZON DATE: DATE: DATE: DATE:
ENGINEER II
D
HORIZONTAL SCALE
R A I N A G E P L A N
1 : 1000m.
VERTICAL SCALE 1 : 1000m.
BEG. OF PROJECT
BEG. OF DRAINAGE END OF DRAINAGE END OF PROJECT
K0147 + 270.00 K0147 + 540.00 K0147 + 650.00
MANHOLE DISTANCE
RCPC LENGTH
RCPC LENGTH
MANHOLE DISTANCE
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED AS TO DESIGN CONCEPT: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - JAY - R M. ACOB
REGION IV-A NETWORK DEVELOPMENT- ROAD WIDENING- SECONDARY DRAINAGE PLAN ENGINEER II
R 16
FAUSTINO MARK ANTHONY S.
ROADS, QUEZON ECO-TOURISM RD, K0147+270 - K0147+650 PREPARED:
QUEZON II DISTRICT ENGINEERING OFFICE CHARLOTTE KAYE A. CONSTANTINO DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL
9 17 29
LUCENA CITY ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER OIC - DISTRICT ENGINEER
MARLO P. DE CHAVEZ
LOCATION: SARIAYA, QUEZON DATE: DATE: DATE: DATE:
ENGINEER II
MANHOLE COVER MANHOLE COVER
910mm. Ø RCPC MANHOLE COVER 910mm. Ø RCPC 910mm. Ø RCPC MANHOLE COVER 910mm. Ø RCPC
0.25m
.
0.075m.
.
5m
0.2
ISOMETRIC SECTION
3
R-6
e
slop
30%
MANHOLE MANHOLE
2
COVER COVER
e
slop
30%
L1
4 INLET DETAIL
SCALE 1:20
PLAN OF MANHOLE
SCALE 1:25
1 MANHOLE DETAIL
SCALE 1:25
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED AS TO DESIGN CONCEPT: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - JAY - R M. ACOB
REGION IV-A NETWORK DEVELOPMENT- ROAD WIDENING- SECONDARY MANHOLE DETAIL - 1 ENGINEER II
R 17
FAUSTINO MARK ANTHONY S.
ROADS, QUEZON ECO-TOURISM RD, K0147+270 - K0147+650 PREPARED:
QUEZON II DISTRICT ENGINEERING OFFICE CHARLOTTE KAYE A. CONSTANTINO DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL
10 17 29
LUCENA CITY ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER OIC - DISTRICT ENGINEER
MARLO P. DE CHAVEZ
LOCATION: SARIAYA, QUEZON DATE: DATE: DATE: DATE:
ENGINEER II
6 DETAIL OF BAR GRATES
SCALE 1:10
T3 T1 T3
T4 T2 T2 T4
B5'
D1 A10
D2 B5
A10'
A10 A8' A8
A9 A2' A2
A7' A7
A2 A2
A11 A11 D1 A11' A11 D1
A8 A8
A6' A6
A7 A7
A6 A6 D2 D2
A5 A5
A4 A4 A5' A5
A3 A3
D3 D3
A2 A2
A4' A4
A1 A1
B7 A3' A3
B7 A2' A2
B5 D2 D2 B6
B3 B2 B2 B4
B4 B1 B3
D3 D3
SCALE 1:25
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED AS TO DESIGN CONCEPT: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - JAY - R M. ACOB
REGION IV-A NETWORK DEVELOPMENT- ROAD WIDENING- SECONDARY MANHOLE DETAIL - 2 ENGINEER II
R 18
FAUSTINO MARK ANTHONY S.
ROADS, QUEZON ECO-TOURISM RD, K0147+270 - K0147+650 PREPARED:
QUEZON II DISTRICT ENGINEERING OFFICE CHARLOTTE KAYE A. CONSTANTINO DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL
11 17 29
LUCENA CITY ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER OIC - DISTRICT ENGINEER
MARLO P. DE CHAVEZ
LOCATION: SARIAYA, QUEZON DATE: DATE: DATE: DATE:
ENGINEER II
B A R B E N D I N G S C H E D U L E
A B C D
S C H E D U L E O F R E I N F O R C E M E N T
N O T E : 1 6 m m . D i a m . B e l o w ( G r a d e 4 0 ) ; H i g h e r t h a n 1 6 m m . D i a m . ( G r a d e 6 0 )
BAR BAR SIZE SPACING BAR DIMENSIONS (mm.) NUMBER OF TOTAL WEIGHT CONCRETE VOLUME
LOCATION LENGTH EACH BAR (m.) UNIT WEIGHT (kg./m.)
MARK (mm.) (mm.) SHAPE BARS (pcs.) (kg.) (cu.m.)
a b c d e f
A1 10 mm. as shown D 65 1930 1480 1680 65 5.220 0.6170 11 35.4281
A2 10 mm. as shown B 880 1590 880 3.350 0.6170 8 16.5356
A3 10 mm. as shown B 355 1590 355 2.300 0.6170 2 2.8382
A4 10 mm. as shown B 235 1590 235 2.060 0.6170 2 2.5420
A5 10 mm. as shown B 175 1590 175 1.940 0.6170 2 2.3940
A6 10 mm. as shown B 165 1590 165 1.920 0.6170 2 2.3693
A7 10 mm. as shown B 189 1590 189 1.968 0.6170 2 2.4285
A8 10 mm. as shown B 260 1590 260 2.110 0.6170 1 1.3019
A9 10 mm. as shown B 290 1590 290 2.170 0.6170 2 2.6778
A10 10 mm. as shown B 1205 1590 1205 4.000 0.6170 2 4.9360
A11 10 mm. as shown B 409 1590 409 2.408 0.6170 4 5.9429
A2' 10 mm. as shown A 1460 1.460 0.6170 2 1.8016
A3' 10 mm. as shown A 355 0.355 0.6170 2 0.4381
A4' 10 mm. as shown A 235 0.235 0.6170 2 0.2900
A5' 10 mm. as shown A 175 0.175 0.6170 2 0.2160
A6' 10 mm. as shown A 165 0.165 0.6170 2 0.2036
A7' 10 mm. as shown A 189 0.189 0.6170 2 0.2332
A8' 10 mm. as shown A 260 0.260 0.6170 2 0.3208
A10' 10 mm. as shown A 1205 1.205 0.6170 2 1.4870
A11' 10 mm. as shown A 409 0.409 0.6170 2 0.5047
B1 10 mm. as shown C 80 170 1610 170 80 2.110 0.6170 1 1.3019 1.9400
B2 10 mm. as shown C 80 187 1610 187 80 2.144 0.6170 2 2.6457
B3 10 mm. as shown C 80 380 1610 380 80 2.530 0.6170 2 3.1220
B4 10 mm. as shown C 80 250 1610 250 80 2.270 0.6170 2 2.8012
B5 10 mm. as shown C 80 1920 1610 1920 80 5.610 0.6170 1 3.4614
B6 10 mm. as shown C 80 1670 1610 1670 80 5.110 0.6170 1 3.1529
B7 10 mm. as shown A 1610 1.610 0.6170 2 1.9867
B1' 10 mm. as shown B 80 170 80 0.330 0.6170 1 0.2036
B2' 10 mm. as shown B 80 187 80 0.347 0.6170 2 0.4282
B3' 10 mm. as shown B 80 380 80 0.540 0.6170 2 0.6664
B4' 10 mm. as shown B 80 250 80 0.410 0.6170 2 0.5059
B5' 10 mm. as shown B 80 1920 80 2.080 0.6170 1 1.2834
B6' 10 mm. as shown B 80 1670 80 1.830 0.6170 1 1.1291
T1 10 mm. as shown B 80 620 80 0.780 0.6170 2 0.9625
T2 10 mm. as shown B 80 637 80 0.797 0.6170 4 1.9670
T3 10 mm. as shown B 80 700 80 0.860 0.6170 4 2.1225
T4 10 mm. as shown B 80 830 80 0.990 0.6170 4 2.4433
D1 10 mm. as shown A 900 0.900 0.6170 4 2.2212
D2 10 mm. as shown A 1000 1.000 0.6170 8 4.9360
D3 10 mm. as shown A 800 0.800 0.6170 4 1.9744
L1 16 mm. as shown C 75 250 250 250 75 0.900 1.5780 4 5.6808
TOTAL VOLUME (cu.m.) = 1.9400
N O T E : C o m p u t e d Q u a n t i t i e s a r e f o r O n e ( 1 ) M a n h o l e O n l y TOTAL WT. GRADE (40) (kg.) = 129.8854
TOTAL WT. GRADE (60) (kg.) = 0
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED AS TO DESIGN CONCEPT: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - JAY - R M. ACOB
REGION IV-A NETWORK DEVELOPMENT- ROAD WIDENING- SECONDARY SCHEDULE OF REINFORCEMENT OF ENGINEER II
R 19
FAUSTINO MARK ANTHONY S.
ROADS, QUEZON ECO-TOURISM RD, K0147+270 - K0147+650 MANHOLE PREPARED:
QUEZON II DISTRICT ENGINEERING OFFICE CHARLOTTE KAYE A. CONSTANTINO DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL
12 17 29
LUCENA CITY ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER OIC - DISTRICT ENGINEER
MARLO P. DE CHAVEZ
LOCATION: SARIAYA, QUEZON DATE: DATE: DATE: DATE:
ENGINEER II
D
WORKING AREA
TO MANILA
TO BICOL
10m.
Place Roadwork 1 km
Ahead & Lane Status
signs for additional pre-
warning of the
Roadworks. Concrete Safety
Barriers
Attach/Install barricade
SHOULDER Hazard Markers to be
flasher light every fter
placed evenly along
3 bollards to improve
the Merge Taper
visibility particularly at
nighttime
5D 5D D D 2D 2D
DIMENSION "D"
A distance expressed in
meters equal to the
approach speed of traffic in
kilometers per hour
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED AS TO DESIGN CONCEPT: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - JAY - R M. ACOB
ENGINEER II
REGION IV-A NETWORK DEVELOPMENT- ROAD WIDENING- SECONDARY TRAFFIC MANAGEMENT PLAN FAUSTINO MARK ANTHONY S. R 20
ROADS, QUEZON ECO-TOURISM RD, K0147+270 - K0147+650 PREPARED:
QUEZON II DISTRICT ENGINEERING OFFICE CHARLOTTE KAYE A. CONSTANTINO DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL
13 17 29
LUCENA CITY ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER OIC - DISTRICT ENGINEER
MARLO P. DE CHAVEZ
LOCATION: SARIAYA, QUEZON DATE: DATE: DATE: DATE:
ENGINEER II
NOTES :
1. ADVANCE SIGNS (T1) AND POSITION SIGNS (T2) SHALL HAVE BLACK
LETTERS ON YELLOW REFLECTORIZED BACKGROUND. 1200 1800
2. TRAFFIC DIVERSION SIGNS (T4 - 1) SHALL HAVE BLACK LETTERS AND
86 1032 82 1800 175 1474 151
ARROW ON YELLOW RECFLECTORIZED BACKGROUND.
3. TRAFFIC DIVERSION SIGNS (T4 - 2) & (T4 - 3) SHALL HAVE WHITE
70
END
90
CHEVRONS ON BLACK BACKGROUND. WHITE REFLECTIVE MATERIAL
WORK M E N RO A D W O R K
200
160
DM
64mm. WIDE TO BE CENTRALLY PLACED ON WHITE BANDS.
600
600
ROADWORK
100
600
100
AH E AD AH E AD
160
DM
160
70
1800
90
525 750 525
175 1474 151
225 84 25
T2 - 16
ROAD WORK SIGN DETAILS
SCALE: NTS.
900
600 600
40
800
800
NOTES :
SEE NOTE 4
TYPE I BARRICADE
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED AS TO DESIGN CONCEPT: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - JAY - R M. ACOB
ENGINEER II
REGION IV-A NETWORK DEVELOPMENT- ROAD WIDENING- SECONDARY ROAD SAFETY FAUSTINO MARK ANTHONY S. R 21
ROADS, QUEZON ECO-TOURISM RD, K0147+270 - K0147+650 PREPARED:
QUEZON II DISTRICT ENGINEERING OFFICE CHARLOTTE KAYE A. CONSTANTINO DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL
14 17 29
LUCENA CITY ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER OIC - DISTRICT ENGINEER
MARLO P. DE CHAVEZ
LOCATION: SARIAYA, QUEZON DATE: DATE: DATE: DATE:
ENGINEER II
PERSPECTIVE
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED AS TO DESIGN CONCEPT: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - JAY - R M. ACOB
ENGINEER II
REGION IV-A NETWORK DEVELOPMENT- ROAD WIDENING- SECONDARY SANITATION TENT PLAN FAUSTINO MARK ANTHONY S. R 22
ROADS, QUEZON ECO-TOURISM RD, K0147+270 - K0147+650 PREPARED:
QUEZON II DISTRICT ENGINEERING OFFICE CHARLOTTE KAYE A. CONSTANTINO DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL
15 17 29
LUCENA CITY ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER OIC - DISTRICT ENGINEER
MARLO P. DE CHAVEZ
LOCATION: SARIAYA, QUEZON DATE: DATE: DATE: DATE:
ENGINEER II
W
1
W
2
D W
1 1
1 FLOOR PLAN 2 ROOF PLAN 9 SCHEDULE OF DOOR & WINDOWS 10 FOUNDATION PLAN 11 ROOF FRAMING PLAN
- SCALE 1:150MTS - SCALE 1:150MTS - SCALE 1:100MTS - SCALE 1:150MTS - SCALE 1:150MTS
P E R S P E C T I V E PLAN
GENERAL NOTES:
1. ALL PLUMBING WORKS INCLUDED HEREIN SHALL BE EXECUTED ACCORDING TO THE
PROVISIONS OF THE PHILIPPINE PLUMBING CODE, THE NATIONAL BUILDING
CODE, AND THE RULES AND REGULATIONS OF THE LOCAL GOVERNMENT. W W
1 2
2. COORDINATE THE DRAWING WITH OTHER RELATED DRAWINGS AND SPECIFICATIONS.
THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY DISCREPANCY FOUND
D
HEREIN. 1
W
1 20W 20W
LPP
1-40 WATTS,
5 REAR ELEVATION 6 LEFT SIDE ELEVATION c
PROJECT NAME & LOCATION : SHEET CONTENTS : DRAFTED : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED :
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS OO1: ENSURE SAFE AND RELIABLE NATIONAL DETAILED PLAN OF FIELD OFFICE
JAY R M. ACOB
ENGINEER II R 23
REGION IV-A ROAD SYSTEM - NETWORK DEVELOPMENT- ROAD
PREPARED : CHARLOTTE KAYE A. CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL
WIDENING- SECONDARY ROADS, QUEZON
QUEZON II DISTRICT ENGINEERING OFFICE
ECO-TOURISM RD, K0147+270 - K0147+650 ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER OIC - DISTRICT ENGINEER 16 17 29
LUCENA CITY DATE : DATE : DATE : DATE :
MARLO P. DE CHAVEZ
ENGINEER II
DISPLAY AREA
STAKE STAKE
TRAFFIC DIRECTION
ROAD
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED AS TO DESIGN CONCEPT: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - JAY - R M. ACOB
ENGINEER II
REGION IV-A NETWORK DEVELOPMENT- ROAD WIDENING- SECONDARY DETAILED PLAN OF PROJECT BILLBOARD FAUSTINO MARK ANTHONY S. R 24
ROADS, QUEZON ECO-TOURISM RD, K0147+270 - K0147+650 PREPARED:
QUEZON II DISTRICT ENGINEERING OFFICE CHARLOTTE KAYE A. CONSTANTINO DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL
17 17 29
LUCENA CITY ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER OIC - DISTRICT ENGINEER
MARLO P. DE CHAVEZ
LOCATION: SARIAYA, QUEZON DATE: DATE: DATE: DATE:
ENGINEER II
GENERAL NOTES HORIZONTAL CONTROL
THE AZIMUTH USED IN THIS PROJECT WAS RECKONED THRU THE
1. DISTANCE AND ELEVATIONS ARE IN METERS UNLESS
OTHERWISE INDICATED. MAGNETIC NORTH. SUCEEDING AZIMUTHS WERE CALCULATED BY
2. ALIGNMENT AND GRADES IN THIS PROJECT WAG BASED SCALE: 1 : 700 M.
ON THE GRADE AND ALIGNMENT OF THE EXISTING ROAD. ADDING AND/OR SUBTRACTING DEFLECTION ANGLES DICTATED
3. ALL ELEVATIONS ARE ASSUMED ELEVATION BY THE CENTER LINE OF THE EXISTING ROAD.
4. GRADE SHOWN IS THE TOP OF FINISHED PAVEMENT.
EXCEPT OTHERWISE SPECIFIED.
VERTICAL CONTROL
5. LOCATIONS AND INVERT ELEVATION OF ALL DRAINAGE
STRUCTURES MAY BE ADJUSTED TO SUIT FIELD CONDITIONS. THE ELEVATION USED IN THIS PROJECT WAS TRUE ELEVATION. IT WAS
ALL PIPES SHALL HAVE A MINIMUM COVER OF 0.60 M.
6. ALL CONCRETE TO BE USED IN THIS PROJECT SHALL BE
RECKONED FROM BM NO. 1, ELEVATION 6.055, LOCATED AT K0147 +270.00
CLASS "A" UNLESS OTHERWISE INDICATED.
7. ALL WORK SHALL COMPLY WITH THE DPWH STANDARD
SPECIFICATION FOR HIGHWAYS AND BRIDGES, REVISED 2013
END OF PROJECT
K0147 + 650.00
PROFILE
SCALE: HOR. 1 : 700 M.
VERT. 1 : 70 M.
10.00
E L E V A T I O N
5.00
0.00
STATION 147 + 270.00 147 + 300.00 147 + 400.00 147 + 500.00 147 + 600.00 147 + 650.00
FINISHED GRADE
FOLLOW EXISTING FINISHED GRADE
ELEVATION
6.055
6.052
5.998
5.972
5.905
5.884
5.874
5.837
5.774
5.783
5.955
5.993
6.003
5.991
6.019
5.913
5.881
5.817
5.891
5.871
6.011
ORIGINAL GROUND
ELEVATION
SUPERELEVATION
WIDENING
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED AS TO DESIGN CONCEPT: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - JAY - R M. ACOB
ENGINEER II
REGION IV-A NETWORK DEVELOPMENT- ROAD WIDENING- SECONDARY PLAN AND PROFILE FAUSTINO MARK ANTHONY S. PP 25
ROADS, QUEZON ECO-TOURISM RD, K0147+270 - K0147+650 PREPARED:
QUEZON II DISTRICT ENGINEERING OFFICE K0147+270.00 - K0147+650.00 CHARLOTTE KAYE A. CONSTANTINO DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL
1 1 29
LUCENA CITY ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER OIC - DISTRICT ENGINEER
MARLO P. DE CHAVEZ
LOCATION: SARIAYA, QUEZON DATE: DATE: DATE: DATE:
ENGINEER II
MH
MH
MH 0
147+54
MH
0
147+52
MH 00
147+5
MH 80
147+4
460
MH 147+
440
MH 147+
420
147+
MH
400
M H 147+
MH
380
147+
MH
360
147+ HYDRAULIC ANALYSIS: HYDRAULIC ANALYSIS:
MH
+ 340 DESIGN DISCHARGE ( Q ) = 0.20 cu.m./sec. DESIGN DISCHARGE ( Q ) = 0.20 cu.m./sec.
147 VELOCITY ( V ) = 0.89 m./sec VELOCITY ( V ) = 0.89 m./sec
MH CATCHMENTS AREA ( A ) = 20 sq. km CATCHMENTS AREA ( A ) = 20 sq. km
32 0 USE : 910mm. RCPC W/ 0.58 cu.m./sec. MAXIMUM DISCHARGE USE : 910mm. RCPC W/ 0.58 cu.m./sec. MAXIMUM DISCHARGE
147+
MH 0
+30
147
0
+28
147
PROFILE
SCALE: HOR. 1 : 700 M.
VERT. 1 : 70 M.
10.00
E L E V A T I O N
g =(-)0.285 g =(-)0.285
5.00 % g =(-)0.285
%
g =(-)0.285
% % g =(-)0.285
% g =(-)0.285
% g =(-)0.285
%
g =(-)0.285
%
g =(-)0.285
%
g =(-)0.285
% g =(-)0.285
%
g =(-)0.285
% g =(-)0.285
%
0.00
3.486
3.483
3.343
3.273
3.203
3.063
2.993
2.923
2.853
2.783
2.643
2.573
3.413
3.133
2.713
INVERT ELEVATION (LEFT SIDE)
PROFILE
SCALE: HOR. 1 : 700 M.
VERT. 1 : 70 M.
10.00
E L E V A T I O N
g =(-)0.285 g =(-)0.285
500 % g =(-)0.285
%
g =(-)0.285
% % g =(-)0.285
% g =(-)0.285
% g =(-)0.285
%
g =(-)0.285
%
g =(-)0.285
%
g =(-)0.285
% g =(-)0.285
%
g =(-)0.285
% g =(-)0.285
%
0.00
3.486
3.483
3.343
3.273
3.203
3.063
2.993
2.923
2.853
2.783
2.643
2.573
3.413
3.133
2.713
6.052
5.998
5.972
5.905
5.884
5.874
5.837
5.774
5.783
5.991
6.019
5.913
5.881
6.011
STATION 147 + 270.00 147 + 300.00 147 + 400.00 147 + 500.00 147 + 540.00
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED AS TO DESIGN CONCEPT: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - JAY - R M. ACOB
ENGINEER II
REGION IV-A NETWORK DEVELOPMENT- ROAD WIDENING- SECONDARY PLAN AND PROFILE FAUSTINO MARK ANTHONY S. PP 26
ROADS, QUEZON ECO-TOURISM RD, K0147+270 - K0147+650 PREPARED:
QUEZON II DISTRICT ENGINEERING OFFICE K0147+270.00 - K0147+540.00 CHARLOTTE KAYE A. CONSTANTINO DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL
1 1 29
LUCENA CITY ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER OIC - DISTRICT ENGINEER
MARLO P. DE CHAVEZ
LOCATION: SARIAYA, QUEZON DATE: DATE: DATE: DATE:
ENGINEER II
5.998
6.100 5.995 5.987 5.869
5.663 5.859 5.905
0.000 5.530 5.498
-8.873 -3.516 3.550 3.634
9.949 -3.579 0.000
-9.705 9.372
5.963
5.912 5.991 5.972
5.557 5.934 5.927
5.510 5.481 0.000 5.647
3.694 -3.504 3.559
-3.682 0.000 9.446 -9.589 7.914
-9.120
BEGINNING OF PROJECT
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED AS TO DESIGN CONCEPT: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - JAY - R M. ACOB
ENGINEER II
REGION IV-A NETWORK DEVELOPMENT- ROAD WIDENING- SECONDARY CS 27
CROSS SECTION PREPARED:
FAUSTINO MARK ANTHONY S.
QUEZON II DISTRICT ENGINEERING OFFICE ROADS, QUEZON ECO-TOURISM RD, K0147+270 - K0147+650
K0147+270.00 -K0147+400.00 CHARLOTTE KAYE A. CONSTANTINO DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL
1 3 29
LUCENA CITY ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER OIC - DISTRICT ENGINEER
MARLO P. DE CHAVEZ
LOCATION: SARIAYA, QUEZON DATE: DATE: DATE: DATE:
ENGINEER II
5.762
5.837 5.825 5.207 5.817
5.823 5.784 5.657
0.000 3.561 5.673 5.695
-3.467 -3.550
5.437 7.236 5.237 -8.986 0.000
9.551 -7.203 3.550 10.080
-9.265
5.881 5.729
5.720 0.000 3.492 5.484
5.521 5.076
4.994 -3.568 8.070
-6.838 9.935
5.913 5.853 -10.319
5.873
5.479 0.000 3.607 5.497
-3.410
-9.386 9.023
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED AS TO DESIGN CONCEPT: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - JAY - R M. ACOB
ENGINEER II
REGION IV-A NETWORK DEVELOPMENT- ROAD WIDENING- SECONDARY CS 28
CROSS SECTION PREPARED:
FAUSTINO MARK ANTHONY S.
QUEZON II DISTRICT ENGINEERING OFFICE ROADS, QUEZON ECO-TOURISM RD, K0147+270 - K0147+650
K0147+420.00 -K0147+560.00 CHARLOTTE KAYE A. CONSTANTINO DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL
2 3 29
LUCENA CITY ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER OIC - DISTRICT ENGINEER
MARLO P. DE CHAVEZ
LOCATION: SARIAYA, QUEZON DATE: DATE: DATE: DATE:
ENGINEER II
5.780
5.961 5.660
-9.009
5.955 5.993 3.550 8.928
5.153
-3.550 0.000 5.022
-9.513
9.352
ELEV. 5.00
5.783
5.921 5.962 5.802
5.955
-10.104
5.166 -3.550 3.550 8.842
0.000
5.424
-10.359
9.239
ELEV. 5.00
4.603 5.860
5.702 5.882 5.811 5.819
5.871 3.550
-10.520 -8.824 -3.550 7.271 10.454
0.000
3.573
10.772
1.50%
ELEV. 5.00
1.50% 1.50%
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED AS TO DESIGN CONCEPT: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - JAY - R M. ACOB
ENGINEER II
REGION IV-A NETWORK DEVELOPMENT- ROAD WIDENING- SECONDARY CS 29
CROSS SECTION PREPARED:
FAUSTINO MARK ANTHONY S.
QUEZON II DISTRICT ENGINEERING OFFICE ROADS, QUEZON ECO-TOURISM RD, K0147+270 - K0147+650
K0147+560.00 - K0147+650.00 CHARLOTTE KAYE A. CONSTANTINO DE LA CRUZ WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL
3 3 29
LUCENA CITY ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER OIC - DISTRICT ENGINEER
MARLO P. DE CHAVEZ
LOCATION: SARIAYA, QUEZON DATE: DATE: DATE: DATE:
ENGINEER II