Method Statement-4
Method Statement-4
30/12/2020.
Objective: -
To Demolish the Existing Ground+4 floor building and manual
separation and demolition of Substation Room Including Foundations
and remove the debris and dispose the debris to the approved Dubai
Municipality Dumping Yard.
Scope of work: -
Demolition of Existing Ground+4 floor building and manual
separation and demolition of Substation Room including removal of
its foundations, Area Al Ras, Dubai, UAE.
1
Resources: -
Excavator with Bucket and Excavator with Breaker, Front End
loader shovel for Mechanical work and hand tools for manual work
by workers. Steel cutting gas equipment shall also be used for
cutting the steel.
Machines: -
Excavator equipped with Bucket & Jack Hammer. Brand
Caterpillar makes 330 or any equivalent machine.
Front End loader shovel caterpillar make model - 966 or 950.
36M 3 , 20M 3 Trucks for loading the debris.
All heavy machinery working on site will be daily checked,
maintained and refueled. Special attention shall be taken to air
filters while working in a dusty surrounding while demolition.
Precautions:
All the workers on site shall be in proper PPE. Prior to the work
we shall make sure that the Etisalat, Electrical and water
services are terminated.
We shall be protecting all around the building with scaffolding, Ply and
Green cloth.
Each group with one excavator mounted with bucket + one excavator
mounted with breaker + one-wheel loader shovel shall be preceded.
The building blocks shall be demolished first with roof slab; then beams
and finally the columns shall be knocked down by using excavator.