Construction MODEL University Resilient Smart URS Building FINANCIAL 2

The document provides a detailed cost estimate for constructing a resilient and smart university building. It lists 26 items of work required for the project, including site works, earthworks, concrete works, rebar works, formworks, masonry works, plastering, roofing, carpentry, doors, finishes, windows, drainage, painting, electrical works, plumbing works, electronic works, construction safety programs, and a billboard. It calculates total costs for materials, labor, profit, overhead, and taxes to determine the total projected cost for the construction project.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
57 views1 page

Construction MODEL University Resilient Smart URS Building FINANCIAL 2

The document provides a detailed cost estimate for constructing a resilient and smart university building. It lists 26 items of work required for the project, including site works, earthworks, concrete works, rebar works, formworks, masonry works, plastering, roofing, carpentry, doors, finishes, windows, drainage, painting, electrical works, plumbing works, electronic works, construction safety programs, and a billboard. It calculates total costs for materials, labor, profit, overhead, and taxes to determine the total projected cost for the construction project.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

DETAILED COST ESTIMATE FOR CONSTRUCTION MODEL UNIVERSITY RESILIENT AND SMART (URS) BUILDING

COST COST
ITEM WORK DESCRIPTION Qty Unit TOTAL
Materials labor Materials labor
I. MOBILIZATION/DEMOBILIZATION 1.00 lot
II. SITE WORKS 1.00 lot
III. EARTHWORKS 1.00 lot
IV. CONCRETE WORKS 1.00 lot
V. REBAR WORKS 1.00 lot
VI. FORMWORKS 1.00 lot
VII. MASONRY WORKS 1.00 lot
VIII. PLASTERING 1.00 lot
IX. TOPPING WORKS 1.00 lot
X TILE WORKS 1.00 lot
XI. ROOFING FRAMING 1.00 lot
XII HANDRAIL(RAMP) 1.00 lot
XIII. TINSMITHRY 1.00 lot
XIV. CARPENTRY 1.00 lot
XV. DOORS 1.00 lot
XVI. JAMB 1.00 lot
XVII FINISHES 1.00 lot
XVIII WINDOWS 1.00 lot
XIX CATCH BASIN 1.00 lot
XX DRAINAGE LINE 1.00 lot
XXI. PAINTING 1.00 lot
XXII ELECTRICAL WORKS 1.00 lot
XXIII. PLUMBING WORKS 1.00 lot
XXIV. ELECTRONIC WORKS 1.00 lot
XXV. CONSTRUCTION SAFETY & HEALTH PROGRAM 1.00 lot
XXVI Billboard 1.00 lot

TOTAL DIRECT COST -


PROFIT -
OCM -
VAT -
TOTAL PROJECT COST -

Prepared by:

ENGR. SHERMANN M. RAMOS


Authorized Managing Officer
MYMPOY BUILDERS