WMS - Floor Screeding Works
WMS - Floor Screeding Works
CONSTRUCTION AND
COMPLETION OF PANTAI
SERVICES DN.BHD. FLOOR SCREEDING WORK HIBURAN TOURISM
DEVELOPMENT, ROMPIN,
PAHANG DARUL MAKMUR FOR
Page No. : 1 of 5 THE EAST COAST ECONOMIC
REGION DEVELOPMENT
Revision No. : 00
COUNCIL (ECERDC)
Issued : 10/03/2023
R
e Reviewed Approved
Description Prepared by Date
v by by
.
1
.
0
2
.
0
Important
The information contained herein is the proprietary property of FNA BUILDERS AND
SERVICES SDN.BHD. It shall not be reproduced, copied, revealed, published, or distributed in
whole or partly without authorization.
TABLE OF CONTENT
1.0 INSTRUCTION
This method statement outlines are to Floor Screeding Work for project The Proposed Construction
and Completion of Pantai Hiburan Tourism Development, Rompin, Pahang Darul Makmur for The
East Coast Economic Region Development Council (ECERDC).
2.0 SCOPE OF WORKS
This work method statement describes all the Floor Screeding Works
Surface Preparation
4.3.1.2 Concrete mixer machine shall be used to mix the mortar screed.
6.0 MATERIALS
6.1 Cement Mixer Machine.
6.2 Hand Tools : Timber Floating, Flat Edge Trowel, Angle Float.
6.3 Aluminium Ruler with water level / Sprit Level.
6.4 Hammer and Nails.
6.5 String and Sprit Level & Plum bob.
6.6 Spade/ Scope
7.0 MACHINERY
7.1 -N/A
8.0 MANPOWER
8.1 Supervisor
8.2 Site Safety Supervisor
8.3 General Worker
8.4 Skilled Worker