ITP-Line Hardware - Sample Test PDF

This document is an inspection and test plan (ITP) for line hardware to be used on transmission lines. It outlines 5 key tests to be performed on samples of line hardware, including visual and dimensional checks, galvanizing tests, mechanical load tests, damage load tests on clamps, and slip load tests. The ITP specifies test standards, sample sizes, acceptance criteria, test responsibilities of the manufacturer and inspectors, and approval requirements. Its purpose is to ensure the line hardware meets specifications for use on transmission line projects in Saudi Arabia.

Uploaded by

Prabhakar Sv
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
267 views3 pages

ITP-Line Hardware - Sample Test PDF

This document is an inspection and test plan (ITP) for line hardware to be used on transmission lines. It outlines 5 key tests to be performed on samples of line hardware, including visual and dimensional checks, galvanizing tests, mechanical load tests, damage load tests on clamps, and slip load tests. The ITP specifies test standards, sample sizes, acceptance criteria, test responsibilities of the manufacturer and inspectors, and approval requirements. Its purpose is to ensure the line hardware meets specifications for use on transmission line projects in Saudi Arabia.

Uploaded by

Prabhakar Sv
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

License=Al Sharif Group & KEC Co.

Ltd/SA-881-t Not For Resale ,1/23/2023 8:18:39 PM Saudi Time


INSPECTION AND TEST PLAN (ITP) FOR LINE HARDWARE

Type Sample

Manufacturer Name: Contract No. / Project Title:


Plant Location: ITP No. : ITP-LHW-01
Material / Equipment Description: Line Hardware Review Cycle No :
Type of Material / Equipment Date:
No. of days:

Equipment Technical data (To be filled by the manufacturer):


Rated Voltage (Ur [kVrms]) 110/115/132/230/380kV
Highest Voltage (Um [kV])
Rated Current (A)
Rated Frequency (Hz) 60
SEC/National Grid SA Specification No. 12-TMSS-01, Rev.02

Applicable Insp Test Mfr’s


Item Test Description Unit Test Procedures Sample Acceptance Criteria Remarks
Standards Type Location Compliance

Visual and Dimensional 12-TMSS-01 Clause 7 of IEC 61284 As per approved


1 - W
Test Clause 7.2.1.a drawing
Galvanizing Test
- Hardware Fittings 110
12-TMSS-01
2 - Fasteners µm Clause 9 of IEC 61284 W 53(fastener˃9.52mm)
Clause 7.2.1.b
43(fasteners≤9.52mm)
- Washers 53 (washers)
No failure shall occur at
Mechanical Failing Load 12-TMSS-01
3 kN Clause 11 of IEC 61284 Clause 7.2.4 of W or before the specified
Test Clause 7.2.1.c
12-TMSS-01 failing load
Vertical damage load and
12-TMSS-01 Clause 11 of IEC 61284 No permanent
4 failure load test on kN W
Clause 7.2.1.d Clause 5 of 12-TMSS-01 deformation
AGS/Suspension Clamps
No slippage at 70% of
12-TMSS-01 conductor every day
5 Slip Load Test kN Clause 7.2.1.e Clause 11 of IEC 61284 W tension and 100% of
ground wire every day
tension
ITP-LHW-01 Standards & Specifications Department PAGE 1 OF 2

License=Al Sharif Group & KEC Co. Ltd/SA-881-t Not For Resale ,1/23/2023 8:18:39 PM Saudi Time
INSPECTION AND TEST PLAN (ITP) FOR LINE HARDWARE

Legend:

W = Witness [by SEC/National Grid SA Engineers. and/or SEC/National Grid SA approved 3rd Party Independent Inspection Agency (IIA) Inspector]
RC = Review of Certificates [by SEC/National Grid SA Engineers. and/or approved 3rd Party Independent Inspection Agency (IIA) Inspector]

General instructions:

1- Manufacturer’s compliance shall be indicated in front of each test.


2- Approved Data Schedule & final drawings for the equipment / Material shall be attached.
3- Test Procedure & Day-to-day activity schedule shall be attached for approval.
4- The ITP must be duly signed and stamped by manufacturer's authorized personnel.
5- This document is valid for testing after S&SD approval.

Prepared by (Mfr's authorized QC test inspector) Approved by: (Mfr's authorized QA/QC personnel)

Date:

Date:
Manufacturer Stamp

S&SD Approval

ITP-LHW-01 Standards & Specifications Department PAGE 2 OF 2