RELAY PROTECTION Date: 22-April- 2022
SETTINGS – DIESEL POWER Doc No: G423XXXXX
SUBSEA7, Espirito Santo, Brazil Page: 3 of 18 Rev: A
1MW, 60Hz, 0.416 KV Power Project Status: For Construction
2. GENSETS
2a. GEMPAC PARAMETERS FOR G3+ GENSETS
G3+
Equipment Type
Outputs
Channel Name Setpoint Timer Enabled
A B
1010 Bus High Volt 1 105% 10 0 0 ON
1020 Bus High Volt 2 107% 5 5 0 ON
1030 Bus Low Volt 1 95% 10 0 0 ON
1040 Bus Low Volt 2 93% 5 5 0 ON
1050 Bus High Freq 1 103% 10 0 0 ON
1060 Bus High Freq 2 105% 1 5 0 ON
1070 Bus Low Freq1 98% 10 0 0 ON
1080 Bus Low Freq2 96% 5 5 0 ON
1090 Reverse Power -5% 5 5 0 ON
1096 Rev. P. Inverse NA NA NA NA NA
1100 Over Current 1 105% 20 0 0 ON
1110 Over Current 2 110% 10 5 0 ON
1160 Over Load 1 100% 3200 0 0 ON
1170 Over Load 2 110% 300 5 0 ON
1220 Unbalance Current 30% 10 5 0 OFF
1230 Unbalance Volt 5% 10 5 0 OFF
1240 VAR Import 10% 10 5 0 ON
1250 VAR Export 60% 10 5 0 ON
1260 df/dt (Rocof) 4Hz/Sec NA 5 0
1261 df/dt (Rocof) 6 per NA NA NA ON
1270 Vector Jump 16deg NA 5 0
1310 Gen High Volt 1 107% 10 0 0 ON
1320 Gen High Volt 2 110% 5 2 0 ON
1330 Gen Low Volt 1 93% 10 0 0 ON
1340 Gen Low Volt 2 90% 7 2 0 ON
1350 Gen High Freq. 1 103% 10 0 0 ON
1360 Gen High Freq. 2 105% 1 2 0 ON
1370 Gen Low Freq.1 98% 10 0 0 ON
1380 Gen Low Freq.2 96% 5 2 0 ON
1400 Fast Overcurrent 200% 0.5 5 0 OFF
1410 High Over Current 150% 1 5 0 OFF
1420 NA NA 1 1 0 OFF
1430 NA NA 0.2 2 0 OFF
1440 NA NA 1 4 0 OFF
Outputs
Channel Name Setpoint Timer Enabled
A B
Prepared By:
aipp POWER ENGINEERING GROUP
Victor
RELAY PROTECTION Date: 22-April- 2022
SETTINGS – DIESEL POWER Doc No: G423XXXXX
SUBSEA7, Espirito Santo, Brazil Page: 4 of 18 Rev: A
1MW, 60Hz, 0.416 KV Power Project Status: For Construction
1450 NA NA 30 0 0 OFF
1460 NA NA 30 1 0 OFF
1470 NA NA 5 0 0 OFF
1480 NA NA 5 1 0 OFF
1490 NA NA 5 0 0 OFF
1500 NA NA 5 0 0 OFF
1510 Spare NA 0 1 0 OFF
1520 Spare NA 0 0 0 OFF
1530 Spare NA 0 0 0 OFF
1540 Spare NA 0 0 0 OFF
1550 Alt RTD3 Warning NA 10 0 0 OFF
1560 Alt RTD3 Shutdown NA 10 1 0 OFF
1570 Low Fuel Level 5% 10 1 0 ON
1580 High Fuel Level 90% 10 1 0 ON
1590 Alt RTD1 Warning 138 10 0 0 ON
1600 Alt RTD1 Shutdown 146 10 1 0 ON
1610 Alt RTD2 Warning 138 10 0 0 ON
1620 Alt RTD2 Shutdown 146 10 1 0 ON
1630 Over Speed1 1980 3 4 0 ON
1640 Over Speed2 1980 1 1 0 OFF
1650 Under Speed1 1350 7 2 0 ON
1660 Under Speed2 1350 1 1 0 OFF
1670 Emergency Stop NA 0.2 2 0 ON
1680 Earth Leakage NA 0.2 2 0 ON
1690 Spare Term. 44 NA 0.2 5 0 OFF
1700 Air Flaps Close NA 0.2 0 0 ON
1710 AVR Over Voltage NA 0.2 2 0 ON
1720 Earth Leakage NA 0.2 2 0 ON
1730 Fuel Spillage NA 0.2 2 0 ON
1740 Fan Failure NA 0.2 1 0 ON
1750 Spare Term. 118 NA 0.2 2 0 OFF
1760 High Water Temp NA 0.2 2 0 ON
1770 Low Oil Pressure NA 0.2 2 0 ON
1780 Low water Pressure NA 0.2 2 0 ON
NOMINAL SETTINGS
Prepared By:
aipp POWER ENGINEERING GROUP
Victor
RELAY PROTECTION Date: 22-April- 2022
SETTINGS – DIESEL POWER Doc No: G423XXXXX
SUBSEA7, Espirito Santo, Brazil Page: 5 of 18 Rev: A
1MW, 60Hz, 0.416 KV Power Project Status: For Construction
4011 Nom. Frequency 60.00 NA NA NA NA
4012 Nom. Power 1079 NA NA NA NA
4013 Nom. Current 1655 NA NA NA NA
4014 Nom. Voltage 430 NA NA NA NA
4021 Volt Prim GEN 430 NA NA NA NA
4022 Volt Sec GEN 430 NA NA NA NA
4023 Current Prim 2000 NA NA NA NA
4024 Current Sec 5 NA NA NA NA
4031 Control Setting P (KW) 1048 NA NA NA NA
4032 Control Setting KVAR 30% NA NA NA NA
4033 Control Setting PF 0.85 NA NA NA NA
4061 Volt Prim Bus 430 NA NA NA NA
4062 Volt Sec Bus 430 NA NA NA NA
2b.LV CIRCUIT BREAKER SETTINGS – G3+
SET POINT FOR MICROLOGIC 5.0A
FUNCTION PARAMETER
G3+
Base Current In - Amps 2500
Ir (x In) 0.86
Long Time Rated (51)
tr (s) 0.5
Isd (x Ir) NA
Short Time Rated (50) I2t NA
tsd (s) NA
Inst. Element (50) Ii (x In) 8
Prepared By:
aipp POWER ENGINEERING GROUP
Victor