Steel Fibre Method Statement
Steel Fibre Method Statement
A. GROUND PREPARATION
Maccaferri (Philippines), Inc. 11Floor, Asian Star Building, 2404 ASEAN Drive, Filinvest Corporate City
Alabang, 1781 Muntinlupa City, Philippines
www.maccaferri.com/ph Tel: +63-2 8889-0623
3. Discussion regarding casting sequence, flooring contractor before the actual
capacity and methodology shall be concreting works, to finalize the concrete
determined by flooring contractor before design mix and to observe quality of floor
actual casting. being executed.
4. Perform trial mix and sample slab casting
(if required) with the concrete supplier and
Maccaferri (Philippines), Inc. 11Floor, Asian Star Building, 2404 ASEAN Drive, Filinvest Corporate City
Alabang, 1781 Muntinlupa City, Philippines
www.maccaferri.com/ph Tel: +63-2 8889-0623
3. To ensure the SF volume for every batch, 4. Erect a scaffolding (x2 stack high) platform
prepare the total weight of steel fibre for adding steel fibres manually incase the
needed per batch and placed it near to dosing system unfunctional.
dosing machine or platform before the truck
mixer ready.
C. CONCRETING
Maccaferri (Philippines), Inc. 11Floor, Asian Star Building, 2404 ASEAN Drive, Filinvest Corporate City
Alabang, 1781 Muntinlupa City, Philippines
www.maccaferri.com/ph Tel: +63-2 8889-0623