PetroSync - Coiled Tubing Operation 2023 Oil Gas Training
PetroSync - Coiled Tubing Operation 2023 Oil Gas Training
Course Objectives
Course Overview
This oil and gas course online is designed to introduce an overview of the coiled tubing operations concept and its
applications in oil fields. It introduces variety of the coiled tubing technologies with special attention to the unit as
surface equipment and downhole tools. The course also covers the main components, application envelope and
coiled tubing special applications as well as the contingency plan for all possible situations which could be
encountered throughout various operations. Moreover, the course provides better understanding, enhance
knowledge and strengthen the decision-making capability of the participants about all types of wellbore
treatments implemented to recover or enhance the well performance throughout presentations, case studies, group
discussions and exercise as well as practical videos of actual cases.
Training Methods
The course is based on a balanced combination of classroom teaching and syndicate exercises supported by case
studies and exercises. It is designed based on leading industry knowledge and practical case studies discussions and
analysis to provide an interactive learning environment. The course further includes practical video clips as visual aids
to further develop easier approach for understanding the technical information. During the course, in addition to the
group discussions and exercises quizzes are conducted on daily basis to keep the information live, however,
evaluation of the learning process will be concluded throughout conducting pre & post course tests at the start
and end of the course session.
PROGRAM SCHEDULE
09:00 Registration (Day1)
09:10 – 11:00 Session I
11:00 – 11:15 1st Tea Break
11:15 – 13:30 Session II
13:30 – 14:30 Lunch Break
14:30 – 16:00 Session III
16:00 – 16:15 2nd Tea Break
16:15 – 17:00 Session IV
17:00 End of Day
*Schedule may vary for each oil gas course.
Course Agenda
Day 1
Pre-course test
Module 1 : Well Completion Types Module 4 : Introduction to the Coiled Tubing Unit
Definition of well Introduction
completion Well completion Coiled tubing description
Classification X-masTree Coiled tubing equipment design
Wellhead Coiled tubing applications
Casings Coiled tubing advantages
Liners Coiled tubing disadvantages
Production Tubing String Group discussion & exercises
Packers
Sub-Surface Control System (SC-SSSVs) Day 2
Wellhead Control System Quizzes & recap
Artificial lift completions (ESP, GL) Module 5 : Coiled Tubing Surface Equipment
RSmart Completions Depth meter
Impact of well completion selection on future well Goose neck
intervention operations in wells Injector head
Coiled tubing reel
Module 2 : Well Completion Operations Prime movers
Definition of well completion
PowerPack
concept Perforation
Stripper (conventional, side door)
Types
BOP
Guns
Bullets
Module 6 : Surface Equipment Handling &
Phasing
TCP Testing Procedures
Stimulation operations Depth meter
Basics and Injector
concept Candidates head Reel
selection Power pack
Reservoir lithology & impact on stimulation
Control
methodology
Hydraulic Fracturing cabin
Pressure control
Module 3 : Well Intervention Operations equipment BOP
Conventional : Stripper (conventional, side door)
Coiled Tubing Operations RTMS
-Well kick-off operations
-Stimulation Auxiliary surface equipment
-Scale Removal
Module 7 : Coiled Tubing Downhole Tools
-Cement Squeeze
-Fishing Operations Standard threads
Well killing & securing for well routine maintenance operations Grapper connectors
Wireline (Slick, E-line) Connectors
Snubbing operations Check valves
Well Testing (PTS, MPFM)
Nozzles & Jetting subs
Non-Conventional
Swivel joint Release joints PRV Centralizers Accelerators Jars
Well Control
Emergency Overshots
Impact of well completion and well intervention operations Spears
Downhole Tractor
PetroSync Global Pte PetroSync PetroSync
Ltd
Malaysia
Module 8 : Pre-Job Safety Procedures uses Fill cleaning
General requirements Scale removal
General HSE aspects
PTW
TBM
Coiled tubing well control drill
Day 3
Quizzes & recap
Module 9 : High Pressure Coiled
Tubing Module 10 : Coiled Tubing
Applications
Matrix treatment
Logging operations (open hole, Cased hole)
Drilling contingencies
Squeeze cement
Under reaming/milling
Inflatable packers and bridge
plugs Coiled tubing drilling
Coiled tubing completion
Well Kick-off
Fill Cleaning
Scale removal
Well control/killing
Excessive water/gas shut-off
Fishing operations
P&A
Artificial lift
Sands/non-cementious materials placement
Case Studies
Matrix treatment operations
Logging Operations
Cement Squeeze Operations
Mill & under-reaming operations
Fill Cleaning
Scale removal operations
Fishing operations of downhole lost tools
Well kick off & activation
Cement squeeze Operation
Day 4
Quizzes & recap
Module 13 : Coiled Tubing Contingency
Procedures
Module 14 : Coiled Tubing Operational
Troubleshooting & Case History
Module 15 : Coiled Tubing
Maintenance Module16:
Reservoirs and Rock Properties
Definition of
Reservoir
Reservoir
Heterogeneities
Reservoir
Characteristics:
Porosity
Permea
bility
Relative
Permeab
ility
Saturat
PetroSync Global Pte PetroSync PetroSync
Ltd
Malaysia
Module 20 : Sand Control Completion Overview
Formation damage from completion and Workover Sand production problem
fluid Formation damage from oil and gas production What are the consequences of sand production?
activities Formation damage from scales Sand Detection
Formation damage from organic Sand monitoring
deposits Formation damage from Measuring Sand production
Wettability changes Formation damage Sand Prediction and Monitoring
from Acid stimulation What causes sand production?
Formation damage from Injection (water injection, CO2 injection, Types of sand failure
polymer flooding, steam flooding How to predict sand production in new wells
Case Studies How to predict sand failure during well production
Well productivity sudden decline and identifying proper treatment Sand Control Completion
requirements Selective perforation method
Production profile slope change& how to use the data in defining Cased hole gravel pack
the problem Frackpack
Perforating for sand control
Utilizing production history graph to detect the damage
Frac pack completion: success of a frac pack, frac pack limitations,
How to use PBU/PFO tests to identify the skin factor as Frac pack fluids, frac pack installation and treatment procedure
indicator for formation damage. Gravel pack I Frac pack evaluation
Partial penetration and slanted skin effect Sand Control field operations step
Impact of perforation skin factor Case study
Pre-Course test
Day 5
Quizzes & recap
Module 18 : Stimulation of Sandston Reservoir
Why stimulating a Sandstone reservoir?
Sandstone reservoir description-
mineralogy
Acid formulation and lab tests e.g., acid response curve,
compatibility test, return permeability test, etc.
How much overflush is required
How to avoid fluoride precipitation in sandstone stimulation
Case study
Publications
* Price is nett excluding Withholding Tax if any and will be quoted separately. DATA PROTECTION
Please send us the withholding tax payment receipt. The information you provide will be safeguarded by
PetroSync that may be used to keep you informed of
relevant products and services. As an international
group we may transfer your data on a global basis for
the purpose indicated above. If you do not want us to
DELEGATE DETAILS share your information with other reputable
companies, please tick this box
1st Delegate Name Mr Mrs Ms Dr Others
Direct Line Number: Email: CANCELLATION POLICY
Delegates who cancel after the training is officially
Mobile Number: Job Title: confirmed run by email, are liacble to pay the full
course oil and gas fee and no refunds will be granted.
Department: Head of Department: You may substitute delegates at any time as long as
reasonable advance notice is given to Petrosync.
2nd Delegate Name Mr Mrs Ms Dr Others
In the event that PetroSync cancels or postpones or
Direct Line Number: Email:
change the trainer or change the training location
Mobile Number: Job Title: (classroom / virtual) of an event for any reason and
that the delegate is unable or unwilling to attend in
Department: Head of Department: on the rescheduled date, you will receive a credit
voucher for 100% of the contract fee paid. You may
3rd Delegate Name Mr Mrs Ms Dr Others use this credit voucher for another PetroSync to be
mutually agreed with PetroSync, which must occur
Direct Line Number: Email:
within a year from the date of postponement.
Mobile Number: Job Title:
PetroSync is not responsible for any loss or damage
Department: Head of Department: as a result of the cancellation policy. PetroSync will
assume no liability whatsoever in the event this event
4th Delegate Name Mr Mrs Ms Dr Others is cancelled, rescheduled or postponed due to any Act
of God, fire, act of government or state, war, civil
Direct Line Number: Email: commotion, insurrection, embargo, industrial action, or
Mobile Number: Job Title: any other reason beyond management control.
All bank charges to be borne by payer. Please ensure that PetroSync Global Pte Ltd receives the full invoiced
amount.
COURSE CONFIRMATION
I agree to PetroSync’s payment terms and cancellation policy.
Signature :
Date :
PAYMENT TERMS : Payment is due in full at the time of registration. Full payment is mandatory for event attendance.