0% found this document useful (0 votes)
205 views11 pages

PetroSync - Coiled Tubing Operation 2023 Oil Gas Training

The document announces an upcoming training course on coiled tubing operations from June 12-16, 2023 in Kuala Lumpur, Malaysia, which will be led by an experienced instructor and cover topics such as coiled tubing equipment, applications, operations techniques, and wellbore treatments to improve performance and recovery. The training is intended for engineers and operators with 0-10 years of experience and will include presentations, case studies, exercises, and videos.

Uploaded by

Petro Sync
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
205 views11 pages

PetroSync - Coiled Tubing Operation 2023 Oil Gas Training

The document announces an upcoming training course on coiled tubing operations from June 12-16, 2023 in Kuala Lumpur, Malaysia, which will be led by an experienced instructor and cover topics such as coiled tubing equipment, applications, operations techniques, and wellbore treatments to improve performance and recovery. The training is intended for engineers and operators with 0-10 years of experience and will include presentations, case studies, exercises, and videos.

Uploaded by

Petro Sync
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 11

PetroSync Global Pte Ltd PetroSync PetroSync

Coiled Tubing Operation


Improve your Coiled Tubing Operations, Concept and Applications from the Expert !
Course Level : Basic - Intermediate
th th
12 - 16 June 2023 at Kuala Lumpur, Malaysia

Petrosync Distinguished Instructor A lot of Practical


Things,
Magdi El Naggar Case Studies and
Managing Director Exercises !
Oil Fields Global Consultants (OFGC)
Officially Certified as Professional Petroleum Engineering Consultant (License 116/7).
Technical Advisor for several companies in the Middle & Far Easts, Africa and Gulf
countries.
46 years of professional experience in various phases of Petroleum/Reservoir/Production/Drilling
& Workover Engineering and field operations with several multi-national international
companies including ARAMCO (Saudi Arabia) and ADCO (UAE).
Professional in all phases of well intervention operations utilizing coiled tubing and well control
as well as extended reach operations.

Course Objectives

Understand the fundamentals & concept of the coiled tubing unit


Increase awareness and knowledge of the coiled tubing operations and factors affecting its performance.
Acquire necessary knowledge of the coiled tubing operational techniques, technologies and equipment
Understand alternate deployment scenarios and multisensory applications for surveillance and optimization.
Possess the basic skills required to select and implement various coiled tubing techniques as per operational
requirements. Be able to handle various coiled tubing emergency situations, plan its operations, monitor and
analyze its performance.
Learn strategies and best practices for coiled tubing operations optimization.
Understand the geological and basic reservoir properties Understand the formation damage concept and
mechanism. Understand the effect of formation damage on revenue of the operator.
Understand the impact of skin damage effect on productivity for both vertical and
horizontal wells. Gain knowledge about various types of wellbore treatments to remove
formation damage.
Acquire knowledge on how to select the best fluid (less damaging) at every phase of the well development: drilling,
completion, cementing, perforating, stimulation, gravel packing, workover, production and injection operations.

HYBRID TRAINING SOLUTIONS


FOCUS TRAINING • REDUCE COST • ENHANCED RESULTS
Over the years, there has been a growing demand for hybrid training programs. It is an excellant option to maximize your training dollar for your
specific training needs. We make it possible to run a training program that is customized totally to your training needs at a fraction of an in-house
budget!
If you like to know more about this excellent program, please contact us on +65 3159 0800 or email [email protected]
PetroSync Global Pte Ltd PetroSync PetroSync

Coiled Tubing Operation


12 - 16 June 2023 at Kuala Lumpur, Malaysia
th th

Course Overview

This oil and gas course online is designed to introduce an overview of the coiled tubing operations concept and its
applications in oil fields. It introduces variety of the coiled tubing technologies with special attention to the unit as
surface equipment and downhole tools. The course also covers the main components, application envelope and
coiled tubing special applications as well as the contingency plan for all possible situations which could be
encountered throughout various operations. Moreover, the course provides better understanding, enhance
knowledge and strengthen the decision-making capability of the participants about all types of wellbore
treatments implemented to recover or enhance the well performance throughout presentations, case studies, group
discussions and exercise as well as practical videos of actual cases.

Who Should Attend?

Production Engineers with 0-10 Years


Field Service Engineers with 0-10 Years Experience
Experience Drilling Engineers with 0-10 Years
Field Operations Engineers with 0-10 Years Experience
Experience Petroleum Engineers with 0-10 Years
Reservoir Engineers with 0-10 Years Experience
Experience Coiled Tubing Operators with 0-10
Coiled tubing Supervisorswith 0-10 Years Experience
Years Experience Operations Supervisors with 0-
Operations Engineers with 0-10 Years Experience
10 Years Experience

Training Methods

The course is based on a balanced combination of classroom teaching and syndicate exercises supported by case
studies and exercises. It is designed based on leading industry knowledge and practical case studies discussions and
analysis to provide an interactive learning environment. The course further includes practical video clips as visual aids
to further develop easier approach for understanding the technical information. During the course, in addition to the
group discussions and exercises quizzes are conducted on daily basis to keep the information live, however,
evaluation of the learning process will be concluded throughout conducting pre & post course tests at the start
and end of the course session.

PROGRAM SCHEDULE
09:00 Registration (Day1)
09:10 – 11:00 Session I
11:00 – 11:15 1st Tea Break
11:15 – 13:30 Session II
13:30 – 14:30 Lunch Break
14:30 – 16:00 Session III
16:00 – 16:15 2nd Tea Break
16:15 – 17:00 Session IV
17:00 End of Day
*Schedule may vary for each oil gas course.

WHY YOU SHOULD ATTEND PETROSYNC’S EVENTS


To ensure that all objectives of the course matches yours, all PetroSync programs are developed after intensive and extensive research within the
industry
PetroSync programs focus on your immediate working issues to ensure that you are able to apply and deliver immediate results in real work
situations
Application and implementation of industry knowledge and experience are the drivers for our course design, not theoretical academic lectures
PetroSync training focuses on practical interactive learning tools and techniques including case studies, group discussions, scenarios, simulations,
practical exercises and knowledge assessments during the ASME course Indonesia. Invest a small amount of your time to prepare before attending
the course to ensure maximum learning
PetroSync Global Pte Ltd PetroSync PetroSync

Coiled Tubing Operation


12 - 16 June 2023 at Kuala Lumpur, Malaysia
th th

Course Agenda

Day 1
Pre-course test
Module 1 : Well Completion Types Module 4 : Introduction to the Coiled Tubing Unit
Definition of well Introduction
completion Well completion Coiled tubing description
Classification X-masTree Coiled tubing equipment design
Wellhead Coiled tubing applications
Casings Coiled tubing advantages
Liners Coiled tubing disadvantages
Production Tubing String Group discussion & exercises
Packers
Sub-Surface Control System (SC-SSSVs) Day 2
Wellhead Control System Quizzes & recap
Artificial lift completions (ESP, GL) Module 5 : Coiled Tubing Surface Equipment
RSmart Completions Depth meter
Impact of well completion selection on future well Goose neck
intervention operations in wells Injector head
Coiled tubing reel
Module 2 : Well Completion Operations Prime movers
Definition of well completion
PowerPack
concept Perforation
Stripper (conventional, side door)
Types
BOP
Guns
Bullets
Module 6 : Surface Equipment Handling &
Phasing
TCP Testing Procedures
Stimulation operations Depth meter
Basics and Injector
concept Candidates head Reel
selection Power pack
Reservoir lithology & impact on stimulation
Control
methodology
Hydraulic Fracturing cabin
Pressure control
Module 3 : Well Intervention Operations equipment BOP
Conventional : Stripper (conventional, side door)
Coiled Tubing Operations RTMS
-Well kick-off operations
-Stimulation Auxiliary surface equipment
-Scale Removal
Module 7 : Coiled Tubing Downhole Tools
-Cement Squeeze
-Fishing Operations Standard threads
Well killing & securing for well routine maintenance operations Grapper connectors
Wireline (Slick, E-line) Connectors
Snubbing operations Check valves
Well Testing (PTS, MPFM)
Nozzles & Jetting subs
Non-Conventional
Swivel joint Release joints PRV Centralizers Accelerators Jars
Well Control
Emergency Overshots
Impact of well completion and well intervention operations Spears
Downhole Tractor
PetroSync Global Pte PetroSync PetroSync
Ltd

Coiled Tubing Operation


12 - 16th June 2023 at Kuala Lumpur,
th

Malaysia
Module 8 : Pre-Job Safety Procedures uses Fill cleaning
General requirements Scale removal
General HSE aspects
PTW
TBM
Coiled tubing well control drill

Day 3
Quizzes & recap
Module 9 : High Pressure Coiled
Tubing Module 10 : Coiled Tubing
Applications
Matrix treatment
Logging operations (open hole, Cased hole)
Drilling contingencies
Squeeze cement
Under reaming/milling
Inflatable packers and bridge
plugs Coiled tubing drilling
Coiled tubing completion
Well Kick-off
Fill Cleaning
Scale removal
Well control/killing
Excessive water/gas shut-off
Fishing operations
P&A
Artificial lift
Sands/non-cementious materials placement
Case Studies
Matrix treatment operations
Logging Operations
Cement Squeeze Operations
Mill & under-reaming operations
Fill Cleaning
Scale removal operations
Fishing operations of downhole lost tools
Well kick off & activation
Cement squeeze Operation

Module 11 : Coiled Tubing Operation


Procedure
Pre-Job requirements
Scaffolding
Pre-job equipment requirements
Coiled tubing rigging-up & function testing
Treating line rigging-up & testing
General running procedures
Operational procedures:
Well Control/Killing
Well Kick-off
Nitrogen properties &
PetroSync Global Pte PetroSync PetroSync
Ltd

Coiled Tubing Operation


th ion
12 - 16th June 2023 at Kuala Lumpur,
Natural Fracturing
Excessive Malaysia Pressures
water/gas shut- Reservoir Pressure
off P&A Basic Pressure calculations
Well stimulation Pressure Differential
Production logging pressure Well Temperature
deployment procedures Fishing Drilling Fluids
operations Completion Fluids
Rigging down and HSE Module 17 : Formation Damage
requirements Coiled tubing Types of formation damage
stability during mobilization Classification of Formation damage by process
Module 12 : Coiled Tubing Technical Data Sources of formation damage
Definitions Skin and impact on well productivity
Coiled tubing Formation damage laboratory tests (return permeability test, formation
operating limits initiation pressure test, cake lift off test, etc.
Burst pressure Formation damage from drilling
Collapse mud/processes Formation damage from
pressure perforations
Coiled
tubing
ovality
Fatigue and
corrosion
Stress and
strain
Forces affecting the coiled
tubing performance Buckling
Depth correction and stuck point calculations
Helicalloc
k-up
Catastrophi
c buckling

Day 4
Quizzes & recap
Module 13 : Coiled Tubing Contingency
Procedures
Module 14 : Coiled Tubing Operational
Troubleshooting & Case History
Module 15 : Coiled Tubing
Maintenance Module16:
Reservoirs and Rock Properties
Definition of
Reservoir
Reservoir
Heterogeneities
Reservoir
Characteristics:
Porosity
Permea
bility
Relative
Permeab
ility
Saturat
PetroSync Global Pte PetroSync PetroSync
Ltd

Coiled Tubing Operation


12 - 16th June 2023 at Kuala Lumpur,
th

Malaysia
Module 20 : Sand Control Completion Overview
Formation damage from completion and Workover Sand production problem
fluid Formation damage from oil and gas production What are the consequences of sand production?
activities Formation damage from scales Sand Detection
Formation damage from organic Sand monitoring
deposits Formation damage from Measuring Sand production
Wettability changes Formation damage Sand Prediction and Monitoring
from Acid stimulation What causes sand production?
Formation damage from Injection (water injection, CO2 injection, Types of sand failure
polymer flooding, steam flooding How to predict sand production in new wells
Case Studies How to predict sand failure during well production
Well productivity sudden decline and identifying proper treatment Sand Control Completion
requirements Selective perforation method
Production profile slope change& how to use the data in defining Cased hole gravel pack
the problem Frackpack
Perforating for sand control
Utilizing production history graph to detect the damage
Frac pack completion: success of a frac pack, frac pack limitations,
How to use PBU/PFO tests to identify the skin factor as Frac pack fluids, frac pack installation and treatment procedure
indicator for formation damage. Gravel pack I Frac pack evaluation
Partial penetration and slanted skin effect Sand Control field operations step
Impact of perforation skin factor Case study
Pre-Course test
Day 5
Quizzes & recap
Module 18 : Stimulation of Sandston Reservoir
Why stimulating a Sandstone reservoir?
Sandstone reservoir description-
mineralogy
Acid formulation and lab tests e.g., acid response curve,
compatibility test, return permeability test, etc.
How much overflush is required
How to avoid fluoride precipitation in sandstone stimulation
Case study

Module 19 : Stimulation of Carbonate Reservoir


Why stimulating a carbonate reservoir?
Carbonate reservoir description -
mineralogy
Acid formulation and lab tests e.g., acid response curve,
compatibility test, return permeability test, etc.
What is the big deal about wormholes?
How to ensure the best acid coverage? Open hole? Cased
hole? Acid placement in heterogeneous reservoir? Use of
diverting agents How to ensure the best zonal coverage?
Practical guidelines on how to select and evaluate acid
treatment Case study
PetroSync Global Pte PetroSync PetroSync
Ltd

Coiled Tubing Operation


IN-HOUSE SOLUTIONS 12 - 16th June 2023 at Kuala Lumpur,
th

SAVE COST • IMPROVE PERFORMANCE • REDUCE RISK Malaysia


PetroSync understands that in current economic climate, getting an excellent return on your training investment is critical for all our clients. This
excellent training can be conducted exclusively for your organization. The training can be tailored to meet your specific needs at your preferred
location and time. We will meet you anywhere around the globe.
If you like to know more about this excellent program, please contact us on +65 3159 0800 or email [email protected]
PetroSync Global Pte Ltd PetroSync PetroSync

Coiled Tubing Operation


12 - 16 June 2023 at Kuala Lumpur, Malaysia
th th

Petrosync Distinguished Instructor


Magdi El Naggar
Managing Director
Oil Fields Global Consultants (OFGC)
Magdi El Naggar is officially Certified as Professional Petroleum Engineering Consultants (License
116/7) He has 46 years of professional experience n various phases of Petroleum Engineering
including Petroleum/Reservoir/Production/Drilling & Workover Engineering as well as field operations
with several
multi-national international companies including ARAMCO (Saudi Arabia) and ADNOC (UAE).
He has extensive professional experiences in all phases of well intervention operations including
coiled tubing, especially during well emergency cases, well control and extended reach
operations.
He specialized in well intervention operations, especially, during emergency cases and well
blowouts. He also has extensive experiences in full field development studies, Production
Enhancement for oil fields as well as various types of wells, CO2 Injection and EOR operations,
IWCF & IADC oil and gas certification.

Publications

Coiled Tubing Operations Standard Procedures


Production Engineering Operations Standard Procedures
Recently, completed a total of 3,000 research papers in various topics of O & G industry since 2014

Partial Client List

SHELL OGS (Egypt)


TOTAL (Indonesia) APEX
Schlumbergers (Iraq) Petromentor (China)
EXXON - ARAMCO CNPCIC (China)
ADCO Oman Gas
Murphy Oman Petrogas
Sapura (Malaysia) Sohar Aluminum (Oman)
Arabian Gulf Petrofac
GUPCO (Egypt) OXY (Oman)
ARAMCO Talisman
Osterreichische Mineralol (OMV)
IN-HOUSE SOLUTIONS
SAVE COST • IMPROVE PERFORMANCE • REDUCE RISK
PetroSync understands that in current economic climate, getting an excellent return on your training investment is critical for all our clients. This
excellent training can be conducted exclusively for your organization. The training can be tailored to meet your specific needs at your preferred
location and time. We will meet you anywhere around the globe.
If you like to know more about this excellent program, please contact us on +65 3159 0800 or email [email protected]
COURSE DETAILS PROGRAMME CONSULTANT
Title : Coiled Tubing Operation Name : Cay Aagen
Date : 12th - 16th June 2023 Email : [email protected]
Location : Kuala Lumpur, Malaysia Phone : +65 3159 0800
Fax : +65 6826 4322
INVESTMENT PACKAGES TERMS AND CONDITIONS
Please checklist the package that you are attending! DISCLAIMER
Please note that trainers and topics were confirmed
Coiled Tubing Operation LOCATION PRICE
at the time of publishing; however, PetroSync may
necessitate substitutions, alterations or cancellations
SCHEDULE of the trainers or topics or location (classroom /
Virtual). As such, PetroSync reserves the right to
Kuala Lumpur, change or cancel any part of its published
12th - 16th June 2023 USD 2,995 programme due to unforeseen circumstances. Any
Malaysia substitutions or alterations will be updated on our
web page as soon as possible

* Price is nett excluding Withholding Tax if any and will be quoted separately. DATA PROTECTION
Please send us the withholding tax payment receipt. The information you provide will be safeguarded by
PetroSync that may be used to keep you informed of
relevant products and services. As an international
group we may transfer your data on a global basis for
the purpose indicated above. If you do not want us to
DELEGATE DETAILS share your information with other reputable
companies, please tick this box
1st Delegate Name Mr Mrs Ms Dr Others
Direct Line Number: Email: CANCELLATION POLICY
Delegates who cancel after the training is officially
Mobile Number: Job Title: confirmed run by email, are liacble to pay the full
course oil and gas fee and no refunds will be granted.
Department: Head of Department: You may substitute delegates at any time as long as
reasonable advance notice is given to Petrosync.
2nd Delegate Name Mr Mrs Ms Dr Others
In the event that PetroSync cancels or postpones or
Direct Line Number: Email:
change the trainer or change the training location
Mobile Number: Job Title: (classroom / virtual) of an event for any reason and
that the delegate is unable or unwilling to attend in
Department: Head of Department: on the rescheduled date, you will receive a credit
voucher for 100% of the contract fee paid. You may
3rd Delegate Name Mr Mrs Ms Dr Others use this credit voucher for another PetroSync to be
mutually agreed with PetroSync, which must occur
Direct Line Number: Email:
within a year from the date of postponement.
Mobile Number: Job Title:
PetroSync is not responsible for any loss or damage
Department: Head of Department: as a result of the cancellation policy. PetroSync will
assume no liability whatsoever in the event this event
4th Delegate Name Mr Mrs Ms Dr Others is cancelled, rescheduled or postponed due to any Act
of God, fire, act of government or state, war, civil
Direct Line Number: Email: commotion, insurrection, embargo, industrial action, or
Mobile Number: Job Title: any other reason beyond management control.

Department: CERTIFICATE OF ATTENDANCE


Head of Department: 80% attendance is required for PetroSync's Certificate
of Attendance.
*Please fill all the details including mobile number. This help us to contact participant if they are late in class or if there
is any urgent update (through whatsapp/call) DETAILS
INVOICE DETAILS Please accept our apologies for mail or email that is
incorrectly addressed.
Attention Invoice to: Please email us at [email protected] and
Direct Line Number: Fax: inform us of any incorrect details. We will amend them
accordingly.
Company: Industry :
Address: Postcode: Find us on Social Media:

Country: Email: PetroSync Global Pte Ltd


Please note:
- Indicate if you have already registered by Phone Fax Email Web PetroSync
- If you have not received an acknowledgement before the API training Indonesia , please call us to confirm your booking.
PetroSync
PAYMENT
By Credit Card
METHODS CHARGES & FEE(s)
By Direct Transfer : Please quote invoice number(s) on remittance advice
- For Payment by Direct TelegraphicTransfer,
PetroSync Global Pte Ltd Bank details: client has to bear both local and oversea bank
Account Name : PetroSync Global Pte Ltd charges.
Bank Name : DBS Bank Ltd
Bank Code : 7171 • Bank Swift Code : DBSSSGSGXXX • Branch code : - For credit card payment, there is additional
288 Account No : 0288-002682-01-6 (USD) 4% credit card processsing fee.
Bank Address : 12 Marina Boulevard, Level 3. Marina Bay Financial Centre Tower 3. Singapore 018982

All bank charges to be borne by payer. Please ensure that PetroSync Global Pte Ltd receives the full invoiced
amount.

COURSE CONFIRMATION
I agree to PetroSync’s payment terms and cancellation policy.

Signature :
Date :
PAYMENT TERMS : Payment is due in full at the time of registration. Full payment is mandatory for event attendance.

You might also like