JSA - Non-Destructive Testing (NDT) - Magnetic Particle Test

This document provides a job safety analysis for non-destructive testing using magnetic particle testing. It identifies hazards associated with mobilizing crews such as traffic hazards from speeding or inexperienced drivers. It also identifies hazards associated with the magnetic particle testing itself such as injury from falling equipment or working at heights without fall protection. Control measures are provided, such as tool box talks, using proper PPE, and ensuring only trained personnel handle equipment. Responsibilities are assigned for implementing control measures and reducing risks.

Uploaded by

Raju
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
561 views7 pages

JSA - Non-Destructive Testing (NDT) - Magnetic Particle Test

This document provides a job safety analysis for non-destructive testing using magnetic particle testing. It identifies hazards associated with mobilizing crews such as traffic hazards from speeding or inexperienced drivers. It also identifies hazards associated with the magnetic particle testing itself such as injury from falling equipment or working at heights without fall protection. Control measures are provided, such as tool box talks, using proper PPE, and ensuring only trained personnel handle equipment. Responsibilities are assigned for implementing control measures and reducing risks.

Uploaded by

Raju
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 7

Page 2 of 6

JOB SAFETY ANALYSIS WORK SHEET


FACILITY / SITE: MANGALA UPGRADATION PROJECT STAGE-2 (EPC-2) DATE : PAGE No: 1
AREA JSA REF
AUTHORITY: No:
DEPT. PTW

DEPARTMENT / SYSTEM / LOCATION: Operation / Rajasthan

TASK DESCRIPTION: JOB SAFETY ANALYSIS TEAM (FIRST NAMED-JSA TEAM LEADER)
Non-Destructive Testing (NDT) – Magnetic Particle Test NAME POSITION
Cairn Construction Civil Engineer
Contractor Site Supervisor
Contractor Site HSE Engineer
Cairn Construction HSE Engineer

REFERENCES AND OTHER RELEVANT INFORMATION : (e.g. Emergency Provision Required,


Competency requirements, Tools & Equipment, P&ID’s, Drawings, Procedures, Certificates, other Job Safety JSA Reviewed
Analysis’s)
NAME
(PRINT) :
POSITION :

SIGNATURE

DATE :
Sl ACTIVITY HAZARD HAZARD EFFECT IR CONTROL MEASURES Responsibility RR
no
E P R E P R

 Over  Collision with 3 2 M  Tool box talk to be given before start Section In charge / 2 1 L
speeding other vehicle work Site Engineer
vehicle  Property  Follow speed limits as specified in
Damaged cairn road transport safety policy.
Injury to person  Follow road sign board/ follow speed
limit

 Inexperienc  Collision with 3 2 M  Driver shall have valid driving Section In charge / 2 1 L
e driver other vehicle license. Site Engineer
engaged for  Property  Drivers shall attend HSE induction
driving. Damaged before engaging them on job.
 Injury to person  Follow traffic rules & make sure
1.  Traffic  Hit injury brakes are function all the time.
Mobilization Hazards  Don’t use cell phone while driving.
of Crew  Make sure your vehicles lights;
dippers are functional all the time
especially night.
 CIL approved vehicle shall be used
 Don’t drive the vehicle under
influence of alcohol

 Overtaking  Collision with 3 2 M  Overtake vehicle by seeing Section In charge / 2 1 L


other vehicle clearance & by giving signal. Site Engineer

 Sharp curve  Collision with 3 2 M  Follow the instruction given on safety Section In charge / 2 1 L
/bend on other vehicle signage. Site Engineer
road.
Magnetic  Injury due to  Injury to 3 3 H  Tool box Talk Section In charge / 3 1 L
particle test fall of workmen  Skill person shall handle the job. Site Engineer
2. equipment.  Property  Machine shall be handling as per
Damaged manufacture’s instruction.
 Ensure that trained person only
handling the equipment

Page | 2
Sl ACTIVITY HAZARD HAZARD EFFECT IR CONTROL MEASURES Responsibility RR
no
E P R E P R

Working at  Fall of 3 3 H  Tool box talk shall be conducted. Section In charge / 3 1 L


height material  Proper PPE shall be used Site Engineer
 Fall of person  Toe board shall be installed
 Property  Ladder shall be in good condition and
damage shall be tied off or held by a co-
worker
 Any materials should be brought with
the help of rope
 Scaffold should have inspection tag
 Use tool box to keep materials at
height
 Life line shall be provide if necessary
 Use full body harness while working
at height
 Provide proper work platform for
work at height activity
 Area should be cordon of and install
signboards during height work
 All personnel exposed work at height
must be trained for fall protection
Electrocution shock injury to 3 3 H  Ensure all electrical connection Section In charge / 3 1 L
workmen routed through ELCB / RCCB. Site Engineer
 Ensure proper Body earthing &
Plug Tops
 Ensure daily inspection for cables
to check wear & tear
 Daily Tool box talk prior to work

Manual  Back Injury  Reduce manual handling and use Section In charge /
Handling  Entrap Finger mechanical aids Site Engineer
Hazard  Pinch point  Follow manual handling procedure
 Maintain good communication and
cooperation during team lifting
 Conduct tool box talk and discuss
about the pinch point.

Page | 3
Sl ACTIVITY HAZARD HAZARD EFFECT IR CONTROL MEASURES Responsibility RR
no
E P R E P R

3 Fall of  Injury to 3 3 H  Tool box talk shall be conducted. Section In charge / 3 1 L


materials/ workmen  Proper PPE shall be used Site Engineer
persons /Fatality  Toe board shall be installed
 Property  Ladder shall be in good condition and
Damaged shall be tied off or held by a co-
worker
Working at  Any materials should be brought with
height the help of rope
 Scaffold should have inspection tag
 Use tool box to keep materials at
height
 Life line shall be provide if necessary
Use full body harness while
working at height
4 Working in  Cool, hot,  Injury to 2 3 M  Reflective cover all and protective Section In charge / 2 1 L
sandy stormy workmen / garments shall be provided to all Site Engineer
external
weather Fatality individual.
weather condition  Heat stress,  Potable water shall make available
 Scarcity of heat stroke, adequately or all workers location.
potable water dehydration  Emergency vehicle / ambulance shall
storage make available.
 Excess hot and storm weather work
shall be postponed till temp is coming
to a level where work can be
resumed. Rest and work system (15
min work and 5 min rest) to be
followed in case of temp more than
45 degree.
 Toolbox talk shall be conducted to
communicate the specific hazard to
all concerned employees.
 First aid box shall be ensured at site
 Follow CIL heat stress prevention
guideline
5 Housekeepin Accumulation Tripping /Falling 2 1 L  Housekeeping shall be maintained Section In charge / 1 1 L

Page | 4
Sl ACTIVITY HAZARD HAZARD EFFECT IR CONTROL MEASURES Responsibility RR
no
E P R E P R

g & close of hazard during the activity and at the end of Site Engineer
work for the job
of debris
day  Remove all unwanted materials
from the site
6 Emergency Extreme Collapse of 2 2 M  Evacuation procedure shall be in Section In charge / 2 1 L
response weather individual, Fire, place Site Engineer
condition, Explosion,  Emergency Response action to be
Lack of Unviability of communicated during TBT
supervision, emergency  Radio officer to be informed in case
of Emergency
Leakage of vehicle
Ensure emergency vehicle
toxic or arrangement is place
flammable
gases

Page | 5