Volume(V1-V2) = 0.007467-0.002407=0.00506M^3
= 0.00506X1440=7.286Kg
Cable No.3 :-
Structure Wise:-
227+649 MJB 32 Nos Girder = 576 Bags 12.7MM HT W
232+386 MJB 24 Nos Girder = 428 Bags 12.9MM HT W
239+620 MJB 40 Nos Girder = 700 Bags 12.9MM HT W
235+865 AUP 8 Nos Girder = 144 Bags 12.7MM HT W
241+630 AUP 8 Nos Girder = 138 Bags 12.9MM HT W
246+690 Viaduct 24 Nos Girder = 420 Bags 12.9MM HT W
Total = 2406 Cement Bags
Total = 120.30 MT (Cement)
Total = 2406 Cebex 200