This document is a transformer oil test report from the Central Engineering Research and Standards (CERS) laboratory in Tongi, Gazipur. It tests oil samples from the tanks and valves of two 20/26MVA transformers labeled T-1 and T-2 at the Botteswar substation in Sylhet. For T-1, the main tank results are good but the middle valve and OLTC results are poor. For T-2, the middle valve results are fair but the main tank and OLTC results are poor. CERS recommends centrifuging the oils using 10μm and 0.1μm filters, operating below 60°C and maintaining vacuum pressure between 0.08 to 0

Uploaded by

CERS Oil Lab
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
210 views6 pages

Sylhet Project With DGA-42

This document is a transformer oil test report from the Central Engineering Research and Standards (CERS) laboratory in Tongi, Gazipur. It tests oil samples from the tanks and valves of two 20/26MVA transformers labeled T-1 and T-2 at the Botteswar substation in Sylhet. For T-1, the main tank results are good but the middle valve and OLTC results are poor. For T-2, the middle valve results are fair but the main tank and OLTC results are poor. CERS recommends centrifuging the oils using 10μm and 0.1μm filters, operating below 60°C and maintaining vacuum pressure between 0.08 to 0

Uploaded by

CERS Oil Lab
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 6

Ò‡kL nvwmbvi D‡`¨vM, N‡i N‡i we`y¨rÓ

evsjv‡`k we`y¨r
ZË¡veavqK cÖ‡KŠkjxi `ßi
wmBAviGm, weD‡ev, UsMx,
MvRxcyi|

Dbœqb †evW© ‡Uwj‡db t 9811178,d¨v·t 9811182|

Bangladesh Power Development Board


CERS FORM No-21/A2

TRANSFORMER OIL TEST REPORT.


Sender: Executive Engineer, Project Division-1, Power Distribution System Development Project, Sylhet
Division, BPDB, Sylhet.
Reference No: 27.11.9100.728.07.006.21-563 , Dated:-.14/06/2021
Sample of Transformer: 20/26MVA,T-1 Transformer, Sl. No.- TB 190077 .
From (Station): 33/11KV, 2 x 20/26MVA Botteswar GIS Substation, BPDB,Sylhet.
No. Of Sample Supplied: 03 (three) nos.
CERS Received No.- 2316 , Dated :15/06/2021
CERS I.T No:21061542.
Standard Test value of Oil.
Sl. Test
Characteristics Value T-1, Sl. No: TB 190077
No. Method
Main Tank Middle valve OLTC
1. Appearance IEC 296 -- Clear Clear Clear
System Good > 40 KV 47 23 13
Dielectric Breakdown Voltage
2.
Voltage (KV)
IEC 156 below or
Fair 30 to 40 KV -- -- --
equal 72.5 KV Poor < 30 KV -- -- --
Serviceaged Oil
2.0 at 900c. (Maxm) -- -- --
Dielectric Dissipation IEC 247
1.0 at 260c. (Maxm) -- -- --
3.
Factor (tan δ) at 26°c.(%) 0.5 at 900c. (Maxm) -- -- --
New oil
0.2 at 260c. (Maxm) -- -- --
4. Dielectric Constant BS 148 2.2 -- -- --
5. Resistivity (Ohm. cm) at 26°c. IEC 296 1x10 Ohm. Cm (Minm)
14
3x1014 8x1013 5x1012
6. Specific Gravity at 26°c. IEC 296 0.895 at 200c gm/cm3(Maxm) 0.875 0.875 0.875
System Voltage Good < 30 PPM
IEC
7. Moisture Content 26°c. 60814
below or equal 72.5 Fair 30 to 40 PPM 29 41 57
KV Poor > 40 PPM
Good > 28 mN/m
IEC
8. Interfacial Tension 26°c. 60422
Fair 22 to 28 mN/m -- -- --
Poor < 22 mN/m
Remarks: -
a) Main tank results are good.
b) Middle valve & OLTC results are poor.
c) Oil need to be centrifuge by following instructions, than send again to CERS, Tongi for test.
 Using 10µm inlet filter & 0.1 µm outlet filter.
 Operating temperature should not be above 60oC.
 Maintain vacuum pressure 0.08 to 0.1 Mpa.

Sub-Assistant Engineer Assistant/Sub-Divisional Executive Engineer


CERS,BPDB,Tongi,Gazipur. Engineer CERS,
Ò‡kL nvwmbvi D‡`¨vM, N‡i N‡i we`y¨rÓ

evsjv‡`k we`y¨r
ZË¡veavqK cÖ‡KŠkjxi `ßi
wmBAviGm, weD‡ev, UsMx,
MvRxcyi|

Dbœqb †evW© ‡Uwj‡db t 9811178,d¨v·t 9811182|

Bangladesh Power Development Board


CERS FORM No-21/A2

TRANSFORMER OIL TEST REPORT.


Sender: Executive Engineer, Project Division-1, Power Distribution System Development Project, Sylhet
Division, BPDB, Sylhet.
Reference No: 27.11.9100.728.07.006.21-563 , Dated:-.14/06/2021
Sample of Transformer: 20/26MVA,T-2 Transformer, Sl. No.- TB 190078 .
From (Station): 33/11KV, 2 x 20/26MVA Botteswar GIS Substation, BPDB,Sylhet.
No. Of Sample Supplied: 03 (three) nos.
CERS Received No.- 2316 , Dated :15/06/2021
CERS I.T No:21061542.
Standard Test value of Oil.
Sl. Test
Characteristics Value T-2, Sl. No: TB 190078
No. Method
Main Tank Middle valve OLTC
1. Appearance IEC 296 -- Clear Clear Clear
System Good > 40 KV 29 34 13
Dielectric Breakdown Voltage
2.
Voltage (KV)
IEC 156 below or
Fair 30 to 40 KV -- -- --
equal 72.5 KV Poor < 30 KV -- -- --
Serviceaged Oil
2.0 at 900c. (Maxm) -- -- --
Dielectric Dissipation IEC 247
1.0 at 260c. (Maxm) -- -- --
3.
Factor (tan δ) at 26°c.(%) 0.5 at 900c. (Maxm) -- -- --
New oil
0.2 at 260c. (Maxm) -- -- --
4. Dielectric Constant BS 148 2.2 -- -- --
5. Resistivity (Ohm. cm) at 26°c. IEC 296 1x10 Ohm. Cm (Minm)
14
1x1014 3x1014 5x1013
6. Specific Gravity at 26°c. IEC 296 0.895 at 200c gm/cm3(Maxm) 0.875 0.875 0.875
System Voltage Good < 30 PPM
IEC
7. Moisture Content 26°c. 60814
below or equal 72.5 Fair 30 to 40 PPM 40 31 42
KV Poor > 40 PPM
Good > 28 mN/m
IEC
8. Interfacial Tension 26°c. 60422
Fair 22 to 28 mN/m -- -- --
Poor < 22 mN/m
Remarks: -
a) Middle valve results are fair.
b) Main tank & OLTC results are poor.
c) Oil need to be centrifuge by following instructions, than send again to CERS, Tongi for test.
 Using 10µm inlet filter & 0.1 µm outlet filter.
 Operating temperature should not be above 60oC.
 Maintain vacuum pressure 0.08 to 0.1 Mpa.
Ò‡kL nvwmbvi D‡`¨vM, N‡i N‡i we`y¨rÓ

evsjv‡`k we`y¨r
ZË¡veavqK cÖ‡KŠkjxi `ßi
wmBAviGm, weD‡ev, UsMx,
MvRxcyi|

Dbœqb
Sub-Assistant Engineer
CERS,BPDB,Tongi,Gazipur.
†evW©
Assistant/Sub-Divisional
Engineer CERS,
‡Uwj‡db t 9811178,d¨v·t 9811182|
Executive Engineer

Bangladesh Power Development


CERS,BPDB,Tongi,Gazipur Board
BPDB,Tongi,Gazipur.

CERS FORM No-21/A2

TRANSFORMER OIL (DGA) TEST REPORT.


Sender: Executive Engineer, Project Division-1, Power Distribution System Development Project, Sylhet
Division, BPDB, Sylhet.
Reference No: 27.11.9100.728.07.006.21-563 , Dated:-.14/06/2021
Sample of Transformer: 20/26MVA,T-1 Transformer, Sl. No.- TB 190077 .
From (Station): 33/11KV, 2 x 20/26MVA Botteswar GIS Substation, BPDB,Sylhet.
No. Of Sample Supplied: 03 (three) nos.
CERS Received No.- 2316 , Dated :15/06/2021
CERS I.T No:21061542.

Name of Dissolve Gases


Test value of Oil. IEEE C57.104 Limits (ppm)* Results
Main Tank Middle valve OLTC Normal Warning
Hydrogen H2 <5 <5 <5 ≤ 100 > 700 According to
IEEE C57.104
Carbon Di Oxide CO2 737 1023 740 ≤ 2500 > 4000 TM guide line,
DGA test data
Carbon Monoxide CO 19 10 10 ≤ 350 > 570
is satisfactory.
Ethylene C2H4 7 10 7 ≤ 50 > 100

Ethane C2H6 5 1 12 ≤ 65 > 100

Methane CH4 3 5 <1 ≤ 120 > 400

Acetylene C2H2 <0.5 0.5 <0.5 ≤1 >9

TDCG 34 26 30 ≤ 720 > 1920

Sub-Assistant Engineer Assistant/Sub-Divisional Executive Engineer


CERS,BPDB,Tongi,Gazipur. Engineer CERS,
CERS,BPDB,Tongi,Gazipur BPDB,Tongi,Gazipur.
Ò‡kL nvwmbvi D‡`¨vM, N‡i N‡i we`y¨rÓ

evsjv‡`k we`y¨r
ZË¡veavqK cÖ‡KŠkjxi `ßi
wmBAviGm, weD‡ev, UsMx,
MvRxcyi|

Dbœqb †evW© ‡Uwj‡db t 9811178,d¨v·t 9811182|

Bangladesh Power Development Board

CERS FORM No-21/A2

TRANSFORMER OIL (DGA) TEST REPORT.


Sender: Executive Engineer, Project Division-1, Power Distribution System Development Project, Sylhet
Division, BPDB, Sylhet.
Reference No: 27.11.9100.728.07.006.21-563 , Dated:-.14/06/2021
Sample of Transformer: 20/26MVA,T-2 Transformer, Sl. No.- TB 190078 .
From (Station): 33/11KV, 2 x 20/26MVA Botteswar GIS Substation, BPDB,Sylhet.
No. Of Sample Supplied: 03 (three) nos.
CERS Received No.- 2316 , Dated :15/06/2021
CERS I.T No:21061542.

Name of Dissolve Gases


Test value of Oil. IEEE C57.104 Limits (ppm)* Results
Main Tank Middle valve OLTC Normal Warning
Hydrogen H2 <5 <5 <5 ≤ 100 > 700 According to
IEEE C57.104
Carbon Di Oxide CO2 647 664 373 ≤ 2500 > 4000 TM guide line,
DGA test data
Carbon Monoxide CO 15 17 3 ≤ 350 > 570
is satisfactory.
Ethylene C2H4 4 4 10 ≤ 50 > 100

Ethane C2H6 4 9 12 ≤ 65 > 100

Methane CH4 1 7 9 ≤ 120 > 400

Acetylene C2H2 0 0 0 ≤1 >9

TDCG 24 36 33 ≤ 720 > 1920

Sub-Assistant Engineer Assistant/Sub-Divisional Executive Engineer


CERS,BPDB,Tongi,Gazipur. Engineer CERS,
CERS,BPDB,Tongi,Gazipur BPDB,Tongi,Gazipur.
Ò‡kL nvwmbvi D‡`¨vM, N‡i N‡i we`y¨rÓ

evsjv‡`k we`y¨r
ZË¡veavqK cÖ‡KŠkjxi `ßi
wmBAviGm, weD‡ev, UsMx,
MvRxcyi|

Dbœqb †evW© ‡Uwj‡db t 9811178,d¨v·t 9811182|

Bangladesh Power Development Board


Memo No: 27.11.3300.512.47.001.21. Dated: / / 2021.

Executive Engineer
Project Division-1
Power Distribution System Development Project
Sylhet Division, BPDB, Sylhet.
Subject: Transformer oil test bill.
Reference No: 27.11.9100.728.07.006.21-563, Dated:- 6/14/2021.
CERS Received No.-2316, Dated :6/15/2021.
CERS I.T No: 21061542.
The following bill has to be paid by depositing Pay-order/Bank draft in favor of Deputy Director
(Account) RAO,BPDB, Tongi, Account no: SND-66, Pubali Bank, Tongi Branch, Gazipur. Testing process
will start after submitting that Pay-order/Bank draft to the office of the undersigned.
Sl. No Test Name Number of Sample Bill/Sample Total (Taka)
1. Dielectric Breakdown Voltage Test 06(Six) 225/- 1350
2. Resistivity Test 06(Six) 300/- 1800
3. Specific Gravity Test 06(Six) 225/- 1350
4. Moisture Content Test 06(Six) 2000/- 12000
5. Dissolved Gas Analysis (DGA) Test 06(Six) 10000/- 60000
In Word: Seventy six thousands five hundred taka only Total Bill: 76500

Sub-Assistant Engineer Assistant/Sub-Divisional Engineer


CERS, BPDB, Tongi, Gazipur. CERS, BPDB, Tongi, Gazipur.
Bill No...333....... Bill Date:....6/15/2021........

Executive Engineer.
Division-3
CERS, BPDB, Tongi, Gazipur.
Memo No: 27.11.3300.512.47.001.21. Dated: / / 2021.
Copy to:-
1. Sub-Divisional Engineer, Oil Test Section, CERS, BPDB, Tongi, Gazipur.
2. Master Copy.
3. Office Copy.

Executive Engineer.
Ò‡kL nvwmbvi D‡`¨vM, N‡i N‡i we`y¨rÓ

evsjv‡`k we`y¨r
ZË¡veavqK cÖ‡KŠkjxi `ßi
wmBAviGm, weD‡ev, UsMx,
MvRxcyi|

Dbœqb †evW© ‡Uwj‡db t 9811178,d¨v·t 9811182|

Bangladesh Power Development Board


Division-3
CERS, BPDB, Tongi, Gazipur.

Memo No: 27.11.3300.512.47.001.21. Dated: / / 2021.

Executive Engineer
Project Division-1
Power Distribution System Development Project
Sylhet Division, BPDB, Sylhet.

Sub : Test Report of Transformer Oil.


Ref. No. : 27.11.9100.728.07.006.21-563, Dated:-14/06/2021.

Enclosed herewith the Test report of Transformer Oil which was communicated
vide memo under reference for your information & necessary action please.

Enclosed: As stated.

Superintending Engineer
CERS, BPDB, Tongi, Gazipur.

Memo No: 27.11.3300.512.47.001.21. Dated: / / 2021.

Copy to:-
1. Sub-Divisional Engineer, Division-3, CERS, BPDB, Tongi, Gazipur.
2. Master Copy.
3. Office Copy.

Executive Engineer.
Division-3
CERS, BPDB, Tongi, Gazipur.